"Schlumberger and Baker Hughes were appointed to complete the core analysis and to report on the reasons for under-performance of past wells. The purpose of their work was to identify any substantial impediments to achieving potential commercial flow rates and to advise on the optimal well and stimulation design required to take the project forward. Notably the results from their analysis has confirmed the potential for substantially increased flow rates with the application of the appropriate stimulation technology suite."