Roundtable Discussion; The Future of Mineral Sands. Watch the video here.
Cant remember exactly where from, may be from video of uk sharetalk or previous rns.
If we can get planning permission in/before the summer then looking into end of the year for operation.
I think end of the year for commission is realistic, but not operation. My own expectation is that it will be in operation in Q1 2020.
POWERHOUSE ENERGY GROUP PLC - First Revenue Contract for PowerHouse Energy
PR Newswire
London, April 16
PowerHouse Energy Group plc
("PowerHouse Energy" or the "Company")
17 April 2019
First Revenue Contract for PowerHouse Energy
PowerHouse Energy Group plc (AIM: PHE), the UK technology company pioneering hydrogen and clean energy production from waste plastic, is pleased to announce that it has signed a binding contract with its exclusive partner, Waste2Tricity Limited (“W2T�), for PHE to provide planning and engineering design services that will, subject to successful outcome, lead to a build contract and license for use of the DMG® Technology at the Protos site. The agreement defines the paid scope of works during two stages of planning and engineering. At signature, based on quotations from potential Contractors PHE provisionally anticipates that total revenue from the two stages of the contract will amount to approximately £400,000 to cover PHE and Contractors costs.
The engineering design services to be provided by PHE for stage one includes specific feedstock analysis and testing including some third party services, site modelling and specific engineering related to the Protos site. This work will define the parameters for the second stage of the project, the Front End Engineering Design (FEED) contract which it is anticipated will be placed with an Engineering, Procurement & Construction (EPC) contractor, following an agreed review.
The agreement also incorporates Heads of Terms in relation to PHE acting as operational process engineering supplier for the DMG® Technology at the Protos site, encompassing design rights, build contracts and licensing proposition of its technology.
This contract comprises another step towards achieving Financial Close for the first commercial site utilising PHE’s DMG Technology.
David Ryan, CEO of PowerHouse
Post it again
https://www.ukinvestorshow.com/videos/powerhouse-energy-group-plc/
I am with Stokey. Ithink what he meant was the investment by institution, and that will make sp more sustainable. Consider the PI like us, howlong would you hold this share, how many would hold it for years after it is in profit?
PowerHouse Energy Group plc
("PowerHouse Energy" or the "Company")
10 April 2019
Development Partner agrees Lease for Hydrogen Development Site
PowerHouse Energy Group plc (AIM: PHE), the UK technology company pioneering hydrogen and clean energy production from waste plastic, is pleased to announce that its development partner, Waste2Tricity Limited (“W2T�), has concluded negotiations and signed an agreement with Peel Environmental for an 124 year lease of a plot on the 54-acre Protos energy hub site, an important milestone in its plan to build a waste plastic to hydrogen and power facility.
"In talk" is different to that Toyota announcement, which has nothing to do with PHE or W2T (which i hope it will be a success).
There will be no announcement on any failed talk. So "in talk" could be ended already.