The next focusIR Investor Webinar takes places on 14th May with guest speakers from WS Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksZanaga Iron Regulatory News (ZIOC)

Share Price Information for Zanaga Iron (ZIOC)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 7.20
Bid: 7.10
Ask: 7.30
Change: -0.14 (-1.91%)
Spread: 0.20 (2.817%)
Open: 7.20
High: 7.20
Low: 7.20
Prev. Close: 7.34
ZIOC Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Interim Results for Six Months to 30 June 2012

28 Sep 2012 07:00

RNS Number : 3926N
Zanaga Iron Ore Company Ltd
28 September 2012
 



28 September 2012

 

 

 

INTERIM RESULTS FOR THE SIX MONTHS TO 30 JUNE 2012

 

Zanaga Iron Ore Company Limited ("ZIOC" or the "Company") (AIM:ZIOC) is pleased to announce its unaudited interim results for the six months ended 30 June 2012.

Highlights

Zanaga Project, Republic of Congo

·; Pre-Feasibility Study to examine slurry pipeline transportation option ("Pipeline PFS") nearing completion

- Publication of key outcomes expected October 2012

·; 57% increase in JORC Mineral Resource to 6.8 billion tonnes at 32.0% Fe, with 69% in the Measured & Indicated resource category

- Drilling programme to Feasibility Study standard completed

- 74% increase in Measured and Indicated resource category to 4.69 billion tonnes with an average grade of 32.5% Fe

- More than 176,000 metres drilled across only 25km of the 47km orebody

Corporate

·; Cash balance of US$42.5m as at 30 June 2012

 

Clifford Elphick, Non-Executive Chairman of ZIOC, commented:

"I am pleased to report substantial progress on the Zanaga Project during the first half of the year. Following the positive results of the Value Engineering Exercise on a slurry pipeline transportation option, a Pre-Feasibility Study was initiated to further refine this option, with the potential for improved economics and a higher grade product. The Pipeline PFS is nearing completion and we expect to announce the results in October 2012. This will assist in determining which transport option to take through to final Feasibility Study.

In addition, an extensive drilling campaign has been conducted to Feasibility Study standards, resulting in a 57% increase in the size of the JORC Mineral Resource, as well as further improvements in the understanding of our large orebody, The JORC Mineral Resource has now increased to 6.8 billion tonnes at 32% Fe, with 69% contained in the Measured & Indicated resource category."

 

 

 

Copies of the unaudited interim results for the six months ended 30 June 2012 are available on the Company's website at www.zanagairon.com.

 

 

 

For further information please contact:

 

Zanaga Iron Ore

Corporate Development and Andrew TraharInvestor Relations Manager +44 20 7399 1105

 

Liberum Capital Limited

Nominated Adviser, Financial Chris Bowman, Christopher BrittonAdviser and Joint Corporate Broker and Christopher Kololian

+44 20 3100 2000

 

Citigroup Global Markets Limited

Joint Corporate Broker Alex Carter

+44 20 7986 4000

 

Pelham Bell Pottinger

Financial PR James MacFarlane and Daniel Thöle

+44 20 7861 3232

 

Business Review - Operations

 

Mineral Resource

 

Work during the first half of the year was aimed at increasing the geology and mineralogical understanding of the Zanaga Iron Ore deposit. The project team successfully completed an extensive drilling programme on the Project's orebody, delivering a substantial resource increase and upgrade in September 2012.

 

The scale and definition of the Mineral Resource Estimate, reported in accordance with JORC, has now expanded to 6.8 billion tonnes ("Bt") at a grade of 32% Fe,further supporting the large scale, long life potential of the Project. Approximately 69% of the resource is now in the Measured and Indicated categories. This mineral resource has been defined from drilling conducted over only 25 kilometres of the 47-kilometre strike length of magnetic mineralisation.

