The latest Investing Matters Podcast episode featuring financial educator and author Jared Dillian has been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAsiamet Res Share News (ARS)

Share Price Information for Asiamet Res (ARS)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.25
Bid: 1.20
Ask: 1.30
Change: 0.00 (0.00%)
Spread: 0.10 (8.333%)
Open: 1.25
High: 1.275
Low: 1.25
Prev. Close: 1.25
ARS Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Asiamet Drilling Off To "Flying Start" By Finding Near Surface Copper

Thu, 21st Jul 2016 09:59

LONDON (Alliance News) - Asiamet Resources Ltd Thursday said the drilling programme being conducted on the Beraung Kenan Main deposit in Indonesia as part of the work toward the feasibility study for the asset has got off to a "flying start".

Infill and extension drilling is being undertaken on the copper deposit in Central Kalimantan and is continuing to intersect high grade copper mineralisation in the southern part of the deposit and has confirmed "good continuity of higher grades" previously reported within the zone.

Four drill rigs are being used and 25 holes have been completed so far, comprised of 2,558 metres, and a further four holes are currently in progress. Five large diameter holes collecting bulk samples for copper leaching test work have also been completed with an additional 12 holes to follow.

The latest assay results have been received for three infill holes which were drilled to extend the resource eastward.

The first hole delivered intersects of 12.0 metres at 0.93% copper and another produced an intersection of 43.0 metres at 1.16% copper, including 8.0 metres at 2.52% copper and 13.0 metres at 1.6% copper.

Another hole delivered 5.0 metres at 1.8% copper and 6.2 metres at 1.06% copper, with that hole terminating at a grade of 1.2%, confirming the extension to the east. Another intersect from that hole came in at 22.0 metres at 1.07% copper, including 3.0 metres at 5.42% copper.

Assay results for a further five holes are expected shortly.

"Consistent intersections of strong copper mineralisation grading 1% to 2% and above so close to surface is considered to be highly positive for the Beraung Kan Main project, as is the extension of mineralisation beyond the current resource envelope," said the company.

"This shallow higher grade mineralisation is easily accessible for early mining and has the potential to further improve the very low mining strip ratio generated in the Beraung Kan Main preliminary economic assessment," Asiamet added.

Lower strip ratios would likely bring the mining costs down, therefore boosting the profitability and economics of the operation.

"The Beraung Kan Main deposit feasibility study drilling program is off to a flying start with these first results providing early confirmation of continuous shallow, high grade mineralization at the BK058 Zone," said Chief Executive Tony Manini.

Asiamet shares were up 2.9% to 2.34 pence per share on Thursday morning.

By Joshua Warner; joshuawarner@alliancenews.com; @JoshAlliance

Copyright 2016 Alliance News Limited. All Rights Reserved.

More News
10 May 2024 16:39

EARNINGS AND TRADING: Asiamet Resources declares special dividend

(Alliance News) - The following is a round-up of earnings and trading updates by London-listed companies, issued on Thursday and not separately reported by Alliance News:

Read more
10 May 2024 16:39

EARNINGS AND TRADING: Asiamet Resources declares special dividend

(Alliance News) - The following is a round-up of earnings and trading updates by London-listed companies, issued on Thursday and not separately reported by Alliance News:

Read more
17 Apr 2024 13:34

IN BRIEF: Asiamet hails "outstanding" high grade copper sample results

Asiamet Resources Ltd - London-based mineral exploration company focused on copper, gold and polymetallic assets in Indonesia - Collects two samples from surface in the central area of the BKM deposit in Central Kalimantan, Indonesia, which assayed 24.0% and 23.3% of copper. Says these high-grade results are consistent with previous surface sampling and reinforce the upside potential of both the BKM and BKZ deposits. Chief Executive Officer Darryn McClelland says: "The recent due diligence site visits have been very positive with good feedback received from all groups. The assay results from these grab samples are outstanding and, specifically for BKM, provide encouragement for the company in the fact that samples of this grade are found at surface. Our current mine plan targets mining of high grade starter pits from the BKM resource delivering high grade feed early in the life of the project allowing strong ramp up of copper production."

