The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksUk Oil & Gas Regulatory News (UKOG)

Share Price Information for Uk Oil & Gas (UKOG)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0255
Bid: 0.024
Ask: 0.027
Change: 0.0015 (6.25%)
Spread: 0.003 (12.50%)
Open: 0.024
High: 0.0255
Low: 0.0225
Prev. Close: 0.024
UKOG Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

HH-2 Pilot Completed & HH-2z Horizontal Underway

22 Oct 2019 07:00

RNS Number : 6153Q
UK Oil & Gas PLC
22 October 2019
 

UK Oil & Gas PLC

("UKOG" or the "Company")

 

Horse Hill Oil Field: HH-2 Pilot Completed, HH-2z Horizontal Trajectory Underway

 

UK Oil & Gas PLC (London AIM: UKOG) is pleased to announce that, following the successful completion of the Horse Hill-2 ("HH-2") Portland pilot well, Horse Hill-2z ("HH-2z") horizontal drilling operations are now underway (UKOG 85.635% net controlling interest). HH-2z aims to deliver a circa 3,200 ft horizontal section wholly within the Portland reservoir's most oil productive zone or "sweet spot", the presence and quality of which has been further defined by the pilot well's highly successful coring and electric logging programmes.

 

The significant oil saturations and high permeabilities observed in HH-2 core and logs, indicate that the "sweet spot" has likely contributed the lion's share of the 29,568 barrels of Brent quality oil produced to date from Portland extended well testing ("EWT") operations at HH-1.

 

HH-2/2z, the first horizontal well in the field's Portland oil pool, is designed to be retained as a future production well, capable of delivering flow rates significantly higher than the previously reported 362 barrels of oil per day from the HH-1 vertical Portland discovery well. Following a planned extensive HH-2z EWT campaign, both HH-2z Portland and the HH-1 Kimmeridge well are expected to be put into long term production by the end of 2019.

 

HH-2z Operations

 

HH-2z operations were initiated through the pilot well's 9⅝" casing at the planned "kick-off" point1320 ft below rig floor, immediately above cement plugs isolating the Portland reservoir below. The well is now building angle towards the horizontal within 8½" diameter hole and will continue down to a drilled depth of around 2300 ft, just above the Portland target zone. This section will then be cased and cemented with a 7" liner.

 

The well's trajectory will then continue within 6" diameter hole, entering the Portland target zone approximately 850 ft to the southeast of the HH-2 surface location. HH-2z's expected total measured depth is around 5900 ft from rig floor, of which c. 3200 ft is planned within the reservoir's sweet-spot. The well is expected to reach its total depth around mid-November.

 

To ensure the borehole remains wholly within the Portland sweet spot, HH-2z will be actively "geo-steered" during drilling to keep within a series of core and electric log-derived diagnostic geological markers delineating the zone's upper and lower boundaries. The successful delivery of such an optimally placed horizontal trajectory is designed to optimise flow rates and oil recoveries from the Portland reservoir.

 

UKOG holds a controlling 85.635% interest in the Horse Hill oil field and surrounding highly prospective PEDL137 and PEDL246 licences, which are operated by UKOG's subsidiary company, Horse Hill Developments Ltd.

 

Stephen Sanderson, UKOG's Chief Executive, commented:

 

"Our confidence in the HH-2z horizontal's ability to deliver significant flow rates has been further boosted by the pilot well's better than expected geological results. Our subsurface team's focus is now firmly upon steering the well wholly within the target zone, the Portland sweet spot , demonstrably the most oil productive part of the reservoir. I have every confidence we can deliver the desired positive result."

 

Qualified Person's Statement

 

Matt Cartwright, UKOG's Commercial Director, who has over 36 years of relevant experience in the global oil industry, has approved the information contained in this announcement. Mr Cartwright is a Chartered Engineer and member of the Society of Petroleum Engineers.

 

For further information, please contact:

 

UK Oil & Gas PLC

Stephen Sanderson / Kiran Morzaria Tel: 01483 900582

 

WH Ireland Ltd (Nominated Adviser and Broker)

James Joyce / James Sinclair-Ford Tel: 020 7220 1666

 

Cenkos Securities PLC (Joint Broker)

Joe Nally / Neil McDonald Tel: 0207 397 8919

 

Novum Securities (Joint Broker)

John Bellis Tel: 020 7399 9400

 

Public Relations

Brian Alexander Tel: 01483 900582

 

Glossary

 

 

Coring

a drilling technique that involves using a doughnut-shaped drilling bit to capture or "cut" a continuous cylinder-shaped sample of in-situ rock. The core is captured in a steel pipe or "core barrel" above the bit. Core is normally cut in 30 feet lengths, or multiples of 30 feet, and with a diameter of 3-4.5 inches. Core is taken in petroleum reservoir rocks for detailed laboratory analyses of geological, geochemical petrophysical and geomechanical properties

horizontal well

a well that during drilling is steered so as to follow and remain within a particular geological stratum or reservoir unit having a trajectory that runs approximately parallel to the top and or base of the target horizon

oil field

an accumulation, pool or group of pools of oil in the subsurface that produces oil to surface

well test

or flow test involves testing a well by flowing hydrocarbons to surface, typically through a test separator; key measured parameters are oil and gas flow rates, downhole pressure and surface pressure. The overall objective is to identify the well's capacity to produce hydrocarbons at a commercial flow rate and volumes.

