Less Ads, More Data, More Tools Register for FREE

Pin to quick picksHUR.L Share News (HUR)

  • There is currently no data for HUR

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Hurricane Energy Loss Widens; Downgrades Lancaster Recovery Estimate

Fri, 11th Sep 2020 10:31

(Alliance News) - Hurricane Energy PLC on Friday downgraded its oil recovery estimate for the two existing early production system wells at the Lancaster field and posted a widened interim loss.

Shares in Hurricane plunged 50% to 3.16 pence in London in morning trading.

It marked the first anniversary of production from the Lancaster early production system. During the period, 2.7 million barrels of oil was produced from the field, compared to just 528,000 barrels a year ago, taking total production since field start up in May 2019 to 6.6 million barrels.

However, the Lancaster field has proved more complex than initially though and, instead of being primarily a basement reservoir, it has oil-bearing sandstones onlapping the basement flanks, which might contain significant volumes of oil but more work its needed to understand how these impact reservoir performance and their ultimate potential.

Lancaster oil water contact is estimated to be at 1,330 metres versus the initial 1,597 to 1,678 metres estimate in the 2017 competent person's report. This shallower oil water contact is consistent with observed earlier and higher water production, as well as more rapid reservoir pressure decline, compared to what had originally been expected.

Given these new technical interpretations, the company's unaudited estimate of recovery from the two existing Lancaster early production system wells, assuming no more activity, has been reduced to 16.0 million barrels from 37.3 million. Given oil produced to the end of August, remaining proved and probable reserves are estimated to be 9.4 million barrels subject to an economic limit test.

"Consideration of near-term future activity is being focused on means to provide reservoir pressure support primarily by water injection, which if successfully implemented could significantly add to reserves, and/or targeted development of the onlapping sandstone reservoirs," said Hurricane.

Reflecting this, Hurricane's unaudited estimate of proved and probable contingent resources in the Lancaster field has been reduced to 58 million barrels remaining from 486 million barrels in the 2017 report.

Hurricane Energy said revenue for the six months to the end of June rose to USD81.9 million from USD22.5 million, as sales volumes grew to 2.8 million barrels from 356,000 barrels year-on-year.

Average sales price realised were lower, however, at USD29.8 per barrel versus USD63.2 a barrel a year earlier.

Its pretax loss widened considerably to USD258.5 million from USD27.5 million on a USD238.9 million impairment of oil and gas assets relating to Lancaster, including the impact of Covid-19 on crude oil demand and the Lancaster reserves estimate downgrade.

"2020 is proving to be a hugely challenging year for Hurricane. We have had to contend with not only a significant fall in oil prices and the effects of the Covid-19 pandemic, but also poorer than expected reservoir performance from the Lancaster early production system," said Chair Steven McTiernan.

"On a more optimistic note, initial studies suggest water injection could partially mitigate the reserves downgrade, and onlapping sandstones at Lancaster could represent material upside potential," added McTiernan.

By Anna Farley; annafarley@alliancenews.com

Copyright 2020 Alliance News Limited. All Rights Reserved.

More News
3 Sep 2018 09:57

Hurricane Energy reaches farm-in agreement with Spirit Energy

(Sharecast News) - British oil and gas company Hurricane Energy has seen Spirit Energy farm-in to half of its Lincoln and Warwick licences in the Greater Warwick Area.

Read more
3 Sep 2018 08:54

Hurricane Energy Shares Rise As Spirit Energy Farms-In To Licences

LONDON (Alliance News) - Shares rose in Hurricane Energy PLC on Monday after it said Spirit Energy Ltd has farmed into 50% of Hurricane's Lincoln and Warwick Licences, which cover the Greater

Read more
2 Aug 2018 10:57

Hurricane Energy Reaches Critical Milestone At Lancaster Oil Field

LONDON (Alliance News) - Oil and gas firm Hurricane Energy PLC said Thursday it had reached a "critical milestone" at its developmental Lancaster Field in Lancashire.The firm has

Read more
6 Jul 2018 08:21

Hurricane Energy Completes Well Operations At Lancaster Field

LONDON (Alliance News) - Hurricane Energy PLC said Friday the two production wells at its early production system development in the Lancaster Field are ready to be tied-in to the subsea have and

Read more
1 Jun 2018 08:58

Hurricane Energy Starts Operations At Lancaster Field In North Sea

LONDON (Alliance News) - Hurricane Energy PLC said Friday it has begun operations at the early production system development on the Lancaster Field.The UK oil and gas exploration firm said

Read more
17 May 2018 10:53

Hurricane Energy's Lancaster Early Production System Buoy On The Way

LONDON (Alliance News) - Oil and gas firm Hurricane Energy PLC on Thursday said the new buoy for its Lancaster early production system in the North Sea has left Dubai's Drydocks buoy is set to

Read more
16 May 2018 09:57

Hurricane Energy Starts Offshore Installation Phase On Lancaster Field

LONDON (Alliance News) - Oil and gas exploration firm Hurricane Energy PLC said Wednesday that it has started the offshore installation phase at the Early Production System on the Lancaster field,

Read more
23 Apr 2018 09:43

Hurricane Energy Appoints Kenmare Resources Chair As New Chairman

LONDON (Alliance News) - Oil and gas exploration firm Hurricane Energy PLC said Monday it appointed Kenmare Resources PLC Chairman Steven McTiernan as its own non-executive chairman from the start

Read more
29 Mar 2018 11:01

Hurricane Energy Progressing Operations After Boulder Relocation Works

LONDON (Alliance News) - Hurricane Energy PLC said on Thursday a further boulder relocation programme is not required for the development of the Lancaster

Read more
20 Mar 2018 09:48

Xmas Tree Systems Delivered To Hurricane Energy's Lancaster Field

LONDON (Alliance News) - Hurricane Energy PLC said on Tuesday two horizontal 'Xmas tree' systems have been delivered to its early production system on the field ahead

Read more
10 Nov 2016 12:49

DIRECTOR DEALINGS: Hurricane Energy Non-Executives Buy Shares

Read more
9 Nov 2016 13:07

Hurricane Energy confirms spudding of Lincoln Well

(ShareCast News) - Hurricane Energy confirms the spudding of the Lincoln Well, which targets targets a basement prospect geologically similar to the nearby Lancaster structure. "Seismic interpretation indicates a well-connected fault network within the Lincoln basement," the company said. "Encourag

Read more
12 Oct 2016 08:00

Hurricane Energy Picks Contractors For Early Lancaster Production

Read more
22 Sep 2016 10:05

Hurricane Needs Partner Or To Raise Equity To Fund Lancaster System

Read more
6 Jul 2016 08:58

Hurricane Energy Spuds Lancaster Well To Refine Resource Range

Read more

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.