Big plans.21 Jun 2019 18:36
HORSE HILL WELL SITE
HYDROCARBON PRODUCTION, DECOMMISSIONING
AND RESTORATION
PLANNING STATEMENT AND ENVIRONMENTAL REPORT
PROPOSAL:
RETENTION OF AN EXISTING WELL SITE AND VEHICULAR ACCESS ONTO HORSE HILL TO ACCOMMODATE THE DRILLING OF FOUR NEW HYDROCARBON WELLS (ADDING TO THE TWO EXISTING WELLS ON-SITE), ONE PRODUCED WATER REINJECTION WELL AND THE SUBSEQUENT INSTALLATION OF SIX SURFACE MOUNTED PUMPS (ONE PUMP PER OIL PRODUCING WELL); THE CONSTRUCTION OF A PROCESS AND STORAGE AREA AND TANKER LOADING FACILITY ON LAND TO THE EAST OF THE EXISTING WELL SITE TO ACCOMMODATE 7 OIL STORAGE TANKS (CAPACITY OF 1,300 BARRELS PER TANK), 2 FIRE WATER TANKS, 2 PRODUCED WATER TANKS, AN ENCLOSED GROUND FLARE, AN OIL HEATER WITH AN EXHAUST STACK, 4 GAS-TO-POWER ELECTRICITY GENERATORS, OIL SEPARATORS, ABOVE GROUND PIPE AND CABLE TRACKS, WATER MONITORING BOREHOLES AND ANCILLARY DEVELOPMENT ENABLING THE PRODUCTION OF HYDROCARBONS FROM SIX WELLS FOR A PERIOD OF TWENTY YEARS INCLUSIVE OF WELL MAINTENANCE WORKOVERS AND SIDETRACK DRILLING FOLLOWED BY DECOMMISSIONING AND SITE RESTORATION.
LOCATION:
HORSE HILL WELL SITE, HORSE HILL, HOOKWOOD, HORLEY, SURREY, RH6 0RB
DOC REF:
HHDL-HH-PSER-V1
DATE:
30TH NOVEMBER 2018