RE: When 6/7p????24 Apr 2025 08:26
Adw is quoting figures from a link I put up several months ago, see link below. However as usual he is twisting the facts, firstly the link covers the period 1995 (when PSC awarded to SOCO) thru to 2021 only, PC bought SOCO out in 2005, between 1995 and 2005 SOCO drilled (without 3D seismic) around 20 wells, in 2005 when SOCO sold out to PC they had only one producing well which was producing around 350 bopd.
From the figures stated in this link it is not possible to make anything but an educated guess of PCs success to-date as we do not have detailed figures, only totals for wells drilled between 1995 and 2021, we do not have figures for the last 4 or 5 years.
TAMSAG Basin is shared between PC and MATAD (Heron field), each have just over 200 sq/km.
Mongolia daily oil production graph half way down the page at the link below.
https://mongoliainc.com/key-commodities/oil/