 

UKOG Licence Interests

 

The Company has interests in the following UK licences:

 

Asset

Licence

UKOG Interest

Licence Holder

Operator

Area (km2)

Status

Avington 1

PEDL070

5%

UKOG (GB) Limited

IGas Energy Plc

18.3

Field currently temporarily shut in

Broadford Bridge/Loxley/Godley Bridge 2, 3, 8

PEDL234

100%

UKOG (234) Ltd 4

UKOG (234) Ltd 4

300.0

BB-1/1z oil discovery, Loxley-1 gas appraisal well planning application submitted

A24 3

PEDL143

67.5%

UKOG

UKOG 7

91.8

Finalising new site selection to drill Portland and Kimmeridge prospects

Horndean 1

PL211

10%

UKOG (GB) Limited

IGas Energy Plc

27.3

Field in stable production

Horse Hill 5

PEDL137

85.635%

Horse Hill Developments Ltd 

Horse Hill Developments Ltd 

99.3

Production tests ongoing, HH-2/2z drilling

Horse Hill 5

PEDL246

85.635%

Horse Hill Developments Ltd 

Horse Hill Developments Ltd 

43.6

As above

Isle of Wight (Onshore) 2, 3

PEDL331

95%

UKOG

UKOG

200.0

Preparing planning submission for Arreton-3 oil appraisal well and Arreton South exploration well

Markwells Wood

PEDL126

100%

UKOG (GB) Limited

UKOG (GB) Limited

11.2

MW-1 P&A

Notes:

 

1. Oil field currently in stable production.

2. Oil discovery pending development and/or appraisal drilling.

3. Exploration asset with drillable prospects and leads.

4. Contains the Broadford Bridge-1/1z Kimmeridge oil discovery, the eastern extension of the Godley Bridge Portland gas discovery, plus further undrilled Kimmeridge exploration prospects.

5. Portland and Kimmeridge Oil field with productive and commercially viable zones, EWT ongoing, production planning consent granted in September 2019, appraisal/development drilling campaign underway. Long term production start expected late 2019.

6. UKOG has a direct 77.9% interest in HHDL, which has a 65% interest in PEDL137 and PEDL246.

7. OGA consent received for the transfer of operatorship from Europa to UKOG

8. Gas discovery pending appraisal drilling and development with underlying Kimmeridge potential

 

The information contained within this announcement is deemed by the Company to constitute inside information under the Market Abuse Regulation (EU) No. 596/2014

 

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
MSCLLFIRITLLFIA
Date   Source Headline
4th Apr 201811:34 amRNSLoan Conversion
3rd Apr 20187:01 amRNSReport and Accounts for Year End 30 September 2017
29th Mar 201811:04 amRNSFinal Results for the Year Ended 30 September 2017
29th Mar 20188:55 amRNSFinal Results for the Year Ended 31 December 2017
29th Mar 20187:00 amRNSUpdate - Broadford Bridge-1
27th Mar 201812:42 pmRNSLoan Conversion
23rd Mar 201811:05 amRNSSecond Price Monitoring Extn
23rd Mar 201811:00 amRNSPrice Monitoring Extension
23rd Mar 20187:00 amRNSUpdate - Horse Hill
22nd Mar 201810:09 amRNSLoan Conversion
21st Mar 20182:25 pmRNSUpdate - Broadford Bridge-1
16th Mar 20182:58 pmRNSLoan Conversion
7th Mar 201810:35 amRNSLoan Conversion
6th Mar 20187:59 amRNSRegulatory Consent Update - Broadford Bridge-1/1z
27th Feb 20181:39 pmRNSLoan Conversion
20th Feb 20184:40 pmRNSSecond Price Monitoring Extn
20th Feb 20184:35 pmRNSPrice Monitoring Extension
20th Feb 20182:50 pmRNSUpdate - Broadford Bridge-1
9th Feb 20183:03 pmRNSLoan Conversion
6th Feb 20187:59 amRNSUpdate - Broadford Bridge-1
31st Jan 20187:00 amRNSUpdate - Isle of Wight
10th Jan 20184:52 pmRNSDelisting from NEX Exchange
27th Dec 20173:24 pmRNSAmended- Operational, Technical & Corporate Update
27th Dec 20177:00 amRNSOperational, Technical and Corporate Update
19th Dec 20177:00 amRNSOperational Update - Horse Hill-1
18th Dec 20173:56 pmRNSLoan Conversion
11th Dec 20175:17 pmRNSLoan Conversion
6th Dec 20177:00 amRNSLoan Conversion & Completion of Acquisition
24th Nov 20174:13 pmRNSLoan Conversion
20th Nov 20173:22 pmRNSLoan Conversion
15th Nov 20177:00 amRNS£10M Financing and BB-1z Optimised Flow Testing
9th Nov 201711:51 amRNSExercise of Options
20th Oct 201711:58 amRNSHoldings in Company
19th Oct 20179:25 amRNSHolding(s) in Company
19th Oct 20179:19 amRNSUpdate on Holmwood Well
18th Oct 20173:45 pmRNSHorse Hill - Planning Permission Granted
16th Oct 20173:11 pmRNSOperational Update
12th Oct 201712:13 pmRNSHolding(s) in Company
10th Oct 20175:18 pmRNSOperational Update
25th Sep 201712:05 pmRNSAcquisition of further interest in PEDL143
25th Sep 201710:35 amRNSHolding(s) in Company - Correction
25th Sep 201710:13 amRNSHolding(s) in Company
13th Sep 20177:00 amRNSUpdate - Broadford Bridge-1
11th Sep 20171:50 pmRNSExercise of Options
8th Sep 20177:00 amRNSUpdate - Horse Hill
6th Sep 20173:47 pmRNSOperational Update
24th Aug 20177:00 amRNSAcquisition of Further Interest in Horse Hill-1
10th Aug 20171:00 pmRNSOperational Update
31st Jul 20176:05 pmRNSOperational Update and Warrant Exercise
31st Jul 20175:11 pmRNSNotification of Major Holdings in Shares

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.