RE: Questions1 Dec 2019 16:06
BMac, I used to work on electrical distribution projects in London albeit some time ago and the network was severely stretched. When exposing underground cables, some where hot to touch due to load. And this area being probably the most profitable region in the uk. The network is almost certainly not equipped to deal with 2-300 high current chargers.
If Rolec asked for the collaboration as the major provider in Europe I’d rather believe them than you.
H2 safety, legislation is there and designs will comply. End of story there.
And afc isn’t a one trick pony company. Liquid and solid cells, exchange membranes to meet different market requirement. When did you find out the world wasn’t flat BMac?
Jimiam, I won’t go into who would be a good fit as a manufacturing partner but do you think airbus build their own wings? No GKN aerospace do.