Less Ads, More Data, More Tools Register for FREE

Pin to quick picksTSG.L Regulatory News (TSG)

  • There is currently no data for TSG

Asacha Mining and Production Update

29 Oct 2012 07:00

RNS Number : 6865P
Trans-Siberian Gold PLC
29 October 2012
 

 

 

Trans-Siberian Gold plc

 

Asacha mining and production update

 

 

LONDON: 29 October 2012 - Trans-Siberian Gold plc ("TSG" or the "Company") (TSG.L) reports that mine development activities at Asacha in the third quarter of 2012 comprised approximately 1,090 metres, while ore extraction (including ore from stoping and mine development) amounted to 26,644 mt.

 

In the same period, an average 12,414 mt per month was processed by the Asacha plant (99.3% of the production level envisaged in the plant's design documentation).

 

Mining and production at Asacha in the first nine months of 2012 is shown in the following table.

 

 

 

 

1st quarter 2012

2nd quarter 2012

July 2012

 

Aug 2012

 

Sept

2012

3rd quarter 2012

Year to date

Mine development (m)

1,023

1,047

381

352

357

1,090

3,160

Ore extracted (mt)

33,525

30,090

12,204

8,924

5,516

26,644

90,259

Ore processed (mt)

28,877

32,963

12,682

12,422

12,140

37,244

99,084

Average gold grade (g/t)

7.03

6.33

7.68

6.02

6.28

6.67

6.66

Average silver grade (g/t)

16.48

10.55

13.42

9.49

10.54

11.17

12.51

Gold recovery rate (%)

 95.14

95.48

96.01

94.93

95.85

95.66

95.48

Silver

recovery rate (%)

48.19

73.67

77.60

76.22

79.12

77.66

65.54

Gold in dore (oz)

 6,689

6,462

3,182

2,169

2,432

7,783

20,934

Silver in dore

(oz)

7,320

8,991

4,357

2,957

3,224

10,538

26,849

Gold refined (oz)

 6,281

6,427

3,464

2,336

1,265

7,065

19,773

Silver refined (oz)

 6,975

8,397

4,989

2,914

1,726

9,629

25,001

 

TSG reported on 27 September 2012 that the breakdown of some underground equipmenthad reduced the amount of stoping ore which could be delivered to the plant in the second half of the third quarter, necessitating blending the mined ore with lower grade ore from the surface ore stockpile. This problem continued into October, although all necessary spare parts have now been delivered to site. A new underground truck is expected to arrive in Kamchatka by the end of October. Its delivery to Asacha depends on road conditions and is expected in late November, at which time we also expect the arrival of a new underground loader.

 

As a consequence of the mining production problems in September and October, TSG now expects 2012 production of around 27,000 oz gold, compared to the previous estimate of 31,000 oz.

 

The Company is also taking steps to strengthen the mine's management team with the appointment of two new underground mining engineers and a mining geologist. It also intends to recruit a technical director for Asacha.

 

TSG will report Asacha's fourth quarter 2012 gold production in January 2013.

 

 

Ends

 

Contacts

 

TSG

 

Simon Olsen

+ 44 (0) 1480 811871

+ 44 (0) 7770 484965

 

 

Seymour Pierce Ltd

+44 (0) 207 107 8000

Stewart Dickson / David Foreman (Corporate Finance)

 

Jeremy Stephenson (Corporate Broking)