 

Data used in the preparation of the Mineral Resource Estimate was sourced from all available information collected from diamond and RC drilling completed at the Zanaga Project, to a cut-off date of 15 July 2012. This includes an additional 49,125 metres (39% increase) of drilling since the previous resource statement announced on 26 October 2011. A total of 176,109 metres (1,213 holes) have been drilled to date, with 79,288 assays (XRF analyses and Niton analyses) used to model the mineral resource.

 

Drilling completed

Metres

At 26 Aug 2011 (previous resource estimate, announced 26 Oct 2011)

126,984

26 Aug 2011 - 15 July 2012 (cut-off for updated resource estimate, announced 4 Sept 2012)

49,125

Total to date

176,109

 

Note: The Mineral Resource referred to above, announced by ZIOC on 4 September 2012, is consistent with the terms and definitions included in the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code 2004 edition)

Pipeline Pre-Feasibility Study

The Value Engineering Exercise ("VEE") results, presented in Q4 2011, confirmed two viable transport options for the development of the Zanaga Project, with a slurry pipeline demonstrating the potential to be the more economically attractive option. Following this, a Pipeline Pre-Feasibility Study ("Pipeline PFS") commenced with the objective of further refining this option and its costing.

The Pipeline PFS has progressed well and is nearing completion, with the key outcomes expected to be announced during October 2012. The PFS has been conducted to Xstrata's rigorous standards, in conjunction with a consortium of top-tier consultants based in France and Australia, and has included a detailed metallurgical test work campaign at SGA's laboratories in Germany to determine the product specifications.

Feasibility Study

Under the terms of the joint venture, Xstrata must use reasonable efforts to ensure a feasibility study ("FS") on the Zanaga Project is completed by no later than three months prior to the expiration of the exploration licences in August 2014 or any subsequent renewal and subject to there being no material adverse change. Xstrata is also obliged to fund the costs of the FS which must comply with international best practice and Xstrata's internal FS guidelines.

Outlook

The investment case for ZIOC continues to be supported by strong industry fundamentals, while the scale and high quality of the Project offer value and world-class potential.

Project milestones for H2 2012 are the announcement of the key outcomes of the Pipeline PFS, advancement of the Project's FS and ESIA work streams, as well as ongoing interaction with the government of the Republic of Congo on the Project's development. This will include discussions on terms for a definitive Mining Convention (Convention d'Etablissement) which will secure the legal, commercial and regulatory aspects required for the Project's development.

Under the management of Xstrata, the Project continues to progress as it moves towards the development and construction of a world-class iron ore project. Xstrata's funding obligations in relation to the Project and the FS means ZIOC does not currently foresee any substantial near-term spending obligations until completion of the FS. The cost of ZIOC personnel, financial advisors and technical experts engaged or appointed by ZIOC in relation to the Project are currently the only budgeted expenditures for the Project during the FS phase of work. ZIOC expects the substantial investment programme being undertaken on the Project to continue to build shareholder value. 

Financial review

Results from operations

The financial statements contain the results for ZIOC for the first half of 2012. ZIOC made a loss in the half-year of US$7.4m compared to a loss of US$22.9m in the year to 31 December 2011. The loss for the half-year comprised:

 

1 January to30 June2012

Unaudited

US$000

1 January to30 June2011

Unaudited

US$000

1 January to31 December2011

AuditedUS$000

General expenses

(2,499)

(1,781)

(4,570)

Net foreign exchange profit

417

1,593

274

Share-based payments

(343)

(707)

(2,425)

Share of loss of associate

(21)

(2,996)

(7,803)

Interest income

83

87

173

Loss before tax

(2,363)

(3,804)

(14,351)

Tax

(20)

-

(28)

Currency translation

1

-

38

Share of other comprehensive income of associate - foreign exchange

(5,037)

2

(8,517)

Total comprehensive loss

(7,419)

(3,802)

(22,858)

General expenses of US$2.5m consist of staff costs of US$0.3m, Directors fees of US$0.3m, professional fees of US$1.4m and US$0.5m of other general operating expenses.

