RE: H1 Results30 Sep 2022 11:14
"Completed well engineering for the PAT-E1 Lower Eocene sidetrack, designed to appraise up to 864 Bcf contingent gas resources'
As the CEO says, we've never been in a better position!
Let's hope the flow testing is progressing well!
Have a great weekend all!