The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.
Did we know this already will it help us? does this mean we would only require a 150km road?
https://nedradv.ru/nedradv/ru/find_place/?obj=f2f5e2370b07304ef3b5b8e491479d76
"The field is associated with the village of Bomnak with an winter winery. 25 km south-west of the village of Bomnak passes the line of the Baikal-Amur Railway with the village of Verkhnezeisk and Ulak. Currently, a railway is being constructed from the Ulak railway station to the Elginsky coal deposit, which will pass 120-150 km west of the license area."
However (amazing or not) the drill results are for 2018 will they really make any long term difference to the price?
It's fair to say the only thing that is really going to give us a supported share price increase is some finacial support from someone interested in moving the project closer to production.
The chances of this happening have increased by the current/forecasted NI outlook.
Same with regards to the NDA discussion.
I want it to go boom as much as anyone else.
Very interesting. IG's TEO was completed back in 2014. Prepared by Oreoll
"The description of the Malmyzh Project is based upon information provided in reports from IGC,including the TEO report of temporary conditions prepared by OREOLL LLC (2014), as well as personalcommunications with IGC's Thomas E. Bowens, CPG (President and CEO) and Evgeney Ignatiev (DeputyGeneral Director, Geologic Compliance and Permitting)"
Gipronickel Institute LLC announces the Procurement procedure “Conducting semi-industrial tests of enrichment of copper - nickel ores of the Kun - Manye deposit in a continuous mode and in a closed cycle to confirm technological parameters obtained from laboratory samples"
http://www.nickel.spb.ru/tenders.html
The deadline for submitting proposals is from September 16, 2019 to September 20, 2019
https://europe.autonews.com/automakers/audi-may-buy-ev-batteries-byd-amid-supply-constraints
I don't believe you have ever written anything of any value to me personally or are likely to in the future so having read your posts for too long you're going on the filter list. Good luck with your education drive.
If that is the case. Does it ease your pain relentlessly being negative about the company's prospects?
I appreciate it is rather frustrating but don't see how it helps continuously pointing out how bad things are or how long things are going to take. It's fair to say people invested are only too aware of the current situation and potential timelines.
Enjoy your weekend. Thanks.
Before you go on filter would you be kind enough to answer me one question?
I'm guessing you are not invested in Amur? If this is the case why do spend so much time posting on this board?
Many thanks if you take the time to respond.
As for the Amur Minerals project for the development of Kun-Manyier in the Amur Region, its reserves (up to 1.2 million tons of nickel, about 300 thousand tons of copper) make it possible to make serious bets on this deposit. The main components of its ores are nickel and copper. There are also reserves of platinum, palladium, cobalt, gold, silver. The difficulty is that, in general, the content of the components is not very high, and the object itself is located in the extreme north-east of the region, where there is no infrastructure. The scale of the mining project and its structure at this stage are not yet clear. According to the Ministry of Natural Resources of the Amur Region, at present “reserves are being calculated and the project’s technical and economic model is being formed.” It is planned to build concentrate production at the deposit, and at BAM - manufacture of nickel matte production or sell only concentrate.
https://dvkapital.ru/regionnow/dfo_18.07.2019_14912_kurs-na-diversifikatsiju.html?printr
Maybe not the whole way but i'm sure it'd be more cost effective than bridges.
https://mqworld.com/2016/07/04/semperit-group-innovative-aerial-conveyor-system-flyingbelt-sempertrans-agudio-put-operation-brazil/#acceptCookieWarning