GDC-ENEO Pipeline Installation and Genset Update

9 Mar 2015 07:00

RNS Number : 8481G
Victoria Oil & Gas PLC
09 March 2015
 

 

Victoria Oil & Gas PLC (AIM: VOG)

9 March 2015

 

Victoria Oil & Gas Plc

("VOG" or "the Company")

GDC-ENEO Pipeline Installation and Genset Update, Cameroon

 

· Gaz du Cameroun completes all pipeline and metering installation to Bassa and Logbaba power plants ahead of schedule, meeting all contractual obligations

· Pipeline now "gassed up" and completion certificates issued

· Twenty two Gensets with a combined capacity of 28.6MW arrived at Douala port and cleared customs - sixteen of these (20.8 MW) now onsite at Bassa power station and six (7.8MW) at Logbaba power station

· Seventeen Gensets (22.1 MW) scheduled to arrive in Douala on March 15 2015

· Target date for commissioning of both plants (50MW) remains end March 2015

 

Victoria Oil & Gas Plc announces that Gaz du Cameroun S.A. ("GDC"), its wholly owned subsidiary, has issued completion certificates to ENEO Cameroon S.A. ("ENEO"), Cameroon's power utility company, for all pipeline construction work and pressure reduction and metering stations ("PRMS") at both the Logbaba and Bassa power stations located in the port-city of Douala, Cameroon.

 

The work has been completed ahead of the scheduled 15 March 2015 target date and GDC is ready to connect to the gas-fired electricity generations sets ("Gensets") that are being installed by equipment partner, Altaaqa Alternative Solutions Projects DWC-LLC ("Altaaqa").

 

Approximately 1.4km of 400mm diameter pipeline was connected from the Magzi - Bassa valve station, of which 1.3km was open trenching and 100m horizontal directional drilling. Traffic management was the most challenging aspect of this work as the Logbaba road forms part of the main arterial route from Logbaba into the city of Douala. The two PRMS units, each weighing 5 tonnes, were supplied, assembled and tested by ELSTER UK, while all special components and instrumentation were engineered from ELSTER Germany.

 

The pipeline pressure tests, consisting of hydrostatic tests (10.5 bar for 2 hours) and pneumatic tests (7 bar for 5 days) were successfully completed and certified by Veritas. The pipeline is now "gassed up" and ready for delivery of gas. The completion of these milestones confirms that GDC has met all of its contractual responsibilities under the Construction Term Sheet signed by GDC and ENEO on 29 December 2014.

 

Twenty two Gensets with a combined net capacity of 28.6MW for the project have arrived and been cleared through Cameroon Customs by Altaaqa and ENEO at Douala Port. Sixteen of these Gensets (20.8 MW) are now onsite at the Bassa power station and six units (7.8 MW) at the Logbaba power station for installation by Altaaqa. The remaining seventeen Gensets (22.1 MW), are scheduled to arrive in Douala on 15 March 2015 and will be installed at Logbaba station. Target completion date for installation and commissioning of the total 50MW remains the end of March 2015.

 

Kevin Foo, Executive Chairman, said: "I am very pleased to announce GDC has completed construction of the gas pipelines and metering plant to the Logbaba and Bassa Power Stations, ahead of schedule. This is a significant milestone for us and represents the final step prior to actual delivery of gas to the power stations. I thank every member of our team who contributed to this effort. We look forward to the installation of the Gensets by Altaaqa and being online by the end of the month."

 

For further information, please visit www.victoriaoilandgas.com or contact: 

Victoria Oil & Gas Plc

Kevin Foo / Laurence Read Tel: +44 (0) 20 7921 8820

 

Numis Securities

John Prior / Ben Stoop Tel: +44 (0) 207 260 1000 

Strand Hanson Limited

Angela Hallett / Stuart Faulkner Tel: +44 (0) 20 7409 3494

 

Tavistock Communications

Jos Simson / Edward Portman/ Nuala Gallagher Tel: +44 (0) 20 7920 3150

 

Notes to Editors

 

About Victoria Oil & Gas Plc

Victoria Oil & Gas (VOG.L) is a gas utility company with operations in the industrial port city of Douala in Cameroon, which is the business hub to Central Africa.

 

The Company's subsidiary, Gaz du Cameroun S.A. ("GDC"), supplies cost effective, clean and reliable gas to industries in the Douala region from its onshore Logbaba Gas Project. Industrial customers are primarily supplied with gas through a 31.3km pipeline network built by GDC in Douala. GDC products currently include thermal gas, gas condensate and gas for electricity generation. GDC gas is attractive to customers due to its reliability, price competitiveness, low hydrocarbon emissions (compared to Heavy Fuel Oil) and adaptability to meet varied power requirement needs.

 

The Company generates cash flow from the Logbaba Project which is 60% owned and managed by GDC, with RSM Production Corporation, an affiliate of Grynberg Petroleum Company of Denver, Colorado holding a 40% participating interest.

