RE: Next-ChemX Unlocking Lithium Extraction11 Jul 2023 12:59
Pilot Plant Update:
In respect of the pilot plant:
• Final piping and instrumentation diagram (“P&ID”) engineering for the pilot plant is complete, based on modular 40-foot
containers specifically designed for the chemistry of the ions to be extracted from a brine;
• Custom designed hollow fiber membranes have been produced and a production system has been designed for
immediate erection of the pilot plant; and
• Testing of various lithium brines is planned, subject to applicable laws, during Q2 2023.
Completion of Clontarf’s joint venture with its preferred DLE partner is another important milestone.
Sample analysis should be available during mid Q3 2023.