The foreign exchange profit of US$0.4m can be attributed to the impact of the weakening of the US Dollar against UK Sterling during the half-year on the cash balances that are held in UK Sterling.

The share-based payment charge reflects the expense associated with the grant of options under ZIOC's long-term incentive plan ("LTIP") and other options to ZIOC's directors, two key employees and one of ZIOC's consultants.

The share of loss of associate reflected above relates to ZIOC's investment in Jumelles Limited, the joint venture company in respect of the Zanaga Project, which generated a loss of US$0.002m in the six months to 30 June 2012, together with a charge of US$0.019m made for equity accounting purposes for share options provided to employees of Jumelles Limited.

During the half year period, Jumelles Limited spent US$28.2m on exploration, increasing its capitalised exploration assets to US$195.0m. 

 

Financial position

ZIOC's net asset value ("NAV") of US$220.2m comprises of a US$178.5m investment in Jumelles Limited, US$42.5m of cash balances and US$0.8m of other net current liabilities.

 

30 June 2012

UnauditedUS$000

30 June 2011

UnauditedUS$000

31 December 2011

AuditedUS$000

Investment in associate

178.5

195.8

183.0

Cash

42.5

48.5

45.0

Other net current liabilities

(0.8)

(0.2)

(0.8)

Net assets

220.2

244.1

227.2

Cost of investment

The investment in associate relates to the value of the investment in Jumelles which as at 30 June 2012 owned 100% of the Project. The carrying value of this investment has decreased by US$4.5m due to the US$5.0m comprehensive loss made by Jumelles Limited during the half-year which resulted from a $5.0m currency translation adjustment, and by a US$0.5m additional investment, funded jointly (50/50) with Xstrata, for the survey of an additional land area. Though Jumelles acquired the non-exclusive prospecting licence for this area, it does not form part of the existing ZIOC Xstrata joint venture agreement.

As at 30 June 2012, Jumelles Limited had aggregated assets of US$219.5m (June 2011: US$228.1m) and aggregated liabilities of US$48.0m (June 2011: US$16.0m). Assets consisted of US$195.0m (June 2011: US$126.6m) of capitalised exploration assets and US$15.2m (June 2011: US$15.1m) of other fixed assets including property, plant and equipment. A total of US$28.2m (2011: US$47.6m) of exploration costs were capitalised during the half year period. Cash balances totalled US$6.3m (June 2011: US$7.1m) and other current assets decreased from US$10.3m to US$2.9m during the half-year.

Cash flow

 

Cash balances have decreased by US$2.5m since 31 December 2011. Operating activities utilised US$2.4m, the additional land area investment in associate US$0.5m and foreign exchange differences generated a cash profit of US$0.4m as the value of the US Dollar weakened against the UK Sterling thereby increasing the US Dollar value of the UK Sterling denominated cash balances.

Statement of comprehensive income

for the six months ended 30 June 2012

 

Note

1 Januaryto

30 June 2012

Unaudited

 US$000

1 Januaryto

30 June 2011

Unaudited

 US$000

1 January

 to31 December 2011

Audited

US$000

Administrative expenses

(2,425)

(895)

(6,721)

Share of loss of associate

(21)

(2,996)

(7,803)

Operating loss

(2,446)

(3,891)

(14,524)

Interest income

83

87

173

Loss before tax

(2,363)

(3,804)

(14,351)

Taxation

5

(20)

-

(28)

Loss for the period

(2,383)

(3,804)

(14,379)

Foreign exchange translation - foreign operations

1

-

38

Share of other comprehensive income of associate - foreign exchange translation

(5,037)

2

(8,517)

Other comprehensive loss

(5,036)

2

(8,479)

Total comprehensive loss

(7,419)

(3,802)

(22,858)

Loss per share (basic and diluted) (Cents)

7

(0.9)

(1.4)

(5.2)

The loss for the period is attributable to the equity holders of the parent company.

