RE: Actually a good rns16 Mar 2026 08:01
1. Assumptions for Strike Zone Scaling
Parameter Value / Assumption
Strike length 4,000 m
Average width 20 m (typical for narrow to moderate vein/porphyry targets)
Average depth/thickness 150 m (mineralized zone thickness from drill intercepts)
Density 2.7 t/m³
Weighted grades Au 0.77 g/t, Cu 0.19%
In-situ value per 1,000 t ore USD 140,000
2. Ore Volume Estimation
Volume (m³):
4
,
000
𝑚
×
20
𝑚
×
150
𝑚
=
12
,
000
,
000
𝑚
3
4,000m×20m×150m=12,000,000m
3
Ore tonnage:
12,000,000 m³ × 2.7 t/m³ ≈ 32,400,000 t
3. Total In-Situ Value
In-situ value per 1,000 t: USD 140,000
Ore tonnes: 32,400,000 t
Total in-situ value:
32
,
400
×
140
,
000
USD (divide t by 1,000 for scaling)
≈
4
,
536
,
000
,
000
USD
32,400×140,000 USD (divide t by 1,000 for scaling)≈4,536,000,000 USD
✅ Approximate total in-situ value: USD 4.54 billion