Less Ads, More Data, More Tools Register for FREE

Pin to quick picksVGAS.L Regulatory News (VGAS)

  • There is currently no data for VGAS

Operational Update

4 Nov 2010 07:00

RNS Number : 5848V
Volga Gas PLC
04 November 2010
 



4 November 2010

VOLGA GAS PLC

 

OPERATIONAL UPDATE

 

Volga Gas Plc ("Volga Gas" or the "Company"), the oil and gas exploration and production group operating in the Volga Region of European Russia, is pleased to provide an update on current activities and to preview the planned work programme and capital budget for 2011.

 

·; Production in Q3 2010 averaged 1,376 bopd (Q2 2010: 832 bopd, Q3 2009: 1,693 bopd).

·; Oil sales price in Q3 2010 was $32.19 per barrel (Q2 2010: $31.09; Q3 2009: $29.98).

·; Successful extended well tests on Vostochny Makarovskoye.

·; Three exploration wells and one new development well planned for 2011-2012

·; Firm capital expenditure budget of $8.5 million for 2011.

·; US$25.4 million in cash at 1 November 2010.

 

Uzenskoye field (supra-salt Karpenskiy)

Oil production from the Uzenskoye field during Q3 2010, averaged 1,376 bopd, reflecting a sustainable and steady rate of production from four wells. Production in Q2 2010 (832 bopd on average) was impacted by abnormal weather-related disruptions - heavy snow followed by a rapid thaw made the roads unusable preventing regular oil transportation from the wellsite. In Q3 2009, the production (1,693 bopd on average) was from 5 wells; one of these wells has been taken off production for future workover and conversion into a water injector.

 

The Uzenskoye field continues to produce under natural flow and with negligible water cut. The production rates seen in Q3 2010 have been maintained throughout October.

 

The short term development plans for the field include one new development well, Uzen #11, which is planned to be drilled into a currently non-producing portion of the reservoir. It is expected to be drilled and completed during H1 2011. In addition there will be further investment in upgrading in-field roads.

 

Volga Gas continued to benefit from increasing oil sales realisations. The sales price reported of US$32.19 per barrel (net of VAT) is a netback price at the field facilities. Since the end of Q3 2010, prices have continued to increase modestly.

 

Vostochny Makarovskoye

Extended test production has been carried out on the two completed wells, VM#1 and VM#2, at the Vostochny Makarovskoye field. The wells were flowed with varying chokes to gather well pressure data and to enable an optimal production management plan for the field when it commences full time production. The response of the field under the testing programme is in line with our expectations.

 

During the testing, condensate was separated and collected for sale while the gas produced was flared. The cash flow from condensate sales offset the costs of the testing programme and provides a modest surplus.

 

On 24 August 2010, Volga Gas announced that a court order had been awarded against Trans Nafta for the payment of a sum of RUR 640 million (US$21 million). The sum relates to the down payment made by Volga Gas in 2008 for a proposed acquisition of a 75% interest in a gas plant being constructed by Trans Nafta. The legal processes relating to this case continue and will be the subject of further announcements. Meanwhile, Volga Gas anticipates undertaking work on an existing sulphur processing unit for the Vostochny Makarovskoye field. This unit has been partially constructed on the field site and is required for the processing of gas produced from the field.

 

Grafovskaya#1 (sub-salt Karpenskiy)

Further to the announcement on 21 September 2010, operations on the Grafovskaya#1 well have now been concluded, with no commercial hydrocarbon flow rates. As disclosed with the Interim Results 2010, an impairment charge of approximately US$26 million is anticipated for this well.

 

Work programme and budget

The 2011-2012 work programme comprises one new development well on Uzenskoye, as mentioned above, and three exploration wells:

 

·; Yuzhny Romanovskaya-1 in the Urozhainoye-2 licence area. This will be drilled to a depth of approximately 2,800 metres to test Bobrikovsly horizon which is productive in the nearby fields.

·; NewWell-1 in the Pre Caspian licence area. This is planned to be drilled to a depth of 1,500 metres targeting a supra-salt structure.

·; Novaya-1 in the Karpenskiy licence area. This is planned to be drilled to a depth of 1,200 metres to test a sizable supra-salt structure with C3 resources reported earlier.

 

The first is a firm well that completes current work commitment on the Urozhainoye-2 licence. It is expected to be drilled during H1 2011. The other two wells are currently considered as a contingent work programme.

 

The cost of the firm exploration drilling outlined above has been budgeted at US$3.5 million. In the event of success, we would anticipate further drilling on the same prospects during 2011-2012. The development expenditure on Uzenskoye during 2011 is planned to be US$2.0 million. In addition, the anticipated work on the existing sulphur processing unit for the Vostochny Makarovskoye field investment is expected to require investment of less than US$ 3 million. This is expected to be largely funded by cash generated from operations.

 

Mikhail Ivanov, Chief Executive of Volga Gas commented:

"After the disappointing test results on Grafovskaya #1, Volga Gas is in the short term concentrating on bringing existing discoveries into production and on exploration activities in supra-salt horizons where we have a clear track record of success.

 

"The programme we have developed is focused on increasing both our production and reserves with exploration drilling that includes some low risk prospects as well as material high impact/high risk (but low cost) drilling. Meanwhile, we are also continuing to work towards delivering production from the Vostochny Makarovskoye gas/condensate field and are examining further opportunities to expand our business."