Statement of changes in equity

for the six months ended 30 June 2012

 

Foreign

currency

Share

Retained

translation

Total

capital

earnings

reserve

equity

US$000

US$000

US$000

US$000

Balance at 1 January 2011

256,070

(15,422)

536

241,184

Consideration for share-based payments - other services

6,674

-

-

6,674

Loss for the period

-

(3,804)

-

(3,804)

Other comprehensive income

-

-

2

2

Total comprehensive loss

-

(3,804)

2

(3,802)

Balance at 30 June 2011

262,744

(19,226)

538

244,056

Consideration for share-based payments - other services

2,249

-

-

2,249

Loss for the period

-

(10,575)

-

(10,575)

Other comprehensive income

-

-

(8,481)

(8,481)

Total comprehensive loss

-

(10,575)

(8,481)

(19,056)

Balance at 31 December 2011

264,993

(29,801)

(7,943)

227,249

Consideration for share-based payments - other services

362

-

-

362

Loss for the period

-

(2,383)

-

(2,383)

Other comprehensive income

-

-

(5,036)

(5,036)

Total comprehensive loss

-

(2,383)

(5,036)

(7,419)

Balance at 30 June 2012

265,355

(32,184)

(12,979)

220,192

 

 

Balance sheet

as at 30 June 2012

 

30 June 2012 Unaudited

30 June 2011

Unaudited

31 December 2011

Audited

Note

US$000

US$000

US$000

Non-current asset

Property, plant and equipment

74

-

13

Investment in associate

6

178,452

195,771

182,977

178,526

195,771

182,990

Current assets

Other receivables

160

96

104

Cash and cash equivalents

42,529

48,471

45,047

42,689

48,567

45,151

Total Assets

221,215

244,338

228,141

Current liabilities

Trade and other payables

(1,023)

(282)

(892)

Net assets

220,192

244,056

227,249

Equity attributable to equity holders of the parent

Share capital

265,355

262,744

264,993

Retained earnings

(32,184)

(19,226)

(29,801)

Foreign currency translation reserve

(12,979)

538

(7,943)

Total equity

220,192

244,056

227,249

These financial statements set out on pages 7 to 14 were approved by the Board of Directors on 27 September 2012 and were signed on its behalf by:

Mr D Elzas

Director

 

Mr C Elphick

Director

Cash flow statement

for the six months ended 30 June 2012

 

1 January

1 January

1 January

to

to

to

30 June

30 June

31 December

2012

Unaudited

2011

Unaudited

2011

Audited

Note

US$000

US$000

US$000

Cash flows from operating activities

Total comprehensive loss for the period

(7,419)

(3,802)

(22,858)

Adjustments for:

Depreciation

8

-

3

Interest received

(83)

-

(173)

Taxation expense

20

-

28

Increase in other receivables

(56)

(16)

(24)

(Decrease)/ Increase in trade and other payables

134

(731)

(65)

Net exchange profit

(417)

(1,593)

(274)

Share of loss of associate

5,058

2,996

16,320

Share-based payments

343

706

2,425

Net cash from operating activities

(2,412)

(2,440)

(4,618)

Cash flows from financing activities

Proceeds from the issue of share capital

-

-

-

Share issue costs

-

-

-

Net cash from financing activities

-

-

-

Cash flows from investing activities

Interest received

83

-

173

Acquisition of property, plant and equipment

(69)

-

(16)

Investment in associate

(515)

-

-

Net cash from investing activities

(501)

-

157

Net decrease in cash and cash equivalents

(2,913)

(2,440)

(4,461)

Cash and cash equivalents at beginning of period

45,047

49,318

49,318

Effect of exchange rate difference

395

1,593

190

Cash and cash equivalents at end of period

42,529

48,471

45,047

The notes on pages 11 to 14 form an integral part of the financial statements.

Notes to the financial statements

1 Business information and going concern basis of preparation

In common with many exploration and development companies in the mining sector, the Company raises funding in phases as its projects develop.

