Balcombe Forward Plan9 Dec 2018 07:19
I'm interested to see the forward plan for the Balcombe well as the 2 month shut in period should have ended circa 2nd December.
Changing out the production tubing to a larger diameter sized tubing would prevent the slugging observed during the well test when rates of 3,000bopd were achieved over a 1,600ft horizontal section of the Upper Kimmeridge Limestone (KL4).