(Updates expected arrival date of Vladimir Vize to July 20 from July 12)
July 12 (Reuters) - The following liquefied natural gas (LNG) tankers are expected to arrive in Britain, Belgium and the Netherlands in the coming weeks.
Estimated arrival dates, often revised by port authorities and AIS Live ship-tracking data on Refinitiv Eikon, are updated below.
Some tankers heading for Belgium and Britain may be loading at the terminal. Those expected to load are indicated with an (L).
Those likely to perform ship-to-ship transfers are indicated with (STS). Tankers that have docked are indicated with (A).
For the Reuters LNG guide, click here:
LNG TANKER CAPACITY in EXPECTED ARRIVAL FROM PORT cubic metres BRITAIN Al Dafna 262,000 July 15 Qatar Milford Haven Al Gattara 212,000 July 20 Qatar Milford Haven
Murwab 210,000 July 11 (A) Qatar Zeebrugge Wilpride 156,000 July 13 (L) N/A Zeebrugge Gaslog Skagen 155,000 July 16 Qatar Zeebrugge Al Karaana 206,000 July 24 Qatar Zeebrugge
Nikolay Zubkov 172,700 July 10 Russia Gate Lena River 153,000 July 16 Russia Gate LVladimir Vize 172,000 July 20 Russia Gate
Sources: Ports, AIS Live ship tracking, Refinitiv Eikon data.
(*) Arrival date calculated using www.searates.com at an average speed of 13.5 knots (Reporting By Susanna Twidale)