Following exercise of the Xstrata First Call Option, Xstrata is required to fund and implement the FS in accordance with the Xstrata Joint Venture Agreement. Xstrata has undertaken to use its reasonable endeavours to complete the FS at least three months prior to the expiration of the Zanaga Exploration Licences in August 2014 or any subsequent renewal, subject to there being no adverse change. The directors have a reasonable expectation that the Company has adequate financial resources to continue in operational existence for the foreseeable future. For these reasons, the financial statements of the Company have been prepared on a going concern basis.

In the event that a decision is taken to develop a mine at Zanaga (and assuming that Xstrata Projects has not exercised its call option to acquire the Company's interest in JumellesLimited) the Company will need to raise further funds.

 

2 Accounting policies

The principal accounting policies applied in the preparation of these financial statements are set out below. These policies have been consistently applied to all the periods presented, unless otherwise stated.

 

3 Basis of preparation

The condensed set of financial statements has been prepared in accordance with IAS 34 Interim Financial Reporting as adopted by the EU.

In accordance with the AIM Rules for Companies, the condensed set of financial statements has been prepared in applying the accounting policies and presentation that were applied in the preparation of the Company's published consolidated financial statements for the year ended 31 December 2011. The comparative figures for the financial year ended 31 December 2011 are not the Company's statutory accounts for that financial year. The accounts have been reported on by the Company's auditors. The report of the auditors was (i) unqualified and (ii) did not include a reference to any matter to which the auditors drew attention by way of emphasis without qualifying their report.

 

4 Segmental reporting

The Company has one operating segment, being its investment in the Zanaga Project, held through Jumelles Limited. Financial information regarding this segment is provided in note 6.  

 

5 Taxation

The Company is exempt from most forms of taxation in the British Virgin Islands ("BVI"), provided the Company does not trade in the BVI and does not have any employees working in the BVI. All dividends, interest, rents, royalties and other expense amounts paid by the Company, and capital gains realised with respect to any shares, debt obligations or other securities of the Company, are exempt from taxation in the BVI.

The tax charge in the period relates to the Company's subsidiary Zanaga UK Services Limited.

 

30 June 2012

 Unaudited

30 June 2011

Unaudited

31 December 2011

Audited

US$000

US$000

US$000

Recognised in other comprehensive income:

Current year

(20)

-

(28)

Reconciliation of effective tax rate

Loss before tax

(2,363)

(3,804)

(14,351)

Income tax using the BVI corporation tax rate of 0% (2011: 0%)

-

-

-

Effect of tax rate in foreign jurisdictions

(20)

-

(28)

(20)

-

(28)

The effective tax rate for the Group is 0.9% (December 2011: 0.2%).

 

6 Investment in associate

 

US$000

Balance at 1 January 2011

192,799

Additions

5,968

Share of comprehensive income

(2,996)

Balance at 30 June 2011

195,771

Additions

530

Share of comprehensive income

(13,324)

Balance at 31 December 2011

182,977

Additions

533

Share of comprehensive income

(5,058)

Balance at 30 June 2012

178,452

The investment represents a 100% holding in Jumelles for the entire share capital of 2,000,000 shares. The shares were acquired in exchange for shares in the Company and have been recorded at fair value of the interest acquired.

The additions to the investment during 2012 are due to the Group granting awards under the LTIP and other options to employees of Jumelles ($19k), and a US$0.5m additional investment funded jointly (50/50) with Xstrata for the survey of an additional land area. Though Jumelles acquired the non-exclusive prospecting licence for this area, it does not form part of the existing ZIOC Xstrata joint venture agreement.

From its acquisition and up to 11 February 2011, the investment in Jumelles did not represent an investment in a subsidiary due to the call option held by Xstrata described in Note 1 above which throughout that period gave Xstrata Projects potential voting rights which would have been sufficient for Xstrata Projects to control Jumelles. Following exercise of the Xstrata Call Option, the residual rights retained by the Group are sufficient in the view of the Directors to provide the Group with the power to participate significantly in the financial and operating decisions affecting Jumelles. As a consequence the Group's interest is accounted for as an associate using the equity method of accounting.

