RE: Listening to David's video from yesterday again2 Jul 2021 12:42
This is kinda what I was saying yesterday. In the interview DM quickly bypasses the 400m pay zone area details saying volume stronger deeper down. Although the drill will take longer pulling out pipe and wirelog at 400m - this is the maiden well, surely all zones tested as they go down in case of well collapse or the deeper drilling upsets the higher targets etc.
Once the first well was detailed inspected at each stage, the next well could be drilled to TD before reporting anything. The 2% gas show might have been a very small pocket of trapped gas.
I remain optimistic, although the latest interview has raised questions about the Karoo zone.