Logbaba Field Reserves Update

4 Jun 2018 07:00

RNS Number : 1126Q
Victoria Oil & Gas PLC
04 June 2018
 

 

 

 

Victoria Oil & Gas PLC (AIM: VOG) 

4 June 2018

 

 

Victoria Oil & Gas Plc

("VOG" or "the Company")

 

Logbaba Field Reserves Update

 

Victoria Oil & Gas Plc, the Cameroon based gas and condensate producer and distributor, is pleased to provide the following update, based on internal estimates, on the reserves position for the Logbaba Field in Cameroon. This follows evaluation of the results obtained from seismic reprocessing, incorporation of the production history from existing wells and completion of the 2017 development drilling campaign to deliver Logbaba La-107 and La-108.

 

Highlights

 

· Subsurface reinterpretation complete and new subsurface model developed integrating re-processed seismic and new well data with historic field mapping

· Proved reserves (1P) defined by connected volumes to all the wells drilled into Logbaba revised to 69bcf, an increase of 29bcf (73%)

· Field remaining 2P reserves revised to 309bcf, an increase of 106bcf (52%)

· Reserves / production ratio (2P) increased to 10yrs at 90mmscfd which supports growth in the Douala market and will underpin new long-term gas contracts

· Full field reservoir development plan in preparation to locate future development wells

 

Kevin Foo, VOG Chairman said, "The results of this reserves update are a major advance to our business in Cameroon. They provide a significant value upgrade to the Logbaba Project and confirm that the field reserves will meet the growing demand in the Douala market for the foreseeable future. Importantly, this will now enable us to market larger volumes of natural gas on a longer term contractual basis to buyers, providing them with the security of supply they require. We are actively negotiating Gas Sales Agreements for these projects and we will provide updates when appropriate."

 

 

 

A full subsurface reinterpretation of the Logbaba Field has been completed following conclusion of the 2017 drilling campaign. This incorporates the reprocessed historic seismic data and the new well data as a basis for ongoing reservoir development. This leads to a material upgrade in the reserves of the Logbaba Field, Table 1.

 

 

Basis

Field Position at 1/1/17

Field Position at 1/1/18

 

Initial Reserves

Cum Prod'n

Remaining reserves

Initial Reserves

Cum Prod'n

Remaining Reserves

VOG Net Reserves

Proved (1P)

49

9

40

82

13

69

40

Proved+ Probable (2P)

212

9

203

322

13

309

176

Proved+ Probable+ Possible (3P)

350

9

341

548

13

535

305

 

 

 

 

 

 

 

 

All volumes are bcf and do not include condensate volumes

Position at 1/1/17 based on Blackwatch report from August 2016

Position at 1/1/18 based on integrated reservoir study post La-107 and La-108 development drilling

Table 1 - Logbaba field reserves update

 

The new proven + probable (2P) reserves level will support a production rate of 90mmscfd for 10 years; thereby enabling significant expansion of the business in support of the growing domestic gas market in Cameroon.

 

This evaluation supersedes the Blackwatch Report of August 2016 and is based on a new full field subsurface model incorporating interpretations from the reprocessed seismic together with the well data from La-107 and La-108. The work has been managed by VOG supported by external consultants who have provided subsurface expertise and modelling capability to produce the updated development plan for the field. This work will now enable selection of locations for future development wells, commencing with La-109, to continue development of the Logbaba Field in line with demand growth in Douala, Cameroon.

 

Sam Metcalfe, the Company's Subsurface Manager has reviewed and approved the technical information contained in this announcement in his capacity as a qualified person under the AIM Rules.

 

This announcement contains inside information.

 

For further information, please visit www.victoriaoilandgas.com or contact:

 

Victoria Oil & Gas Plc

Kevin Foo / Ahmet Dik Tel: +44 (0) 20 7921 8820

 

Strand Hanson Limited (Nominated and Financial Adviser)

Rory Murphy / Angela Hallett / Ritchie Balmer Tel: +44 (0) 20 7409 3494

 

Shore Capital Stockbrokers Limited (Joint Broker)

Mark Percy / Toby Gibbs (corporate finance) Tel: +44 (0) 20 7408 4090

Jerry Keen (corporate broking)

 

FirstEnergy Capital LLP (Joint Broker)

Jonathan Wright / David van Erp Tel: +44 (0) 20 7448 0200

 

Camarco (Financial PR)

Billy Clegg Tel: +44 (0) 20 3757 4983

Nick Hennis Tel: +44 (0) 20 3781 8330

 

 

NOTES TO EDITORS:

 

Victoria Oil & Gas Plc ("VOG" or "the Company") is a fully-integrated onshore gas producer and distributor with operations located in the port city of Douala, Cameroon. Through the Company's wholly-owned subsidiary, Gaz du Cameroun S.A. ("GDC"), VOG delivers gas via a 50km gas distribution pipeline network to a range of major industrial customers. 

