So 18-24 months till production, @ 10,000,000 tons ore, with 500,000 contained copper at 5% cu, at some point they must do some drilling, outline a plan for how ore will be treated before trucking it out.
(Noting that doing nothing, even 20x100T trucks per day at 5% copper, is 100 tons of contained copper a day).
Then there are the other licences?
With copper set (according to various forecasts) to average 12k ton in 2024, 15k in 2025, even bushranger will appeal to the bigger fish.
Really feel there must be a way to start generating interest to benefit the sp.