The latest Investing Matters Podcast episode featuring financial educator and author Jared Dillian has been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSound Energy Share News (SOU)

Share Price Information for Sound Energy (SOU)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.80
Bid: 0.752
Ask: 0.848
Change: 0.00 (0.00%)
Spread: 0.096 (12.766%)
Open: 0.80
High: 0.00
Low: 0.00
Prev. Close: 0.80
SOU Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Sound Energy pleased with development progress at Tendrara

Mon, 28th Jan 2019 10:24

(Sharecast News) - Morocco-focussed upstream gas company Sound Energy updated the market on its operations in Eastern Morocco on Monday, having previously announced a discovery and the initiation of planning for testing including possible stimulation at TE-10 - the second well in its current three-well exploration programme in the Tendrara area, onshore Morocco.The AIM-traded firm had previously reported that preliminary TE-10 wireline logging results identified a potential TAGI gross reservoir sequence from 1,899m measured depth (MD) to 2,009m MD, an initial net pay estimate of up to 10.5m, and gas bearing sands beneath the mapped TAGI structural closure.Gas was also successfully recovered to surface with a modular formation dynamics tester system, confirming the presence of moveable hydrocarbons in the reservoir.The board said the rig at TE-10 had now been demobilised, and was stacked at the TE-10 rig site on a reduced standby rate, awaiting drilling of the next - and final - well in the company's current exploration programme, TE-11.The company announced on 7 January that the high definition formation micro-imager log (FMI), which provided a microresistivity image of the wellbore at a much finer resolution than the initial logging suite, had potentially identified the presence of additional thin bedded net pay within the previously-identified potential gross reservoir interval between 1,899m MD to 2,009m MD.Sound Energy confirmed on Monday that the FMI identified both the presence of fractures, and the previously-announced potential additional thin bedded net pay."A total of 57 sidewall core samples have been successfully cut and shipped out of Morocco and are now being analysed by ALS in the UK," the board reported."Preliminary analyses of a sample subset show permeabilities within the range observed in the TE-5 Horst area."Sound Energy said its initial, and previously announced, net pay estimates of up to 10.5m were now being revised "likely upwards", integrating the wireline data with the ongoing analyses of the sidewall core.The company said it expected to be able to confirm a revised net pay estimate in mid-February.Sound Energy said the North East Lakbir stratigraphic trap, the most material of TE-10's two targets, had pre-drill mid case potential on a gross - 100% - basis of 2.7 Tcf gas originally in place (GOIP).Following the acquisition of the vertical seismic profile (VSP) at TE-10, the firm previously confirmed that the gas shows observed during drilling extended below the currently-mapped structural closure at approximately 1,958m MD, suggesting that the gas accumulation could extend updip into the stratigraphic trap"Seismic interpretation and modelling to provide an estimate of the gas resources within the discovery at this specific well and to de-risk the stratigraphic upside continue and are expected to be completed also by mid-February," the board said.Design, planning and procurement for the TE-10 testing programme was nearing completion, the company added.It confirmed that the testing programme would include stimulation of the well, and that the testing and stimulation equipment was already being mobilised to site by Schlumberger from Libya and Tunisia."The first stage of the TE-10 testing programme, which will commence early February, will conduct a series of flow tests on multiple intervals between 1,899m MD and 2,070m MD to establish the presence of deepest moveable gas, and reduce the range of uncertainty on gas resource volumes."The company then intends, once the stimulation equipment has arrived, to mechanically stimulate the most prospective reservoir zones in a series of production flow tests."Sound Energy said the stimulated test was expected to take at least 30 days from commencement.Based on its current assessment of the reservoir section, a stimulated flow rate of approximately 1.5 mmscf/d to 2mmscf/d, was likely to be commercial - as a tie-back development to the TE-5 Horst existing discovery."This commerciality threshold would be materially lower if the stratigraphic upside materialises as the TE-10 development would, in that case, be a standalone development."At TE-11, the board said it was "delighted" to confirm that it had now selected the location for TE-11, subject to partner approvals.The firm said it was targeting a Palaeozoic high in the northern area of the Greater Tendrara licence.Ground works for the drilling of TE-11 - the third well in the exploration programme - were expected to commence after the TE-10 well test."The company also continues to make good progress with the development of the existing discovery - TE-5 Horst - which is being prepared for a 66 mmscf/d development project requiring production wells, a central processing facility (CPF), and a 120km gas export pipeline (TGEP)."Sound Energy said the consortium comprising Enagas, Elecnor and Fomento continued to make "good progress" in preparing for the build-own-operate-transfer (BOOT) contract for TE-5, which would see the consortium executing front-end engineering and design (FEED) for the TGEP and CPF at their cost, securing the required $186m capital investment and executing the project, in exchange for an annual tariff payable calculated by reference to a target internal rate of return for the consortium, and to a 'not-to-exceed' fee of $45m per annum.Sound noted that the FEED for the TGEP had now been completed by the consortium, and that FEED for the CPF was expected to be completed by the end of April.
More News
7 Dec 2018 10:00

