The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksVOG.L Regulatory News (VOG)

  • There is currently no data for VOG

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Logbaba Drilling Update

28 Jun 2017 07:00

RNS Number : 3538J
Victoria Oil & Gas PLC
28 June 2017
 

 

 

 

28 June 2017

Victoria Oil & Gas Plc

Logbaba Drilling Update

 

Victoria Oil & Gas Plc ("VOG" or "the Company") is pleased to provide an update on the two well drilling programme at the Company's Logbaba gas production site, located in the industrial port city of Douala, Cameroon.

 

Highlights

· Net sands encountered so far of 100m in La-108 and 35m in La-107 have exceeded expectations

· Drilling to continue and is expected to increase net pays of both wells

· 300m high-pressure flowline from the La-107 well head to the gas processing plant has been installed

· Flow testing and production from La-107 is expected in Q3 2017

 

The programme consists of well La-107, a twin of La-104, which was originally drilled in 1957; and a step out development well, La-108, both of which will be production wells.

 

In well La-108, approximately 100m of net gas-bearing sands have been encountered between the top of the Logbaba Formation at 1,670m TVD (true vertical depth) and 2,702m TVD. La-108 has 9⅝" casing set to 1,597m TVD. The La-108 8½" side-track was deferred until an in-depth engineering review of the plan was completed and the rig was therefore skidded to drill well La-107. The La-108 side-track plan is now ready to implement.

 

On La-107, the 8½" hole section has been drilled to 2,445m TVD, wireline logs have been run and the 7" production liner has been run and cemented at 2,426m TVD. Well logs to this depth so far indicate net 35m of high permeability, high porosity gas bearing sands in the Upper Logbaba Formation.

 

Drilling on La-107 will continue, with a 6" hole targeting the base of the Lower Logbaba sands. On reaching this target, the well will be logged prior to running a 4½" liner, and, when completed can be put directly into production. A 300m high-pressure flowline from the well head to the gas processing plant has been installed. Production from La-107 is expected in Q3 2017.

 

It is then planned to skid the rig back to sidetrack and complete well La-108.

 

Net sands encountered so far of 100m in La-108 and 35m in La-107 have exceeded expectations and compare favourably to net sands of 54m encountered in primary production well La-105.

 

Planned completion of both wells is now in Q3 2017. The Company anticipates that GDC's share of well costs will be covered by cash generation and existing credit facilities.

 

The Company, which is the only gas producer in the Douala region believes there is current demand for 150 mmscf per day in Douala.

 

 

Ahmet Dik, CEO, said; "Our success so far on La-107 in securing 35m of gas-bearing reservoir sands in the Upper Logbaba is very positive news. We shall continue drilling and completion work on La-107 through to production, before moving back to drilling and completing La-108.

 

The net sands encountered so far of 135m in both wells is very encouraging, especially when compared to the 54m of net sands encountered in our primary production well La-105, so our focus is getting all gas "behind pipe" and into production within Q3.

 

This is a challenging drilling program, with two deep, high-pressure, high-temperature wells that have been slow and expensive to drill. Our drilling team have worked tirelessly to drill below 2,000m, a depth where only a handful of wells have been successfully drilled in the Douala Basin."

 

This announcement contains inside information.

 

For further information, please visit www.victoriaoilandgas.com or contact: 

 

Victoria Oil & Gas Plc

Kevin Foo/Ahmet Dik/Laurence Read Tel: +44 (0) 20 7921 8820

 

Strand Hanson Limited

Rory Murphy/Stuart Faulkner/James Dance Tel: +44 (0) 20 7409 3494

 

Shore Capital Stockbrokers Limited (Joint Broker)

Mark Percy/Toby Gibbs (corporate finance) Tel: +44 (0) 20 7408 4090

Jerry Keen (corporate broking)

 

FirstEnergy Capital LLP (Joint Broker)

Jonathan Wright/David van Erp Tel: +44 (0) 20 7448 0200

 

Camarco

Billy Clegg/Nick Hennis Tel: +44 (0) 20 3757 4983

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLUBUWRBWANUAR
Date   Source Headline
24th Jan 20147:00 amRNSRSM Settlement and US$16.3m Received
17th Jan 20147:00 amRNSLoan and Customs bond with BGFIBank
13th Jan 20147:00 amRNSRSM Default
10th Jan 20144:40 pmRNSSecond Price Monitoring Extn
10th Jan 20144:35 pmRNSPrice Monitoring Extension
8th Jan 20147:00 amRNSCommercial Developments, Gaz du Cameroun
19th Dec 20137:00 amRNSPresidential Visit Video
13th Dec 20138:45 amRNSRestoration of Trading on AIM
13th Dec 20138:45 amRNSRestoration - Victoria Oil & Gas Plc
13th Dec 20137:00 amRNSRSM vs VOG and RDL Arbitration
12th Dec 20134:16 pmRNSICC International Court of Arbitration Award
12th Dec 20133:52 pmRNSSuspension - Victoria Oil & Gas plc
2nd Dec 20139:36 amRNSUpdate re Arbitration
27th Nov 20132:35 pmRNSResult of AGM
19th Nov 20138:22 amRNSPresidential Visit & Gas Launch
8th Nov 20137:00 amRNSAdditional Customer Online
1st Nov 20137:16 amRNSUpdate re: RSM Arbitration
25th Oct 20137:00 amRNSFinal Results
10th Oct 20137:00 amRNSTrading and Operations Update
2nd Oct 201310:45 amRNSHolding(s) in Company
1st Oct 20133:10 pmRNSShare Price Movement
30th Sep 20137:00 amRNSDirectorate Change
27th Sep 20134:40 pmRNSSecond Price Monitoring Extn
27th Sep 20134:35 pmRNSPrice Monitoring Extension
21st Aug 20134:40 pmRNSSecond Price Monitoring Extn
21st Aug 20134:35 pmRNSPrice Monitoring Extension
18th Jul 20137:00 amRNSChief Executive Officer's Letter to Shareholders
3rd Apr 201311:38 amRNSHolding(s) in Company
6th Mar 20135:46 pmRNSHolding(s) in Company
6th Mar 20139:00 amRNSHolding(s) in Company
1st Mar 20132:00 pmRNSResult of General Meeting
28th Feb 20137:00 amRNSInterim Results
27th Feb 20137:00 amRNSAppointment of Renaissance Capital
26th Feb 20133:57 pmRNSStatement: re RSM Production Corporation
26th Feb 20137:00 amRNSAppointment of New Chief Executive Officer
13th Feb 20137:00 amRNSHolding(s) in Company
12th Feb 201310:59 amRNSHolding(s) in Company
12th Feb 201310:59 amRNSHolding(s) in Company
11th Feb 20133:52 pmRNSHolding(s) in Company
11th Feb 20132:00 pmRNSNotice of GM & Investor Presentation
6th Feb 20131:25 pmRNSResignation of broker
6th Feb 20137:00 amRNSIssue of Equity
30th Jan 20137:00 amRNSOperations Update & Societe Generale Commitment
21st Dec 20127:00 amRNSOperational Update and Additional Listing
18th Dec 20124:40 pmRNSSecond Price Monitoring Extn
18th Dec 20124:35 pmRNSPrice Monitoring Extension
30th Nov 20127:00 amRNSResult of AGM and Operational Update
14th Nov 20127:00 amRNSGas Market Study on Logbaba
6th Nov 20124:40 pmRNSSecond Price Monitoring Extn
6th Nov 20124:35 pmRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.