The latest Investing Matters Podcast episode featuring financial educator and author Jared Dillian has been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRXP.L Share News (RXP)

  • There is currently no data for RXP

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Roxi Petroleum Makes Further Progress At BNG Contract Area, Kazakhstan

Wed, 19th Oct 2016 09:03

LONDON (Alliance News) - Roxi Petroleum PLC on Wednesday said initial testing at Shallow Well 141 has indicated the MJF structure extends over a considerable area, while preparatory work has begun at its Shallow Well 142.

The Central Asian oil and gas company holds a 58.41% stake in the BNG contract area, which is located in the west of Kazakhstan and which covers 1,702 square kilometres. Within the BNG block, Roxi Petroleum has focused on two shallow regions, the Yelemes and the MJF structure.

Roxi Petroleum said on Wednesday drilling commenced at the Well 141, within the MJF structure, in August 2016, initially targeting Jurassic Callovian sands at a depth of 2,200 metres.

The well was drilled to a total depth of 2,500 metres on a turnkey basis at a total cost of USD1.3 million.

During the drilling at Well 141, five oil-bearing intervals were identified for testing. At the first of the intervals, the well was perforated over six metres at between 2,230 and 2,236 metres. Early flow test results indicate the well to be producing at the rate of 220 barrels of oil per day using a 3 millimetre choke, and 480 barrels of oil per day using a 5 millimetre choke.

Further testing at this site is planned including an extended production test.

Drilling at a second well within the structure, Well 142, is expected to commence in the next few weeks and be completed "well before the year-end". This well is also to be drilled on a turn-key basis for USD1.3 million to a total depth of 2,500 metres.

Elsewhere at the BNG block, within the Ayrshagyl portion, Roxi Petroleum said its Deep Well A6 was spudded last November, and based on the analysis of mud logs it decided to complete the well at a depth of 4,528 metres.

Although mud-logs are "only preliminary", Roxi Petroleum said they suggest the well has penetrated oil bearing intervals. Roxi Petroleum said it will make a further announcement on this after completing and analysing a wire-line log subject to which it expects to conduct flow testing.

"We believe the successes at Well 141 indicates the MJF structure extends over a considerable area. At A6 we have managed the very challenging drilling of the well better than with Deep Wells A5 and 801 and accordingly will better placed to move to flow testing in due course," said Executive Chairman Clive Carver.

Shares in Roxi Petroleum were up 27% at 11.29 pence on Wednesday.

By Hannah Boland; hannahboland@alliancenews.com; @Hannaheboland

Copyright 2016 Alliance News Limited. All Rights Reserved.

More News
12 Jan 2017 16:23

Director dealings: There was a wise lady called Limerick

(ShareCast News) - The wife of Roxi Petroleum director Edmund Limerick splashed out and gained from an uptick. Limerick's wife spent £50,350-worth at a price of 9.5p per share to take her and her husband's holding to 2.235m. Mrs Limerick made the purchase on Wednesday, the day after the oil and gas

Read more
5 Jul 2016 14:52

Director dealings: Limerick doubles stake in Roxi Petroleum

(ShareCast News) - Roxi Petroleum director Edmund Limerick has doubled his stake in the Central Asian oil and gas company as it battles to advance several wells towards production. Limerick, a former investment banker, diplomat and Central Asia specialist, bought 550,000 ordinary shares at a pri

Read more
5 Jul 2016 09:27

DIRECTOR DEALINGS: Roxi Petroleum Non-Executive Buys Shares

Read more
29 Jun 2016 10:28

Roxi Petroleum Focus Remains On Developing Its Kazakhstan Deep Wells

Read more
22 Jun 2016 15:05

UK Shareholder Meetings Calendar - Next 7 Days

Read more
14 Jun 2016 10:52

DIRECTOR DEALINGS: Roxi Petroleum Non-Executive Ups Interest

Read more
3 Jun 2016 07:10

Roxi Operations Struggle To Make Profit But Production Set To Rise

Read more
11 Apr 2016 10:26

Roxi Petroleum Takes Steps To Counter Blockages At Two BNG Deep Wells

Read more
29 Feb 2016 16:32

Roxi Petroleum's Deep Well A6 Reaches Depth Of 3,700 Metres

Read more
27 Jan 2016 08:42

Roxi Petroleum To Revisit BNG Estimates Following Further Drilling

Read more
21 Jan 2016 10:30

Roxi Petroleum Gets Extension To BNG Contract Area In Kazakhstan

Read more
13 Jan 2016 10:54

Roxi Petroleum Reports Good Flows From BNG Shallow Well

Read more
3 Dec 2015 08:41

Roxi Petroleum Struggling To Complete Flow Tests Due To Blockages

Read more
9 Nov 2015 10:06

Roxi Petroleum Spuds New Well At BNG Project In Kazakhstan

Read more

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.