W2T has not submitted planning application
W2T has not found 7m to build the 1st plant
time for construction, then
25tpd DMG needs 8000 hours of problem-free proven
all these look like it is 2 years away from now
however, it is good that BBC World has discovered PHE (not sure how and why BBC World interested and have invited PHE, but it is a good sign / good start). it is a very goodchance to present PHE via BBC World,andagreewedoneed the 1st plant
DR didn’t sell PHE well, he is engineer (and think fast) and has gone too deep into detail (public and not everyone can think like engineer) …
i watch it from a 3rd party point of view, watch it not as an existing PHE investor, just like someone discover this video today - i hardly notice what is PHE doing. i do hold a lot, and i mean inthesizeof a house, of shares inPHE, and do hope PHE grow.
in all future public event, DY needs a salesman to packaging the DMG.
deep technical knowledge not needed in such short available window, and need someone can talk better, straight to the point to sell DMG.
hire a good salesman, hire someone can talk well.
PHE has good product, and now need a good salesman.
Hi Yellow,
I think inthe longer term, it is aim to sell hydrogen and generate higher profit.
For now i see w2t is try to build a snow case site., to prove dmg works via electricity generation. In the site layout, there is a little area at north east corner demarked with fence and noted future hydrogen development (something like that, cant remember the exact content).
To me the key is to the 12 months (8000hours ) operation to prove 25tpd dmg that scale up from 5tpd is working with no bugs. However, not everyone on this bb willing to accept or face any reality.
Lots to do, on the surface:
-Planning application,
-Find investors to invest w2t to build FOK waste to hydrogen plant, is this 7million?
-Find a right epc contractor to build the 1st site,
-PHE to manufacture or build 25tpd unit,
-Commissioning,
-only after 8000 problem free operationhours will attract many customers, as i said in my previous posts, 2 years from now. 2021 summer.
Last minute or not, is another story. at the moment, PHE has not got an IP, so “The research and technology development IP is protected within the chemical engineering models and control systems of the process ….” is kind of misleading.
Doesn’t look like PHE has a IP at the moment.
https://www.gov.uk/patent-your-invention/decide-to-apply
Applying for a patent
If you work with a patent attorney or advisor, they’ll help you through the application process. Applications typically cost £4,000 and the process usually takes 5 years. There are 8 steps if you apply for patent protection in the UK through the Intellectual Property Office (IPO).
1, Search for similar patents to make sure your invention is new.
2, Prepare your patent application.
3, File your patent application and request a search from IPO.
4, Receive your search report (usually within 6 months) and decide whether you want to continue with your application.
5, Your application will be published 18 months after you file it.
6, Ask for a ‘substantive examination’ within 6 months of publication.
7, Respond to comments from IPO’s ‘substantive examination’. The examination may take place several years after you file your application.
8, Your application will be granted or refused.
You can commercially benefit from your patent once its been granted, for example license, sell or mortgage your patent.
Don’t make your invention public before you apply. You may not be able to patent it if you do.
"it can do paid trials " where is this information come from, i think this is incorrect, and it is an imagination. If i remember correctly, recent announcement say something like it is connected to micro grid and supply electricity to (uni. of chester or the science park, cant remember which one). I also dont remember if it say if the electricity supply will collect money.
Started to like this, and see morelife ot it.
I see there are alot of works in progress behind the scene
Seen things / layout that im familiar with.
Existing main road
Main&secondary entrance/gate, emergency exit
Security control building, storage, maintenance
Hydrogen generation area, with separate gate
Gasification process area
Utility area
Air cooler
Gas cleanup system
Power generation area
Tx bay
Incoming elec supply
There is even a bike store.
Hi Stoky,
2 years.
Time for w2t raise 7m
Time for w2t place order to phe for a 25tpd dmg
Time for phe build 25tpd dmg
Time for epc contractor carry our the design
Time for construction
Time for commission
Then, time for 8000 hours (333days of 24/7 with no maintenance, or 1 year with maintenance inc.) of problem free dmg operation
I think the market (institution, all the efw plant owner/investor, all those plant/factory consume high electricity, anyone want to buy the dmg) are currently waiting see the first dgm with 8000 hours of unbreakdown problem free operation. It is not long for them, it is only just 1.5 to 2 years of waiting time to justify. But for some of us, 2 years is a long wait.