As explained in Note 1, on 11 February 2011, Xstrata Projects exercised the Xstrata Call Option and from that date owns 50% plus one share of Jumelles and Jumelles is controlled at both a shareholder and director level by Xstrata Projects. However, as the shares issued on exercise of the option are not considered to vest until provision of the services relating to the PFS and the FS has been completed, the Group will continue to account for a 100% interest in Jumelles Limited until the FS has been completed. Only at that time will the Group account for a reduction in its interest in Jumelles.

The Group financial statements account for the Xstrata Projects transaction as an in-substance equity-settled share-based payment for the provision of services by Xstrata Projects to Jumelles in relation to the PFS and the FS. These services largely are provided through third party contractors and are measured at the cost of the services provided.

As at 30 June 2012, Jumelles Limited had aggregated assets of US$219.5m (June 2011: US$228.1m) and aggregated liabilities of US$48.0m (June 2011: US$16.0m). For the 6 months ended 30 June 2012, it incurred administrative expenses of US$21k (June 2011: US$3.1m) and incurred no taxation charge (June 2011: US$26k). A summarised consolidated balance sheet of Jumelles Limited for the 6 months ended 30 June 2012, including adjustments made for equity accounting, is included below:

30 June

2012

UnauditedUS$000

30 June

2011

UnauditedUS$000

31 December

2011

Audited

US$000

Non-current assets

Property, plant and equipment

15,089

15,095

12,704

Exploration and other evaluation assets

195,024

126,588

166,815

Intangible assets

146

-

145

210,259

141,683

179,664

Current assets

9,235

86,434

20,732

Current liabilities

(47,982)

(15,998)

(37,461)

Net current assets/(liabilities)

(38,747)

70,436

(16,729)

Net assets

171,512

212,119

162,935

Share capital

9,580

9,031

9,561

Share option reserve

203,324

227,131

190,738

Capital Contribution

1,030

-

-

Translation reserve

(13,606)

(55)

(8,569)

Retained earnings

(28,816)

(23,988)

(28,795)

171,512

212,119

162,935

 

 

7 Loss per share

 

 

30 June

2012

Unaudited

30 June

2011

Unaudited

31 December

2011

Audited

Loss (Basic and diluted)

(2,383)

(3,804)

(14,379)

Weighted average number of shares (thousands)

Basic and diluted

Issued shares at beginning of period

280,416

280,416

280,416

Effect of shares issued

-

-

-

Effect of share repurchase

-

-

-

Effect of own shares

(5,010)

(5,574)

(5,574)

Effect of share split

-

-

-

Weighted average number of shares at end of period - basic

275,406

274,842

274,842

Loss per share (cent)

Basic and diluted

(0.9)

(1.4)

(5.2)

 

8 Related parties

The following transactions occurred with related parties during the period:

 

Transactions for the period

Closing balance

 

 

30 June

2012

Unaudited

30 June

2011

Unaudited

31 December

2011

Audited

 

30 June

2012

Unaudited

30 June

2011

Unaudited

31 December

2011

Audited

US$000

US$000

US$000

US$000

US$000

US$000

Intercompany payable Jumelles Limited

-

234

234

 

64

 

64

64

Intercompany payable Jumelles Technical Services UK Limited

-

27

(17)

 

21

 

11

21

Strata Capital UK LLP

170

57

52

175

-

5

 

In addition to the transactions above, the Company has also issued share options to Strata Capital UK LLP. In this regard see page 54, note 15 in the Company's 2011 Annual Report. A further award was granted in March 2012. These options have a weighted average price of £1.06 (US$1.40), a weighted average fair value of £0.37 (US$0.49) and a weighted average contractual life of 821 days.

