News very close 👍8 Apr 2026 16:43
Perenco Signs 20-Year Contract for Continued Operations ...Cameroon is currently in a major bid round for nine oil and gas blocks across the Rio del Rey and Douala/Kribi-Campo basins, closing March 30, 2026, targeting increased production. Key developments include the joint development of the Yoyo-Yolanda gas field with Equatorial Guinea and the expected 2026 launch of the Kribi refinery.
Africa Oil+Gas Report
Upstream and Licensing
2026 Licensing Round: Société Nationale des Hydrocarbures (SNH) is offering nine blocks located near existing production, with results expected on April 24, 2026.
Block Locations: Included blocks are in the Rio del Rey (Ndian River, Bolongo, Bakassi) and Douala/Kribi-Campo (Etinde, Bomono, Nkombe-Nsepe, Tilapia, Ntem, Elombo) basins.