RE: Invested18 Jan 2021 13:13
Hi BSB and Boom
In terms of the size of the project, I believe 1m 0zs is entirely achievable, realistic and probably under stated. The area has been mined by artisanal miners previously, but as anyone knows, artisans never get anywhere near the basement nor the lower floors, where the gold generally is. As such, the drill campaign will find lovely grades, most likely open at depth way beyond what the surface miners have taken. The gold belt is rich in solid grades for open pit. And our area covers a significant sq. km of ground. Yes 1m ozs is totally given and will see this SP shift into multi-bag territory when this is confirmed. But, they've got to get there and find it, so there's always a risk. That said, this is a fairly well de-risked share, given they are well funded, have terms agreed for production and all they have to do is drill in the right place in enough holes.....
Holding and Building