 

Board of Directors

Clifford Thomas Elphick

Non-Executive Chairman

51 years

Clifford Elphick is the founder and CEO of Gem Diamonds Limited, a diamond mining company listed on the Main Market of the London Stock Exchange. Mr Elphick joined Anglo American Corporation in 1986 and was seconded to E Oppenheimer & Son as Harry Oppenheimer's personal assistant in 1988. In 1990 he was appointed managing director of E Oppenheimer & Son, a position he held until his departure from the company in December 2004. During that time, Mr Elphick was also a director of Central Holdings, Anglo American and DB Investments. Following the buy-out of De Beers in 2000, Mr Elphick served on the De Beers executive committee until 2004. Mr. Elphick formed Gem Diamonds Limited in July 2005.

Colin John Harris

Non-Executive Director

65 years

Colin Harris has been working as an exploration geologist for over 40 years and has a wealth of experience in the generation, exploration and evaluation of projects covering a variety of commodities and deposit styles in over 25 countries mainly in Africa and Europe. He has worked for major international mining companies including Anglo American, Cominco and more recently Rio Tinto. During his 18 years at Rio Tinto Mr Harris managed multi-million dollar programmes which in the past 15 years included the evaluation of iron ore deposits in Greenland, Scandinavia, Mali, Mauritania, Algeria, Morocco, Liberia, Senegal and Sierra Leone and more importantly between 1998 and 2008 heading up the team evaluating the world-class Simandou iron ore project in the Republic of Guinea. Mr Harris resigned from Rio Tinto in 2008 and joined the Zanaga team later in the year as Project Director. Mr Harris stepped down as Project Director of the Project after Xstrata exercised its First Call Option. Mr Harris is also a non-executive director of AIM listed Ncondezi Coal Company Limited and AIM and Oslo AXESS listed London Mining plc.

Clinton James Dines

Non-Executive Director

54 years

Clinton Dines has been involved in business in China since 1980, including senior positions with the Jardine Matheson Group, Santa Fe Transport Group and Asia Securities Venture Capital. In 1988 he joined BHP as their senior executive in China and, following the merger of BHP and Billiton in 2001, he became president, BHP Billiton China, a position from which he retired in 2009. Mr Dines is currently a non-executive director of Kazakhmys plc, which is listed on the Main Market of the London Stock Exchange.

Michael John Haworth

Non-Executive Director

46 years

Michael Haworth is a director of Strata Limited, Garbet Limited and is the managing partner of Strata Capital UK LLP. Mr Haworth has 12 years' investment banking experience, predominantly in emerging markets and natural resources. Prior to establishing Strata Limited in 2006, Mr Haworth was a Managing Director at J.P. Morgan and Head of Mining and Metals Corporate Finance in London. During his 10 years at J.P. Morgan, Mr Haworth held a number of other positions, including head of M&A for Central Eastern Europe, Middle East and Africa and, before that, head of M&A in South Africa. Mr Haworth is also Non-Executive Chairman of AIM listed Ncondezi Coal Company Limited.

Dave John Elzas

Non-Executive Director

46 years

Dave Elzas has over 15 years' experience in international investment banking. Between 1994 and 2000, Mr Elzas served as a senior executive and subsequently managing director of the Beny Steinmetz Group. Mr Elzas is currently the senior partner and CEO of the Geneva Management Group, an international wealth management and financial services company. Mr Elzas has been a non-executive director of Gem Diamonds Limited since October 2005.

