The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRXP.L Share News (RXP)

  • There is currently no data for RXP

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Roxi Petroleum Focus Remains On Developing Its Kazakhstan Deep Wells

Wed, 29th Jun 2016 10:28

LONDON (Alliance News) - Roxi Petroleum PLC on Wednesday said its focus remains on developing its existing deep wells at the BNG Contract Area in Kazakhstan to allow flow testing to commence, as work continues at a number of the sites.

The producing oil and gas company said its Deep Well A5 the pressure encountered outside the production tubing has been consistently of the order of 300 bar, and Roxi said it flows the well periodically when the pressure in the oil production tubing has exceeded 320 bar.

Over time, as the obstructions in the well have been removed, the time required for the pressure inside the tubing to revert to 320 bar has reduced from several days to a few hours, Roxi said, noting that it should not now be long before the well is able to flow continually with the pressure in the oil production tubing staying above the 250 bar level. Once the level drops below 250 bar, flowing is stopped to protect the well.

As a suitable rig has become available, work has commenced to attempt to side-track the well from a depth of 4,013 to 4,450 meters to gain access to structures at these depths, Roxi said, and, as such, work to allow the well to flow uninterrupted has been suspended and will resume once the side-track has been completed.

Meanwhile at the Deep Well 801, core samples and logging reveal a potentially oil bearing interval starting from 4,536 meters and extending 100 meters. The well has flowed periodically and Roxi said it is the company's expectation that following a programme of chemical washes the well will begin to flow on a more consistent basis.

Drilling at Deep Well 6 has reached a depth of 4,000 metres, but has been paused to allow additional 7-inch casing to be set, and then drilling will resume to a depth of 4,450 metres, with a further casing to be applied, and then down to 5,000 metres, Roxi said.

Roxi also holds interest in a number of shallow wells at the site, which it also gave an update on.

Aggregate production from the shallow wells is currently 628 barrels of oil per day, which is a net of 367 to Roxi. The company noted that at the Munaily site a workover rig is in the process of being assembled, and it expects work on the first well re-entry to commence in July. The wells were drilled during the Soviet period but were closed.

Roxi holds a 58.41% stake in Munaily, where currently 145 barrels of oil per day, with a net of 85 to Roxi, are being produced.

Roxi also has a 50% stake in Beibars Munai LLP, which operates the 167 square kilometer Beibars Contract Area on the Caspian shoreline south of the city of Aktau. No operations have been carried out at the site, since the site was put under force majeure in 2008. Roxi said it understands a court heading has been convened for September to consider the ending of the force majeure.

"Our focus continues to be in developing our existing deep wells to allow flow testing to commence," said Chairman Clive Carver.

Shares in Roxi were down 5.5% at 8.63 pence on Wednesday.

By Hannah Boland; hannahboland@alliancenews.com; @Hannaheboland

Copyright 2016 Alliance News Limited. All Rights Reserved.

More News
19 Jun 2015 08:15

Roxi Petroleum receives first payment following sell of Galaz asset

Oil and gas explorer Roxi Petroleum has received the first payment from the sale of its stake in the Galaz asset in Kazakhstan. In a statement released on Friday, the London-listed company said it had received the first $10.4m of the $23m it is owned following the sale of its 34.23% stake in the pro

Read more
12 Jun 2015 11:10

Roxi Petroleum gets $6.9m loan repayment

Roxi Petroleum said on Friday that it had received the $6.9m repayment of a loan that was part of the process of selling its equity and debt interest in the Galaz Contract Area to Xinjiang Zhundong Petroleum Technology. A payment of $27 million to Roxi's subsidiary Galaz Energy BV remains outstandin

Read more
12 Jun 2015 10:15

Roxi Petroleum Gets USD6.9 Million Loan Repayment

Read more
1 Jun 2015 11:00

LONDON MIDDAY BRIEFING: Lloyds Buoyed By Latest Share Sale News

Read more
1 Jun 2015 10:25

WINNERS & LOSERS: Playtech Falls After Plus500 Acquisition Agreement

Read more
1 Jun 2015 10:22

Roxi Petroleum jumps on BNG asset update and Galaz sale

Shares in Roxi Petroleum jumped 20% early on Monday, as the oil and gas explorer provided operations update at its flagship BNG asset. The Kazakhstan-focused group said that the blockage at the A5 discovery well on the project had been removed and the 30-day flow test was expected to begin in the mi

Read more
1 Jun 2015 08:44

Roxi Extends Galaz Sale Deadline, Cancels BOCO Deal, Clears Blockage (ALLISS)

Read more
20 May 2015 12:45

Roxi Petroleum To Get More From Galaz Sale Than Anticipated

Read more
1 May 2015 08:35

Roxi Petroleum Makes Progress Unblocking BNG Project Well

Read more
30 Apr 2015 07:30

Roxi Petroleum Agrees To Extend Deadline For Sale Of Galaz Interest

Read more
17 Apr 2015 08:56

Roxi Petroleum enters $20m agreement with BOCO

Oil and gas explorer Roxi Petroleum has entered a subscription agreement with Hong Kong-based BOCO limited to raise $20m at above the current market price. The London-listed group said the proceeds would be used to speed up the development of its flagship BNG asset. Under terms of the agreement, BO

Read more
17 Apr 2015 07:25

LONDON MORNING BRIEFING: Ryanair Still Must Cut Aer Lingus Stake

Read more
17 Apr 2015 06:27

Roxi Petroleum To Raise USD20 Million At 16% Premium (ALLISS)

Read more
1 Apr 2015 07:28

Roxi Says BNG Area Well Still Blocked, Other Drilling Progressing

Read more
9 Mar 2015 09:46

Roxi Petroleum Says Deep Well A5 Clean Up Continuing As Planned

Read more

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.