RE: WR-B01 Side-track22 Dec 2022 21:05
"A rod pump was installed on WR-B1a for the clean-up operations. Following the side-track of JKT-01, downhole operations at WR-B1a will resume with a low-cost side-track from the same well bore. It will target significant fractures and faults, newly identified from attribute analysis of the 3D-seismic survey, at a higher level within the Middle Eocene reservoir. The attribute analysis has been recalibrated from the significant amounts of data acquired through drilling WR-B1a.