RE: WRES21 Oct 2021 11:58
this simply states :
Down 40 tonnes of tungsten concentrate
due to:
"A number of power outages were caused by technical problems with the LNG generators. This has been resolved by the supplier after isolating the cause of the stoppages," it says.
NOW RESOLVED
come on guys
W Resources PLC, down 8.0% at 7.18p, 12-month range 6.07p-23.9p. The tungsten, tin and gold mining company says third quarter saw best performance to date at La Parrilla mine in Spain, with tungsten production up 58% quarter-on-quarter to 168.3 tonnes, but says production was hit by "number of challenges" which resulted in an estimated production loss of around 40 tonnes of tungsten concentrate. "A number of power outages were caused by technical problems with the LNG generators. This has been resolved by the supplier after isolating the cause of the stoppages," it says.