 

- Ends -

 

For additional information please contact:

 

Volga Gas plc

Mikhail Ivanov, Chief Executive Officer

+7 (495) 721 1233

Tony Alves, Chief Financial Officer

+44 (0) 20 8622 4451

Oriel Securities, Nominated Advisor

Natalie Fortescue

Gareth Price

+44 (0)20 7710 7600

Financial Dynamics

Billy Clegg

+44 (0)20 7831 3113

Ed Westropp

Alex Beagley

 

Editors' notes:

 

Volga Gas is an independent oil and gas exploration and production company operating in the Volga region of European Russia. The company has 100% interests in its four licence areas.

 

The information contained in this announcement has been reviewed and verified by Mr. Mikhail Ivanov, Director and Chief Executive Officer of Volga Gas plc, for the purposes of the Guidance Note for Mining, Oil and Gas companies issued by the London Stock Exchange. Mr. Mikhail Ivanov holds a M.S. Degree in Geophysics from Novosibirsk State University. He also has an MBA degree from Kellogg School of Management (Northwestern University). He is a member of the Society of Petroleum Engineers.

 

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
TSTUOUBRRBAARAA
Date   Source Headline
10th Mar 20202:00 pmRNSPrice Monitoring Extension
3rd Mar 20207:00 amRNSPRODUCTION REPORT FOR FEBRUARY 2020
4th Feb 20207:00 amRNSPRODUCTION REPORT FOR JANUARY 2020
27th Jan 20207:00 amRNSPreliminary Results of Reservoir Study
6th Jan 20207:00 amRNSPRODUCTION REPORT FOR DECEMBER 2019
3rd Dec 20199:00 amRNSDirectorate Change
3rd Dec 20198:16 amRNSPRODUCTION REPORT FOR NOVEMBER 2019
4th Nov 20195:42 pmRNSHolding(s) in Company
4th Nov 20197:18 amRNSProduction Report for October 2019
2nd Oct 201911:47 amRNSPRODUCTION REPORT FOR SEPTEMBER 2019
30th Sep 201911:07 amRNSINTERIM RESULTS
3rd Sep 20192:06 pmRNSSecond Price Monitoring Extn
3rd Sep 20192:01 pmRNSPrice Monitoring Extension
2nd Sep 20193:56 pmRNSPRODUCTION REPORT FOR AUGUST 2019
5th Aug 201911:05 amRNSSecond Price Monitoring Extn
5th Aug 201911:00 amRNSPrice Monitoring Extension
5th Aug 20198:11 amRNSDRILLING UPDATE AND PRODUCTION REPORT FOR JULY
31st Jul 20197:00 amRNSTotal Voting Rights
17th Jul 20194:40 pmRNSSecond Price Monitoring Extn
17th Jul 20194:35 pmRNSPrice Monitoring Extension
17th Jul 20194:22 pmRNSOPERATIONAL UPDATE
4th Jul 20192:44 pmRNSPDMR Notification, Transaction in Own Shares & TVR
2nd Jul 20192:05 pmRNSSecond Price Monitoring Extn
2nd Jul 20192:00 pmRNSPrice Monitoring Extension
2nd Jul 20191:19 pmRNSDRILLING UPDATE AND PRODUCTION REPORT FOR JUNE 19
4th Jun 20197:00 amRNSDRILLING UPDATE AND PRODUCTION REPORT FOR MAY 2019
20th May 201911:20 amRNSResult of Annual General Meeting
20th May 20197:00 amRNSOPERATIONAL UPDATE
3rd May 20197:00 amRNSPRODUCTION REPORT FOR APRIL 2019
30th Apr 20197:00 amRNSTotal Voting Rights
24th Apr 20197:00 amRNSAvailability of Annual Report and Notice of AGM
23rd Apr 20193:36 pmRNSComment on share price movement
17th Apr 201911:33 amRNSTransaction in Own Shares
16th Apr 201910:03 amRNSChange in Substantial Shareholdings
11th Apr 20197:00 amRNSFinal Dividend Payment and Currency Election
8th Apr 20193:09 pmRNSREPLACEMENT RNS: Results for FY 31 December 2018
8th Apr 20197:00 amRNSResults for the year ended 31 December 2018
3rd Apr 20197:00 amRNSPRODUCTION REPORT FOR MARCH 19 AND DRILLING UPDATE
4th Mar 20197:00 amRNSDRILLING UPDATE AND PRODUCTION REPORT FOR FEB 19
18th Feb 20192:53 pmRNSProposed appointment of an alternate director
5th Feb 20197:00 amRNSPRODUCTION REPORT FOR JANUARY 2019
29th Jan 20197:00 amRNSPDMR Notification
29th Jan 20197:00 amRNSPDMR Notification
28th Jan 20197:00 amRNSHolding(s) in Company
8th Jan 20197:00 amRNSPRODUCTION REPORT FOR DECEMBER 2018
14th Dec 20182:29 pmRNSTransaction in Own Shares
4th Dec 20187:00 amRNSPRODUCTION REPORT FOR NOVEMBER 2018
6th Nov 20187:00 amRNSPRODUCTION REPORT FOR OCTOBER 2018
5th Oct 20187:00 amRNSPRODUCTION REPORT FOR SEPTEMBER 2018
1st Oct 201810:23 amRNSDirector/PDMR Shareholding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.