Sound Energy Starts Drilling On Second Eastern Morocco Well

LONDON (Alliance News) - Sound Energy PLC on Friday reported the commencement of drilling at TE-10 exploration well, the second well of a planned three-well campaign in Eastern Morocco.The

Read more
5 Nov 2018 08:59

Sound Energy Drills TE-9 In Morocco To Second Casing Point

LONDON (Alliance News) - Gas producer Sound Energy PLC said Monday that it has drilled TE-9, the first well in its current three well programme, to the second casing point in eastern well has been

Read more
26 Oct 2018 09:27

Sound Energy drills exploration well to first casing point

(Sharecast News) - Morocco-focussed upstream gas company Sound Energy confirmed on Friday that the first well in its current three exploration well programme, TE-9, had been drilled to the first casing point at a measured depth of 352 metres.

Read more
26 Oct 2018 08:25

Sound Energy Drills Eastern Morocco Well TE-9 To First Casing Point

LONDON (Alliance News) - Sound Energy PLC on Friday said the TE-9 well, located in eastern Morocco, has been drilled to the first casing point.The Moroccan-focused upstream gas company said

Read more
17 Oct 2018 09:18

Sound Energy To Start Drilling At TE-9 In Eastern Morocco

LONDON (Alliance News) - Sound Energy PLC said Wednesday it will shortly start drilling at the TE-9 well in eastern Morocco.Shares in the Moroccan-focused upstream gas company were trading

Read more
16 Oct 2018 09:48

Sound Energy Gains Ministerial Approval For Petroleum Agreement

LONDON (Alliance News) - Morocco-focused gas firm Sound Energy PLC said on Tuesday it has gained ministerial approval for its eight-year Greater Tendara Petroleum Agreement.At the end of an

Read more
16 Oct 2018 09:35

Sound Energy receives ministerial approval for Morocco agreement

(Sharecast News) - AIM-listed upstream gas firm Sound Energy has received ministerial approval of its new eight-year Greater Tendrara Petroleum Agreement.

Read more
11 Oct 2018 12:31

Sound Energy Knows Of No Reason For Drop In Share Price

LONDON (Alliance News) - Sound Energy PLC said it is not aware of any reason behind a movement in the company's shares on Thursday.On Thursday afternoon, the company's shares were a

Read more
13 Sep 2018 10:01

Sound Energy Loss Widens, First Eastern Morocco Basin Well Imminent

LONDON (Alliance News) - Sound Energy PLC on Thursday said its pretax loss widened in the first half of the year due, in particular, to external interest costs.In the six months ended June

Read more
13 Sep 2018 08:10

Sound Energy prepares for 'potentially transformational' drilling works

(Sharecast News) - Sound Energy assured shareholders it was ready for a new and "potentially transformational" phase of drilling across its Moroccan assets.

Read more
6 Sep 2018 14:31

Sound Energy awarded production concession at Tendrara

(Sharecast News) - Morocco-focussed upstream gas company Sound Energy announced the award of the production concession relating to the Tendrara gas discovery in Eastern Morocco by the Moroccan Ministry of Energy on Thursday.

Read more
6 Sep 2018 11:35

Sound Energy Awarded Production Concession For Tendrara Gas Discovery

LONDON (Alliance News) - Upstream gas company Sound Energy PLC said on Thursday it has been awarded a production concession for the Tendrara gas discovery in Morocco by the Ministry of production

Read more
31 Aug 2018 11:05

Sound Energy signs new eight-year petroleum agreement

(Sharecast News) - Morocco-focussed upstream gas company Sound Energy announced the signing of a new eight-year petroleum agreement uniting the areas previously covered by the Tendrara petroleum agreement and the Matarka reconnaissance licence on Friday.

Read more
31 Aug 2018 09:36

Sound Energy Secures New Petroleum Agreement In Eastern Morocco

LONDON (Alliance News) - Sound Energy PLC said Friday it has signed a new eight-year petroleum agreement for the Tendrara and Matarka areas in Morocco.The new agreement covers 14,500 square

Read more
21 Aug 2018 12:36

Sound Energy completes 2D seismic acquisition programme

(Sharecast News) - Morocco-focussed upstream gas company Sound Energy announced the completion of the entire 2,850 line Kilometre 2D seismic acquisition programme in Eastern Morocco.

Read more

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.