Water Injectiom permitted at hh11 Sep 2019 14:14
So no reason why we now can’t produce from the Portland at Brockham
Planning Consent Summary
The planning consent gives permission to produce oil over a period of 25 years at up to 3,500 barrels of oil per day from a total of six wells within the Portland and Kimmeridge oil pools, including the existing Horse Hill-1 ("HH-1") and the forthcoming HH-2/2z horizontal well. Consent also includes permission to drill one water reinjection well to help maximise oil recovery. All existing and future wells will be drilled from within the existing 20 x 15 metre concrete pad. No further drilling sites beyond Horse Hill are required.