RE: π΅ π΅I can see DOUBLE DIGIT BLUE π΅ π΅22 Jul 2025 09:54
This is what chatgpt says..
The latest RNS update was released on 21 July 2025, confirming that drilling has begun at Redβ―Setter. As of that announcement:
The rig is currently sitting on the first of two RC holes, which are being deepened from ~300β―m to the target of 550β―m.
They have already run casing to near-bottom of the first hole and expect βfurther drilling β¦ in the days aheadβ .
---
β³ How Long Until Completion?
Hereβs a breakdown of the expected drill timeline based on typical drilling rates and current progress:
πΉ Current Status:
First hole at ~300β―m, casing nearly bottomed (~550β―m target).
πΉ Estimated Drilling Rate:
RC drilling (with diamond tails) typically advances 50β100β―m per day in such environments.
πΉ Calculating First Hole Completion:
Remaining ~250β―m β 2.5β5 days to reach 550β―m.
πΉ Planning for Second Hole:
Second hole currently at ~300β―m β needs ~250β―m additional β 2.5β5 days estimated.
Total for both sequentially: 5β10 days from 21 July.
πΉ Realistic Completion Window:
Given today's date 22 July 2025, the drilling should realistically finish by between 26 and 31 July 2025, assuming smooth operations.
---
β
Summary
First hole: expected to hit the 550β―m target by late July (likely 24β27 July).
Second hole: likely completed by end of July, potentially 1 August if there are slight delays.
So, drilling both holes to the 550β―m target should be done within about a week to ten days of 21 July 2025.