RE: Keep them coming1 Apr 2022 15:26
Petrofac - Two significant milestones for the HKZ offshore grid connection project.
Alpha ready to land offshore wind power and Beta topside installed
Hollandse Kust (zuid) Alpha, our client TenneT's high voltage connection for the Netherlands' offshore wind farms HKZ I and II is ready for use. The installation and energisation of the offshore grid connection has been completed. Wind farm developer Vattenfall can now connect the wind turbines to the high voltage grid. On top of that, the HKZ Beta topside was successfully installed.