RE: Managing Director's Address to AGM Empire31 May 2023 09:34
Is anyone else confused by the Empire results?
On 24th May Empire stated that:
Carpentaria-2H (“C-2H”) has produced a total of 323 Terajoules (“TJ”) (281 mmscf) over 127 days
• This equates to a normalized rate of 2.75 TJ (2.4 mmscf) per day per 1,000 metres for the entire test period
• The post-soak 2023 IP30 is now confirmed at 3.5 TJ (3.0 mmscf) per day per 1,000 metres following updated gas composition analysis
Yet their most recent release states that:
• Carpentaria-2H (“C-2H”) produced a total of 323 TJ (281 mmscf) over 127 days
• This equates to a normalised rate of 8.25 TJ (7.2 mmscf) per day for an equivalent 3,000m horizontal development well for the entire test period
• The post-soak 2023 IP30 is confirmed at 10.5 TJ (9.2 mmscf) per day for an equivalent 3,000 metre horizontal development well
So essentially they are extrapolating their results from their 1000m C-2 drill to a hypothetical 3000m horizontal drill by multiplying the C2 results by roughly three. Is that legit? Seems a bit dodgy to me...
Thanks