Less Ads, More Data, More Tools Register for FREE

Pin to quick picksTertiary Minerals Regulatory News (TYM)

Share Price Information for Tertiary Minerals (TYM)

Share Price is delayed by 15 minutes
Get Live Data
0.0625    0.00 (0.00%)
Bid:
0.06
Ask:
0.065
Spread: 0.005 (8.333%)
Market Cap: £4.47m
TYM Live PriceLast checked at - London Stock Exchange

Intraday Tertiary Minerals Share Chart

Storuman Drill Programme - Pr

13 May 2008 06:00

RNS Number : 2476U
Tertiary Minerals PLC
13 May 2008
Β 

ο»Ώ

www.tertiaryminerals.com

13 MayΒ 2008

DRILLINGΒ ATΒ STORUMANΒ FLUORSPAR PROJECTΒ 

CONFIRMS POTENTIAL FOR LARGE DEPOSIT

10Β DrillΒ HolesΒ CompletedΒ OverΒ 2km Strike LengthΒ 

Visible Fluorspar MineralisationΒ PresentΒ In All Holes Including Step-Out Holes

Indications OfΒ Potentially LargeΒ Β ExtensionsΒ To Known Mineralisation

___________________________________________________________________

Tertiary Minerals plc ("Tertiary" or "the Company") is pleased toΒ reportΒ positiveΒ initialΒ findings fromΒ the completion ofΒ its first drilling programme at its 100% owned Storuman fluorspar deposit in the VΓ€sterbotten district of Northern Sweden.Β 

The drillΒ programmeΒ wasΒ designed toΒ re-investigate a large, shallow,Β body of fluorspar mineralisation discoveredΒ in the 1970'sΒ byΒ Granges AluminiumΒ who calculated anΒ "ore reserve" of 12.5 million tonnes grading 13.3%Β fluorite (CaF2)*Β with a favourable mining geometry.Β 

Tertiary has completedΒ 10 drill holesΒ onΒ a SE-NW traverse along theΒ fluorsparΒ mineralised zone at an average spacing of 250m, over a total strike lengthΒ of 2km to test theΒ grade and continuity of mineralisation and to collect samples for metallurgical testwork.

Visible fluorspar mineralisationΒ wasΒ intersected in all of theΒ 10Β holes drilled.Β Whilst it is not possible at this stage to estimate fluorspar gradeΒ byΒ visual inspection,Β the intensity of mineralisationΒ appears consistent withΒ expectations based onΒ historically reported results.Β The core has now been submitted for assayingΒ and results are expected byΒ theΒ endΒ ofΒ June.

Drilling hasΒ shownΒ that the fluorspar mineralisation occursΒ as a replacementΒ within anΒ 8-10m thickΒ gritstone/sandstone unitΒ occurring near the base of aΒ sub-horizontalΒ sequence ofΒ sedimentsΒ that overlieΒ aΒ granite basement. ThisΒ sequenceΒ isΒ remarkably uniform over theΒ largeΒ areaΒ so farΒ drillΒ tested.

TheΒ final three holes of the programme were speculative holes,Β each stepping-out 250-300mΒ beyond the previously knownΒ perimeter of the deposit at itsΒ NWΒ limits.Β AllΒ threeΒ step-outΒ holesΒ intersectedΒ fluorspar mineralisation.Β 

OfΒ particularΒ significanceΒ was the final step-outΒ hole,Β drilled onΒ theΒ westernΒ side of theΒ highway.Β Β The highway follows a valleyΒ where the sub-horizontalΒ fluorspar deposit is eroded away.Β PreviouslyΒ theΒ depositΒ wasΒ onlyΒ knownΒ toΒ sub-cropΒ on theΒ easternΒ side of the valleyΒ where itΒ has been drilled andΒ continuesΒ for an unknown but potentially large distanceΒ into theΒ hillside.Β The step-outΒ drill holeΒ on theΒ westernΒ side of the valleyΒ was abandonedΒ for technical reasonsΒ before reaching its finalΒ plannedΒ depth,Β but not beforeΒ intersecting fluorspar mineralised gritstone and demonstrating that the ore horizon continuesΒ and is mineralisedΒ with fluorsparΒ on theΒ westernΒ side of the valley.Β ThisΒ suggests a furtherΒ potentially large areaΒ of mineralisationΒ is presentΒ on the westΒ side of theΒ valley.

Commenting today PatrickΒ Cheetham, Executive Chairman of the Company, recently returned from Storuman,Β saidΒ "MyΒ initial impression is that theΒ programme has met all of our expectations,Β and more.Β We need to wait for the assay results but theΒ drilling hasΒ certainlyΒ confirmedΒ a large deposit of fluorspar mineralisation and the step-out holes showΒ potential forΒ furtherΒ substantialΒ extensions."

The Company plansΒ to completeΒ a Scoping Study for development of the deposit over the summer.

A drill hole location plan and photographs from the drilling programme willΒ soonΒ be uploadedΒ toΒ the Company's website atΒ www.tertiaryminerals.com.

Further info:

Patrick Cheetham, Executive Chairman, Tertiary Minerals plc.Β Tel: +44 (0)1625-626203

Ron Marshman/John Greenhalgh, City of London PR Limited. Tel: +44(0)20-7628-5518Β 

Jonathan Wright, Seymour Pierce Limited.Β Tel:Β +44(0)20-7107-8000

* ThisΒ "ore-reserve"Β is historic and not compliant with any recognisedΒ resource or reserveΒ code.

