Chris Heminway, Exec-Chair at Time To ACT, explains why now is the right time for the Group to IPO. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksVOG.L Regulatory News (VOG)

  • There is currently no data for VOG

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Ministerial Approval on Matanda Licence Extension

23 Dec 2021 07:00

RNS Number : 5554W
Victoria Oil & Gas PLC
23 December 2021
 

 

23 December 2021

Victoria Oil & Gas Plc

 

("VOG" or "the Company")

 

Ministerial Approval on Matanda Licence Extension Received

 

Victoria Oil & Gas Plc, the Cameroon based gas and condensate producer and distributor, is pleased to announce that its wholly owned subsidiary Gaz du Cameroun S.A. ("GDC") has received, as operator, approval from the Minister of Mines, Industry and Technological Development for the extension of the Matanda Block licence.

 

The exploration phase of the licence has been extended by one year from 17 December 2021. This has been approved by the Minister and the associated Arrêté (Decree) has been received.

 

GDC was assigned 75% ownership and became operator of the Matanda PSC in December 2018 with Afex Global Limited ("AFEX") holding the remaining 25%. Société Nationale Des Hydrocarbures ("SNH") has a 25% back in right after an Exploitation License is granted. The 1,235 square kilometre block Matanda Block is adjacent to GDC's Logbaba concession and offers several monetisation options for gas discoveries.

 

The Company's estimate of Prospective Resources remains unchanged from those previously reported, namely 1,196 Bcf in the Matanda Licence (onshore), the onshore being the area of initial focus.

 

The results of a rigorous prospect evaluation, including significant weighting on ESG elements of the site and operation, led to the selection of the Marula prospect for the first well, the largest of the onshore, Tertiary-aged prospects with internally estimated unrisked Pmean Prospective Resource of 69 Bcf, and better than 40% geological chance of success.

 

Using the Environmental and Social Impact Assessment ("ESIA"), coupled with the addition of ESG issues to the prospect evaluation table, resulted in a well location that is on Government-owned, late life plantation land, and over 3km km from any dwellings. The site is also away from areas of vulnerable Mangrove forestation which conservationists are working hard to protect in the coastal areas on the Matanda Block.

 

At the date of this release, many of the long lead items have been ordered and a short list of eight suitable rigs has been drawn up and an Invitation to Tender issued with bids due early next year. The total drilled depth ("TD") of the first well will be less than 1,300m, and it will be vertical, so a trailer-mounted rig of modest power (1,000 HP) will suffice. As there are no other onshore drilling operations in Cameroon, the rig will need to be sourced from overseas. The current schedule shows a Q2 2022 spud date, subject to finalisation of the costings and the necessary funding being available.

 

 

 

Commenting today Roy Kelly, CEO of VOG, said:

"We are extremely pleased to have received this extension for another year and, once again, we thank the Minister and SNH for expediting this extension. The first well will be in the highly prospective onshore area where nearby wells in a similar play (in the contiguous Bomono license) underwent extended well tests and have significantly derisked these shallower plays. I am particularly pleased with the role played by our ESG team in influencing the selection of well location mindful of human and natural habitats around the wellsite.

 

We face our usual challenge of mobilising land drilling equipment into the country, but most of the rigs on our shortlist are in the region."

 

For further information, please visit www.victoriaoilandgas.com  or contact:

 

Victoria Oil & Gas Plc

Roy Kelly/Rob Collins Tel: +44 (0) 20 7921 8820

 

Strand Hanson Limited (NOMAD)

Rory Murphy/James Dance Tel: +44 (0) 20 7409 3494

 

Shore Capital Stockbrokers Limited (Broker)

Mark Percy / Toby Gibbs (corporate advisory) Tel: +44 (0) 207 408 4090

Sam Metcalfe, the Company's Subsurface Manager has reviewed and approved the technical information contained in this announcement in his capacity as a qualified person under the AIM Rules. Sam, who has an MSc in Petroleum Engineering from The University of Texas at Austin, has over 35 years of industry experience.

 

Background on Matanda

 

The Matanda Block is situated in the northern part of the Douala Basin, in the transitional zone around the Wouri estuary and the neighbouring onshore area to the south-west of the city of Douala. The block borders GDC's Logbaba concession at the southern boundary. Approximately 30% of the block is in shallow water, whilst the remainder is onshore.

