RE: Decline at 1,800 Metres28 Feb 2023 07:23
Perdantic, of course I know that, Jesus get a life, whether its excavated, built or constructed the question is the same , they would be using some sort of boring technology/ blasting etc to excavate the drive and once that has been achieved and the required distance between passing bays established then what is to stop the contractors creating another passing bay or what ever is needed, all the time advancing the decline with the primary machinery, saving time ,etc !!t