Background

Tertiary was awarded the Storuman exploration licence in January this year. TheΒ Storuman fluoriteΒ deposit is located in an area with well established infrastructure. It is located adjacent to a sealed highwayΒ 20kmΒ from the regional town ofΒ StorumanΒ which is connected by road and rail to the city andΒ portΒ ofΒ UmeΓ₯Β on theΒ Gulf of Bothnia. In the other direction the highway leads to theΒ port city ofΒ Mo-i-RanaΒ inΒ Norway.

Fluorspar is the commercial name for the industrial mineral fluorite (calcium fluoride - chemical formulaΒ CaF2). It is the main industrial source of fluorine for the manufacture of hydrofluoric acid and derivative fluorine chemicals including refrigerants, PTFE (Teflonβ„’) and aluminium hydrofluoride, a flux used in the reduction of alumina to aluminium. It is also used as a flux in steel making, in the ceramics industry and in the manufacture of nuclear fuel (uranium hexafluoride).

Fluorspar consumers, several of which are based in Europe, are facing critical supply shortages as traditional supplies fromΒ ChinaΒ are diverted to meet growing Chinese domestic demand.Β ChinaΒ has recently imposed export quotas and export taxes to discourage export and thus ensure domestic supplies.Β 

A conceptual target for the Company is a mining operation producing at least 100,000 tonnes per annum of acid grade fluorspar which currently sells inΒ EuropeΒ for over US$300 per tonne, more than double the price some few years ago. The world market for fluorspar is just over 5 million tonnes per annum of which 65% is for acid grade fluorspar.

This information is provided by RNS
The company news service from the London Stock Exchange
Β 
END
Β 
Β 
DRLQLLFFVEBLBBQ
Date   Source Headline
27th Nov 20147:00 amRNSPhase 3 Drilling Update
19th Nov 20149:45 amRNSPhase 3 Drilling Programme Update
29th Oct 20147:00 amRNSPhase 3 Drilling Programme Update
2nd Oct 20147:00 amRNSChange of Adviser
1st Oct 201410:55 amRNSIssue of Warrants
18th Sep 201412:02 pmRNSWarrant Extension
16th Sep 20147:00 amRNSMB Fluorspar Project - Drilling Programme awarded
10th Sep 20147:00 amRNSDirector Dealing & Issue of Equity
28th Aug 20147:00 amRNSUpdated Corporate Presentation
21st Aug 201412:38 pmRNSDirectors Share Holding - Correction Announcement
20th Aug 20145:57 pmRNSDirectors Share Issue and Total Voting Rights
30th Jul 20147:00 amRNSChange of Auditor
11th Jul 20147:00 amRNSPlacing & Issue of Equity
2nd Jul 20147:00 amRNS"Exploitation Permit Application"
19th May 20147:00 amRNSHalf Yearly Report
24th Apr 20147:00 amRNSStmnt re Share Price Movement
16th Apr 20147:00 amRNSMaiden JORC Compliant Mineral Resource Estimate
15th Apr 20148:14 amRNSDraw Down of Funds and Issue of Equity
19th Mar 201412:38 pmRNSHolding(s) in Company
10th Mar 20147:00 amRNSDrilling Results and Contract Award
25th Feb 20149:01 amRNSIssue of Equity
20th Feb 20147:00 amRNSResult of AGM
19th Feb 20147:00 amRNSUpdate of Corporate Presentation
17th Jan 20147:00 amRNSPosting of Annual Report and Notice of AGM
15th Jan 201411:58 amRNSIssue of Warrants
14th Jan 20149:40 amRNSExercise of Options - Issue of Equity and TVR
13th Jan 20147:00 amRNSMB Fluorspar Project Drilling Results
18th Dec 20137:00 amRNSMB Fluorspar Project - Drill Results
12th Dec 20133:45 pmRNSAudited Results for the year to 30 September 2013
13th Nov 20133:00 pmRNSHolding(s) in Company
13th Nov 201311:55 amRNSHolding(s) in Company
12th Nov 20137:01 amRNSDirectorate Change
12th Nov 20137:00 amRNSClose of Equity Swap Agreement
11th Sep 20137:00 amRNSMB Fluorspar Project Update
20th Aug 20132:58 pmRNSUpdated Company Presentation
20th Aug 20137:00 amRNSProject Update
14th Aug 20137:00 amRNSAppointment of Joint Broker
10th Jul 20137:00 amRNSMB Project Update
27th Jun 20133:22 pmRNSHolding(s) in Company
27th Jun 20133:21 pmRNSHolding(s) in Company
18th Jun 20137:00 amRNSDirector/PDMR Shareholding
30th May 201310:35 amRNSCorporate interview available online
24th May 20137:00 amRNSSubscription for Ordinary Shares and Equity Swap
14th May 20137:00 amRNSHalf Yearly Report
9th May 20137:00 amRNSMB Fluorspar Project - Update
22nd Mar 201311:25 amRNSDirector/PDMR Shareholding
18th Mar 20137:00 amRNSExercise of Options - Issue of Equity & TVR
8th Mar 20139:39 amRNSIssue of Equity and Total Voting Rights
6th Mar 20137:00 amRNSDraw Down of Funds & Issue of Equity
5th Mar 20137:00 amRNSChange of Adviser

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.