 

The North Matanda Field was originally discovered by Gulf Oil Corporation in 1980, and to date three wells drilled in the shallow water of the Wourri Estuary on the block tested gas and condensate from the Logbaba Forma on of the North Matanda Field. One onshore well, Missellelle-1, also encountered gas reservoirs in the Logbaba Forma on. During 2008 to 2010, Glencore and AFEX acquired 200 square kilometres of 3D seismic survey over the North Matanda Field and 150 kilometres of 2D seismic survey over the northern, onshore por on of the block. In May 2013, Glencore spudded well NM-3x, an appraisal well into the North Matanda Field to further define and delineate the Cretaceous reservoirs.

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCMZMZZLZMGMZM
Date   Source Headline
20th Nov 20157:00 amRNSDirectorate Change
16th Nov 20157:00 amRNSAdditional Listing
10th Nov 20157:00 amRNSChange of Accounting Reference Date
5th Nov 20157:00 amRNSQ3 2015 Operations Update
4th Nov 20158:00 amRNSPosting of 2015 Annual Report
28th Oct 20157:00 amRNSAppointment of Director
18th Sep 20157:00 amRNSEnergy Company of the Year Award
23rd Jul 20157:00 amRNSQ2 2015 Operations Update
20th Jul 201511:03 amRNSInstallation Film on Genset Connections
11th Jun 20157:00 amRNSAdditional Listing
8th Jun 20157:00 amRNSNew Thermal Gas Connections and Production Update
27th May 20157:00 amRNSGas Plant Purchase from Expro, Cameroon
23rd Apr 20157:00 amRNSLogbaba Power Station Online & Production Increase
17th Apr 20155:36 pmRNSProduction Update
14th Apr 201512:30 pmRNSUK Investor Show Attendance, London
23rd Mar 20157:00 amRNSBassa Power Station Online
9th Mar 20157:00 amRNSGDC-ENEO Pipeline Installation and Genset Update
27th Feb 20153:03 pmRNSInterim Results
2nd Feb 20157:00 amRNSGas in Pipeline Pressurised to ENEO Power Stations
19th Jan 20157:00 amRNSENEO Pipeline Completed
8th Jan 20157:00 amRNSBalance of Cash Call Received from RSM
29th Dec 20147:00 amRNSMajor Gas Sales Agreement Signed
11th Dec 20147:45 amRNSDeloitte Report & $10.1m Cash Call
8th Dec 20147:00 amRNSCompletion of Bonaberi Gas Connections
1st Dec 20147:00 amRNSChange of Broker
1st Dec 20147:00 amRNSDirectorate Change
26th Nov 20141:58 pmRNSResult of AGM
7th Nov 20147:00 amRNSWouri River Pipeline Passes Pressure Tests
3rd Nov 20147:00 amRNSPosting of Annual Report and Shareholder Circular
29th Oct 20147:00 amRNSWouri River Pipe Laid to Bonaberi Shore
23rd Oct 20147:00 amRNSFinal Results
23rd Oct 20147:00 amRNSProposed Capital Reorganisation & Notice of AGM
22nd Oct 20147:00 amRNSAppointment of Broker
20th Oct 20147:00 amRNSRSM Settlement Update
6th Oct 20147:00 amRNSHolding(s) in Company
23rd Sep 20147:00 amRNSWouri River Crossing Update
1st Aug 20147:00 amRNSBonaberi Gas Supply Update
9th Jul 20147:00 amRNSGas Supply & Operations Update, Cameroon
12th Jun 20147:00 amRNSGenset Connections and Thermal Update
4th Jun 20147:00 amRNSGensets Installed and Connected
2nd Jun 20147:00 amRNSDirectorate Change
4th Apr 20147:00 amRNSLogbaba Project Update, Cameroon
1st Apr 20147:00 amRNSUK Investor Show
31st Mar 20144:41 pmRNSSecond Price Monitoring Extn
31st Mar 20144:35 pmRNSPrice Monitoring Extension
17th Mar 20147:00 amRNSDirector Dealing
28th Feb 20149:24 amRNS"On the Ground in Douala" - Operations Film
28th Feb 20147:01 amRNSInterim Results
21st Feb 20147:00 amRNSOperational Break-even Achieved, Cameroon
4th Feb 20147:00 amRNSSOCAVER Thermal Gas Online

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.