 

VOG also holds 100% of the West Medvezhye oil and gas exploration project near Nadym, Russia. The field has C1 plus C2 reserves of 14.4mmboe (under the Russian resource classification system, analogous to proven and probable reserves under Western conventions) in addition to best estimate prospective resources of 1.4bboe.

 

Cameroon Energy Market

Cameroon is a stable African country that is host to a developing economy serving most of Central Africa with goods and services. A power deficit remains a major hindrance to Cameroon's economic expansion. The power grid is reliant on hydroelectric dams to supply 75% of power and the shortfall is made up from heavy fuel oil and gas. Hydroelectric dams are highly seasonal, with stream rates significantly varying from 6,000m3 per second in the wet season to 50m3 per second in the dry season. As with many hydro electrical systems transmission loss is also a constant issue when balancing power loads across distances to different consuming regions. The port-city of Douala is the major industrial zone within Cameroon and it requires high levels of consistently delivered grid power all year round. Currently Cameroon's energy demand is growing at 7% annually and gas is seen as a key element to Cameroons national energy strategy.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLDBGDXXUGBGUI
Date   Source Headline
16th Dec 20227:00 amRNSCancellation - Victoria Oil & Gas Plc
27th Oct 20225:30 pmRNSSuspended Companies Notice – Deletions
26th Oct 20227:00 amRNSUpdate on Settlement of The ICC Award to RSM
5th Oct 20229:15 amRNSOperational & Corporate Update
25th Jul 20227:30 amRNSAddendum to ICC Partial Final Award
22nd Jul 20227:00 amRNSQ2 2022 Operational & Corporate Update
30th Jun 20221:45 pmRNSResult of Annual General Meeting
30th Jun 20227:00 amRNSAnnual Report and Accounts & Trading Update
27th Jun 20227:00 amRNSChange of Registered Office
14th Jun 20229:45 amRNSHolding(s) in Company
14th Jun 20229:45 amRNSHolding(s) in Company
31st May 20226:00 pmRNSNotice of AGM
19th May 20227:00 amRNSQ1 2022 Operational & Corporate Update
4th Apr 20227:30 amRNSSuspension - Victoria Oil & Gas plc
4th Apr 20227:00 amRNSTemporary Suspension of Trading
2nd Mar 20227:00 amRNSLoan Note Issue
2nd Feb 20227:00 amRNSQ4 2021 Operational Update
18th Jan 20222:05 pmRNSSecond Price Monitoring Extn
18th Jan 20222:00 pmRNSPrice Monitoring Extension
7th Jan 20222:06 pmRNSSecond Price Monitoring Extn
7th Jan 20222:01 pmRNSPrice Monitoring Extension
7th Jan 202211:06 amRNSSecond Price Monitoring Extn
7th Jan 202211:00 amRNSPrice Monitoring Extension
23rd Dec 20217:00 amRNSMinisterial Approval on Matanda Licence Extension
16th Nov 20214:41 pmRNSSecond Price Monitoring Extn
16th Nov 20214:36 pmRNSPrice Monitoring Extension
16th Nov 20212:05 pmRNSSecond Price Monitoring Extn
16th Nov 20212:00 pmRNSPrice Monitoring Extension
16th Nov 202111:05 amRNSSecond Price Monitoring Extn
16th Nov 202111:00 amRNSPrice Monitoring Extension
16th Nov 20217:00 amRNSUpdate to Logbaba well La-108
1st Nov 20218:42 amRNSReplacement: Interim Results
1st Nov 20217:00 amRNSAnnual Financial Report
1st Oct 202112:00 pmRNSConvertible Loan Note Draw Down
29th Sep 20217:00 amRNSUNCITRAL Arbitration Update
23rd Sep 20212:15 pmRNSInterim Results Extension
10th Sep 20213:22 pmRNSResult of General Meeting
26th Aug 20217:00 amRNSPublication of Circular and Notice of GM
12th Aug 202112:28 pmRNSResult of General Meeting (“GM”)
4th Aug 20217:00 amRNSQ2 2021 Operational Update
16th Jul 20211:02 pmRNSGrant of Options, Issue of Shares and TVR
16th Jul 20217:00 amRNSNotice of General Meeting to receive Annual Report
13th Jul 20212:06 pmRNSSecond Price Monitoring Extn
13th Jul 20212:00 pmRNSPrice Monitoring Extension
13th Jul 202111:05 amRNSSecond Price Monitoring Extn
13th Jul 202111:00 amRNSPrice Monitoring Extension
13th Jul 20217:00 amRNSAudited Results for the year ended 31 Dec 2020
30th Jun 20211:38 pmRNSResult of Annual General Meeting
30th Jun 20217:20 amRNSAnnual Report and Accounts & Trading update
24th Jun 202111:13 amRNSAnnual General Meeting 2021 Update on Arrangements

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.