Charles Jillings, CEO of Utilico, energized by strong economic momentum across Latin America. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmmerson Share News (EML)

Share Price Information for Emmerson (EML)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.35
Bid: 2.30
Ask: 2.40
Change: -0.05 (-2.08%)
Spread: 0.10 (4.348%)
Open: 2.40
High: 2.40
Low: 2.35
Prev. Close: 2.40
EML Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Emmerson finalises feasibility study components for Khemisset

Tue, 14th Jan 2020 12:37

(Sharecast News) - Morocco-focussed potash development company Emmerson has finalised the feasibility study components for the connection to road networks, including design and cost components, for its Khemisset Potash Project in Northern Morocco, it announced on Tuesday.
The London-listed firm said the project was advantaged by industry-leading capital costs and bottom quartile all-in delivered costs to customer, yielding outstanding economic metrics including average annual life of mine EBITDA of $236m and a post-tax net present value at a 10% discount (NPV10) of $1.14bn.

It said a selection of preferred project sites was completed following a comprehensive options study, and added that the road connection design and costing was completed, with the total budgeted cost for the construction of access roads via the A2 toll road being approximately $2.0m, including a 15% contingency.

Following confirmation of zero capital cost being required at port, the company said the road connection would be the only pre-production capital expenditure required for the entire logistics solution for Khemisset.

It added that the selected site location required only around 3.2 kilometres of paved roads to be built, to connect the project to an existing high-quality highway, with an additional 9.6 kilometres of gravel internal roads included in the design estimate.

Emmerson said there was no requirement to construct expensive rail connections.

The design and budget was completed by the independent engineering group Golder Associates according to AusIMM guidelines for capital cost estimates, and the board said the full feasibility study was on track for delivery in the first half of 2020, in line with forecasts.

"We identified the location of the Khemisset project as one of its major strengths from the outset; the proximity to world class existing infrastructure is a key tangible benefit," said chief executive officer Hayden Locke.

"To be able to select a site which connects to a highway so readily and with such low capital cost allows us to save significant amounts of pre-production spend compared to the majority of potash development projects globally.

"Once connected to the A2 toll road, trucks transporting potash can drive directly to the Port of Casablanca for shipping to our customers throughout the Atlantic corridor."

Locke said that importantly, the existing roads to the port were in "fantastic" condition, requiring no additional investment, and had "significant" capacity for the trucks that Khemisset would require.

"The ability to have such a simple and cost-effective end-to-end logistics solution will benefit the project not only through financing and construction, but throughout its lifecycle.

"This is the second completed workstream item from the ongoing feasibility study, which continues to progress well and is on schedule.

"We look forward to continuing to keep the market updated with various parts of the study as we progress towards its final release during the first half of 2020."

Att 1121 GMT, shares in Emmerson were down 1.22% at 3.9p.
More News
24 Jun 2021 19:56

TRADING UPDATES: Vitec and Allergy Therapeutics lift full-year outlook

TRADING UPDATES: Vitec and Allergy Therapeutics lift full-year outlook

Read more
4 Jun 2021 16:43

DIRECTOR DEALINGS: Future PLC CEO sells GBP5.8 million in award shares

DIRECTOR DEALINGS: Future PLC CEO sells GBP5.8 million in award shares

Read more
17 May 2021 12:11

TRADING UPDATES: Hollywood Bowl sees risk of 4th lockdown in December

TRADING UPDATES: Hollywood Bowl sees risk of 4th lockdown in December

Read more
27 Apr 2021 14:07

IN BRIEF: Kelly takes Emmerson chair as potash miner switches to AIM

IN BRIEF: Kelly takes Emmerson chair as potash miner switches to AIM

Read more
15 Apr 2021 19:37

TRADING UPDATES: HSBC announces redemption of US dollar securities

TRADING UPDATES: HSBC announces redemption of US dollar securities

Read more
25 Mar 2021 15:57

EXECUTIVE CHANGES: Ten Entertainment, Emmerson chairs step down

EXECUTIVE CHANGES: Ten Entertainment, Emmerson chairs step down

Read more
23 Mar 2021 15:04

EXECUTIVE CHANGES: BT Group Regulatory Affairs Director Ross leaves

EXECUTIVE CHANGES: BT Group Regulatory Affairs Director Ross leaves

Read more
18 Mar 2021 16:03

UK shareholder meetings calendar - next 7 days

UK shareholder meetings calendar - next 7 days

Read more
2 Mar 2021 16:43

IN BRIEF: Emmerson plans April move to AIM from London Main Market

IN BRIEF: Emmerson plans April move to AIM from London Main Market

Read more
26 Feb 2021 19:10

Emmerson Raises GBP5.5 Million Via Placing; Proposes Move To AIM

Emmerson Raises GBP5.5 Million Via Placing; Proposes Move To AIM

Read more
17 Feb 2021 11:29

IN BRIEF: Emmerson Assesses Khemisset Potash Project Development

IN BRIEF: Emmerson Assesses Khemisset Potash Project Development

Read more
9 Feb 2021 10:55

Emmerson Shares Rise On Khemisset Mining Licence Approval

Emmerson Shares Rise On Khemisset Mining Licence Approval

Read more
5 Jan 2021 06:56

IN BRIEF: Emmerson Expects Khemisset Project Permits In 2021

IN BRIEF: Emmerson Expects Khemisset Project Permits In 2021

Read more
24 Dec 2020 12:40

IN BRIEF: Emmerson Promotes New CEO To Board Director

IN BRIEF: Emmerson Promotes New CEO To Board Director

Read more
18 Nov 2020 20:27

IN BRIEF: Emmerson Completes Workstreams Required For Khemisset ESIA

IN BRIEF: Emmerson Completes Workstreams Required For Khemisset ESIA

Read more

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.