 

Since spudding its first wells in 2010, the Company has grown to become the dominant player in the Cameroon onshore gas market, primarily through the 57% owned Logbaba gas project. GDC is partnered on this project with RSM Production Company ("RSM"), and Société Nationale des Hydrocarbures ("SNH"), who have holdings of 38% and 5% respectively.

 

Subject to government approval VOG will extend it acreage over the highly prospective Douala Basin with the addition of the Matanda license area.

 

Victoria Oil & Gas is listed on the AIM market of the London Stock Exchange under the ticker VOG.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLDMGGVNFDGRZM
Date   Source Headline
20th Nov 20157:00 amRNSDirectorate Change
16th Nov 20157:00 amRNSAdditional Listing
10th Nov 20157:00 amRNSChange of Accounting Reference Date
5th Nov 20157:00 amRNSQ3 2015 Operations Update
4th Nov 20158:00 amRNSPosting of 2015 Annual Report
28th Oct 20157:00 amRNSAppointment of Director
18th Sep 20157:00 amRNSEnergy Company of the Year Award
23rd Jul 20157:00 amRNSQ2 2015 Operations Update
20th Jul 201511:03 amRNSInstallation Film on Genset Connections
11th Jun 20157:00 amRNSAdditional Listing
8th Jun 20157:00 amRNSNew Thermal Gas Connections and Production Update
27th May 20157:00 amRNSGas Plant Purchase from Expro, Cameroon
23rd Apr 20157:00 amRNSLogbaba Power Station Online & Production Increase
17th Apr 20155:36 pmRNSProduction Update
14th Apr 201512:30 pmRNSUK Investor Show Attendance, London
23rd Mar 20157:00 amRNSBassa Power Station Online
9th Mar 20157:00 amRNSGDC-ENEO Pipeline Installation and Genset Update
27th Feb 20153:03 pmRNSInterim Results
2nd Feb 20157:00 amRNSGas in Pipeline Pressurised to ENEO Power Stations
19th Jan 20157:00 amRNSENEO Pipeline Completed
8th Jan 20157:00 amRNSBalance of Cash Call Received from RSM
29th Dec 20147:00 amRNSMajor Gas Sales Agreement Signed
11th Dec 20147:45 amRNSDeloitte Report & $10.1m Cash Call
8th Dec 20147:00 amRNSCompletion of Bonaberi Gas Connections
1st Dec 20147:00 amRNSChange of Broker
1st Dec 20147:00 amRNSDirectorate Change
26th Nov 20141:58 pmRNSResult of AGM
7th Nov 20147:00 amRNSWouri River Pipeline Passes Pressure Tests
3rd Nov 20147:00 amRNSPosting of Annual Report and Shareholder Circular
29th Oct 20147:00 amRNSWouri River Pipe Laid to Bonaberi Shore
23rd Oct 20147:00 amRNSFinal Results
23rd Oct 20147:00 amRNSProposed Capital Reorganisation & Notice of AGM
22nd Oct 20147:00 amRNSAppointment of Broker
20th Oct 20147:00 amRNSRSM Settlement Update
6th Oct 20147:00 amRNSHolding(s) in Company
23rd Sep 20147:00 amRNSWouri River Crossing Update
1st Aug 20147:00 amRNSBonaberi Gas Supply Update
9th Jul 20147:00 amRNSGas Supply & Operations Update, Cameroon
12th Jun 20147:00 amRNSGenset Connections and Thermal Update
4th Jun 20147:00 amRNSGensets Installed and Connected
2nd Jun 20147:00 amRNSDirectorate Change
4th Apr 20147:00 amRNSLogbaba Project Update, Cameroon
1st Apr 20147:00 amRNSUK Investor Show
31st Mar 20144:41 pmRNSSecond Price Monitoring Extn
31st Mar 20144:35 pmRNSPrice Monitoring Extension
17th Mar 20147:00 amRNSDirector Dealing
28th Feb 20149:24 amRNS"On the Ground in Douala" - Operations Film
28th Feb 20147:01 amRNSInterim Results
21st Feb 20147:00 amRNSOperational Break-even Achieved, Cameroon
4th Feb 20147:00 amRNSSOCAVER Thermal Gas Online

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.