 

Advisors

Nominated Advisor and Joint Corporate BrokerLiberum Capital LimitedRopemaker Place, Level 1225 Ropemaker StreetLondon EC2Y 9LY

Joint Corporate BrokerCitigroup Global Markets LimitedCitigroup Centre33 Canada Square, Canary WharfLondon E14 5LB

 

Auditors and Reporting Accountants

KPMG Audit Plc15 Canada SquareLondon E14 5GL

LegalBerwin Leighton Paisner LLPAdelaide HouseLondon BridgeLondon EC4R 9HA

RegistrarsComputershare Investor Services (BVI) LimitedWoodbourne HallPO Box 3162Road TownTortolaBritish Virgin Islands

Financial PRPelham Bell Pottinger5th FloorHolborn Gate330 High HolbornLondon WC1V 7QDUnited Kingdom

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
IR UBRARUKAKUUR
Date   Source Headline
30th Apr 20247:00 amRNSFeasibility Study Update
28th Mar 20244:06 pmRNSCorporate and Project Update
2nd Jan 20247:00 amRNSGlencore Loan Update
28th Dec 20237:00 amRNSMoU signed with CMEC and FS Process Update
19th Dec 20233:38 pmRNSResults of AGM
14th Dec 20237:00 amRNSCEO Appointment
14th Dec 20237:00 amRNSFunding Update - Subscription Facility
27th Nov 20235:00 pmRNSPosting of Annual Report and Notice of AGM
7th Nov 20237:00 amRNSInvestor Presentation
2nd Oct 20235:33 pmRNSIssue of Equity
29th Sep 20237:00 amRNSInterim Results
3rd Jul 20237:00 amRNSFunding update - subscription facility
3rd Jul 20237:00 amRNSAnnual Results
28th Feb 20234:35 pmRNSPrice Monitoring Extension
30th Jan 20234:40 pmRNSSecond Price Monitoring Extn
30th Jan 20234:35 pmRNSPrice Monitoring Extension
16th Dec 20224:37 pmRNSNotification of Major Holdings
16th Dec 202210:31 amRNSAcquisition, Admission & Board Appointments
13th Dec 202211:45 amRNSResults of General Meeting and Board Appointments
25th Nov 20224:36 pmRNSNotice of GM
25th Nov 20227:00 amRNSResults of AGM
23rd Nov 20227:00 amRNSAcquisition of 100% of Zanaga Iron Ore Project
4th Nov 20225:41 pmRNSNotice of Annual General Meeting
30th Sep 20221:00 pmRNSInterim Results
5th Sep 20224:40 pmRNSSecond Price Monitoring Extn
5th Sep 20224:35 pmRNSPrice Monitoring Extension
1st Jul 20227:00 amRNSAnnual Results
29th Apr 20224:40 pmRNSSecond Price Monitoring Extn
29th Apr 20224:35 pmRNSPrice Monitoring Extension
3rd Mar 20224:40 pmRNSSecond Price Monitoring Extn
3rd Mar 20224:36 pmRNSPrice Monitoring Extension
7th Jan 20224:41 pmRNSSecond Price Monitoring Extn
7th Jan 20224:35 pmRNSPrice Monitoring Extension
20th Dec 20213:13 pmRNSResult of AGM
8th Dec 20214:36 pmRNSPrice Monitoring Extension
25th Nov 20217:00 amRNSPosting of Annual Report and Notice of AGM
21st Oct 20214:40 pmRNSSecond Price Monitoring Extn
21st Oct 20214:36 pmRNSPrice Monitoring Extension
28th Sep 20217:00 amRNSINTERIM RESULTS
27th Sep 20214:41 pmRNSSecond Price Monitoring Extn
27th Sep 20214:35 pmRNSPrice Monitoring Extension
16th Sep 202112:11 pmRNSSecond Price Monitoring Extn
16th Sep 202112:10 pmRNSPrice Monitoring Extension
15th Sep 20214:41 pmRNSSecond Price Monitoring Extn
15th Sep 20214:36 pmRNSPrice Monitoring Extension
11th Aug 20214:40 pmRNSSecond Price Monitoring Extn
11th Aug 20214:35 pmRNSPrice Monitoring Extension
7th Jul 20214:40 pmRNSSecond Price Monitoring Extn
7th Jul 20214:35 pmRNSPrice Monitoring Extension
30th Jun 20217:00 amRNSAnnual Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.