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCLLFLEITLRFIF
Date   Source Headline
7th Apr 202111:47 amRNSForm 8 (OPD) (Horvik Limited) (Amendment 070421)
7th Apr 20219:20 amRNSForm 8.3 - Trans-Siberian Group Plc
7th Apr 20218:56 amRNSForm 8.3 - TRANS-SIBERIAN GOLD PLC
6th Apr 20219:51 amRNSForm 8.3 - Trans-Siberian Gold plc
6th Apr 20219:48 amRNSForm 8.3 - Trans-Siberian Gold plc
6th Apr 20219:47 amRNSForm 8.3 - Trans-Siberian Gold plc
6th Apr 20219:47 amRNSForm 8.3 - Trans-Siberian Gold plc
6th Apr 20219:46 amRNSForm 8.3 - Trans-Siberian Gold plc
6th Apr 20218:49 amRNSForm 8.3 - TRANS-SIBERIAN GOLD PLC
1st Apr 20215:18 pmRNSForm 8.3 - Trans-Siberian Gold plc
1st Apr 202110:43 amRNSForm 8.3 - [TRANS-SIBERIAN GOLD PLC]
1st Apr 20219:31 amRNSForm 8.3 - Trans-Siberian Gold Plc
31st Mar 20217:00 amRNSForm 8.3 - Trans-Siberian Gold Plc
30th Mar 20213:57 pmRNSForm 8.3 - Trans Siberian Gold Plc
30th Mar 20213:55 pmRNSForm 8.3 - Trans Siberian Gold Plc
30th Mar 20213:54 pmRNSForm 8.3 - Trans Siberian Gold Plc
30th Mar 20211:37 pmRNSForm 8.3 - [Trans Siberian Gold Plc]
30th Mar 20211:36 pmRNSForm 8.3 - Trans Siberian Gold Plc
30th Mar 20211:33 pmRNSForm 8.3 - Trans Siberian Gold Plc
30th Mar 20219:17 amRNSForm 8.3 - Trans-Siberian Gold Plc
30th Mar 20219:06 amRNSForm 8.3 - [TRANS-SIBERIAN GOLD PLC]
29th Mar 20218:27 amRNSHolding(s) in Company
26th Mar 20213:43 pmRNSHolding(s) in Company
26th Mar 20213:13 pmRNSHolding(s) in Company
26th Mar 20213:00 pmRNSHolding(s) in Company
26th Mar 20211:39 pmRNSForm 8.3 - Trans-Siberian Gold PLC
26th Mar 20219:46 amRNSForm 8.3 - [TRANS-SIBERIAN GOLD PLC]
26th Mar 20217:00 amRNSHolding(s) in Company
25th Mar 20219:19 amRNSForm 8.5 (EPT/RI)
24th Mar 20213:44 pmRNSForm 8.3 - [Trans-Siberian Gold PLC]
24th Mar 202111:13 amRNSForm 8.5 (EPT/RI) - Trans-Siberian Gold PLC
24th Mar 20219:56 amRNSForm 8.3 - Trans-Siberian Gold Plc
24th Mar 20218:48 amRNSForm 8.3 - Trans-Siberian Gold PLC
24th Mar 20217:00 amRNSForm 8.3 - Trans-Siberian Gold Plc
23rd Mar 20219:46 amRNSForm 8.5 (EPT/RI)
23rd Mar 20219:31 amRNSForm 8.3 - Trans-Siberian Gold Plc
23rd Mar 20219:23 amRNSForm 8 (OPD) (Trans-Siberian Gold plc)
23rd Mar 20218:44 amRNSForm 8.3 - TRANS-SIBERIAN GOLD PLC
23rd Mar 20217:00 amRNSAmendment to Co-operation Letter
22nd Mar 202110:24 amRNSForm 8.3 - Trans-Siberian Gold Plc
22nd Mar 202110:11 amRNSForm 8.5 (EPT/RI)
22nd Mar 20219:15 amRNSForm 8.3 - TRANS-SIBERIAN GOLD PLC
19th Mar 20214:42 pmRNSForm 8 (OPD) (Horvik Limited) (Amendment)
19th Mar 20214:25 pmRNSRAB Capital Holdings Ltd - Form 8.3 - TSG Plc
19th Mar 20213:30 pmRNSForm 8.3 -TSG LN
19th Mar 20211:15 pmRNSForm 8.5 (EPT/RI)
19th Mar 202112:02 pmRNSForm 8 (OPD) (Horvik Limited)
19th Mar 20219:57 amRNSForm 8.3 - Trans-Siberian Gold Plc
18th Mar 20217:04 amRNSRecommended Offer for Trans-Siberian Gold Plc
17th Mar 20217:00 amRNSTransaction in Own Shares

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.