Read more
28 Mar 2024 14:28

TRADING UPDATES: Baron Oil surrenders licence; DG Innovate proposes JV

(Alliance News) - The following is a round-up of updates by London-listed companies, issued on Thursday and not separately reported by Alliance News:

Read more
27 Mar 2024 18:47

TRADING UPDATES: Empire Metals targets key milestones in Australia

(Alliance News) - The following is a round-up of updates by London-listed companies, issued on Wednesday and not separately reported by Alliance News:

Read more
1 Mar 2024 18:29

TRADING UPDATES: Alpha Real Trust says in "robust" financial shape

(Alliance News) - The following is a round-up of updates by London-listed companies, issued on Friday and not separately reported by Alliance News:

Read more
28 Dec 2023 16:46

London close: Stocks slip as US jobless claims top expectations

(Sharecast News) - London's stock markets experienced a modest decline on Thursday, as the day unfolded with a pronounced lack of significant market-moving developments.

Read more
28 Dec 2023 11:57

Asiamet Resources reports progress at BKM copper project

(Sharecast News) - Asiamet Resources updated the market on its feasibility-stage BKM copper project in Central Kalimantan, Indonesia on Thursday.

Read more
28 Dec 2023 11:10

Asiamet Resources makes "significant progress" in BKM copper project

(Alliance News) - Asiamet Resources Ltd on Thursday said it had made significant financial and engineering progress regarding its feasibility stage BKM copper project in Central Kalimantan, Indonesia.

Read more
15 Nov 2023 14:04

IN BRIEF: Asiamet Resources gets GBP3.3 million financing for project

Asiamet Resources Ltd - focused on copper, gold and polymetallic assets in Indonesia - Notes USD4 million non-brokered private placement to PT Delta Dunia Makmur Tbk through the issue of 366.9 million new shares at an issue price of 0.9 pence per share. This includes Asiamet Chief Executive Officer Darryn McClelland subscribing for 4.0 million new shares on the same terms. Net proceeds of the placement and subscription will be used to advance the Beruang Kanan Main copper project in central Kalimantan, Indonesia. Following the completion of the placement, PT Delta Dunia Makmur will have around a 35% stake in Asiamet.

Read more
30 Oct 2023 17:45

TRADING UPDATES: Versarien "pleased"; D4t4 first-half revenue rises

(Alliance News) - The following is a round-up of updates by London-listed companies, issued on Monday and not separately reported by Alliance News:

Read more
6 Oct 2023 15:11

Asiamet makes solid progress on BKM copper project

(Sharecast News) - Asiamet Resources updated the market on the BKM copper project in Central Kalimantan, Indonesia, on Friday, reporting robust advancements in multiple work streams related to its development.

Read more
6 Oct 2023 10:08

Asiamet Resources shares rise on progress at BKM copper project

(Alliance News) - Asiamet Resources Ltd on Friday updated shareholders on the latest progress at the BKM copper project in central Kalimantan, Indonesia, having made positive steps towards financing the project.

Read more
27 Sep 2023 18:48

IN BRIEF: Asiamet Resources loss narrows as expenses decrease 24%

Asiamet Resources Ltd - Jakarta, Indonesia-based mining company - Reports net loss for the year to June 30 totalled GBP3.0 million narrowed from GBP4.0 million, the year prior. Expenses fell to GBP2.9 million from GBP3.8 million before, a 24% drop. Basic and diluted loss per share were 0.15 pence compared to 0.21p. Cash at the period end was GBP2.3 million, more than halved from GBP5.2 million.

Read more
8 Aug 2023 10:47

Asiamet Resources makes progress with financing opportunities

(Alliance News) - Asiamet Resources Ltd on Tuesday said it is making "considerable" progress in its project financing workstreams to develop its BKM copper mine project in Indonesia.

Read more

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.