Survey & Test Drill10 Aug 2021 16:51
This looks like the survey info :-
Site Survey in block 41/5, including 2D seismic, geophysical (SSS + MBES), grap sampling and shallow geotechnical (vibro-core + CPT). Mobilisation scheduled for August 5th. Expected duration: 11 days.
Start date: 04 Aug 2021
End date: 17 Aug 2021
Locations
41/5 Site Survey Greater Working Area
1 54°59.091'N 000°06.705'W
2 54°59.095'N 000°00.142'W
3 54°49.389'N 000°00.142'W
4 54°49.381'N 000°10.720'W
ShellContacts ....
Cannot see a suitable Fugro research ship in that area yet.