For rainwhenidie4 Mar 2024 12:10
100% back of the cig packet based on 40km by 7km and up to 6km deep keel and every hole of the first 64 hole drills have ending in 5% or grater Titanium mineralisation. That makes the ore body 100's of billions in size. Just depends what metalurgy returns on what they can produce as a sellable titanium product.
**********
In reply to your post to me this morning:
Andii darling, I know resource definition drilling aka truth machine work may be an alien concept to you, but generally to put some rough economics on a project you need to drill it out, find the edges /depth of the system, understand the shape of the ore body, the controls on mineralization, grade distribution, continuity of grade etc etc. Then you get independent experts to do all the block modelling etc to give your resource estimate. Now I know you can magically do all this in your head without the need for drill rigs, but it's just fantasy mate, imho!