Expected Arkoma Rates29 Jun 2018 13:58
Any ideas guys what to expect with ESPs?
As per initial RNS(below) 2 wells already producing 20bopd each so one would assume a material uplift expected...
The first deep well in the area, Wise 1-25, was drilled in 2015. Initial flow rates were circa 85 boepd. Production has been constrained as there was no water disposal well, but this well has already produced over 350,000 Boe, and is currently producing circa 20 boepd.
Â
Another well, Wise 3-25, has produced up to 60 boepd from the Wilcox and is currently shut in waiting to test the Woodford shale. Williamson 4-25 production was constrained by the lack of a water disposal well, and is producing 20 boe from three feet of Wilcox sands, with an additional 30 feet of Wilcox pay yet to be perforated and produced. Two other wells have recently been drilled and are expected to be brought into production in May/June 2017. The production equipment and costs associated with installation are included in the Initial Transaction.