George Frangeskides, Chairman at ALBA, explains why the Pilbara Lithium option ‘was too good to miss’. Watch the video here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksTlou Energy Regulatory News (TLOU)

Share Price Information for Tlou Energy (TLOU)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.00
Bid: 2.00
Ask: 2.10
Change: -0.05 (-2.44%)
Spread: 0.10 (5.00%)
Open: 2.00
High: 2.05
Low: 2.00
Prev. Close: 2.05
TLOU Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Transmission Line construction update

23 May 2022 07:00

RNS Number : 3525M
Tlou Energy Ltd
23 May 2022
 

 

23 May 2022

 

Tlou Energy Limited

("Tlou" or "the Company")

 

Transmission Line construction update

 

 

Construction activities for the transmission line to connect the Lesedi Power Project ("Lesedi") to the Botswana power grid have commenced.

 

Zismo Engineering Pty Ltd ("Zismo") have completed their preliminary work and bush clearing of the route is underway. Preliminary work included site handover, assembling the project team and resources, mobilisation of plant and equipment, line survey and design, pole structure modelling, and review and approval by Tlou's Owners Engineer, Mott MacDonald.

 

Zismo has also commenced procurement of equipment which includes manufacture of steel and wooden poles, cross-arms, line hardware, fittings, stay wire and assemblies. Equipment will be delivered in batches, with the first delivery of wooden poles expected next month.

 

Zismo's project site offices are set-up in Mogorosi village and a roving site camp will be located at convenient locations along the transmission line route.

 

 

Project activities

Work commenced with route preparation which includes bush clearing as mentioned above, as well as installation of farm gates where required, line pegging, inspection and approval.

 

Erection of poles will be performed in sections with work commencing on the Serowe end of the line and working towards Lesedi. Work on the first section is due to commence at the end of June and on section two around the end of September 2022. The line is expected to use approximately 650 wooden poles and 80 steel structures involving excavation, positioning, assembly, dressing, planting, backfilling and compacting, and thereafter stringing, tensioning and regulation. This will be followed by testing and commissioning and ultimately line energisation.

 

Work on the transmission line is scheduled for completion in mid-2023, with the substations at either end of the transmission line expected to be completed in the second half of 2023. Sale of electricity can start thereafter.

 

 

Tlou's Managing Director, Mr Tony Gilby commented, "It is great to have the transmission line work underway in the field. Our team will be very busy onsite over the coming months and I look forward to seeing the project develop.

 

We are firmly on track to becoming a regional power producer in a market with a huge power demand and at a time where worldwide demand for gas and cleaner energy is growing significantly."

 

About the Lesedi Power Project

The Lesedi Power Project ("Lesedi") is located in Botswana's Central District, approximately 100 Km from the existing electricity grid.

 

To connect Tlou's 100% owned gas field and proposed generation site at Lesedi to the grid, a 100 Km, 66kV transmission line and supporting substations are required. The line will join the existing grid near the town of Serowe. The 66kV line will be capable of carrying up to 25MW of power. Initial electricity generated will be sold to Botswana Power Corporation, the national power utility under an agreed 10MW Power Purchase Agreement (PPA). First revenue under this PPA is expected in late 2023.

 

 

The information contained within this announcement is deemed to constitute inside information as stipulated under the retained EU law version of the Market Abuse Regulation (EU) No. 596/2014 (the "UK MAR") which is part of UK law by virtue of the European Union (withdrawal) Act 2018. The information is disclosed in accordance with the Company's obligations under Article 17 of the UK MAR. Upon the publication of this announcement, this inside information is now considered to be in the public domain.

 

 

By Authority of the Board of Directors

Mr. Anthony Gilby

Managing Director

****

 

For further information regarding this announcement please contact:

Tlou Energy Limited

+61 7 3040 9084

Tony Gilby, Managing Director

 

Solomon Rowland, General Manager

 

 

 

Grant Thornton (Nominated Adviser)

+44 (0)20 7383 5100

Harrison Clarke, Colin Aaronson, Ciara Donnelly

 

 

 

Arden Partners (UK Broker)

+44 (0) 20 7614 5900

Simon Johnson, Antonio Bossi

Public Relations

Ashley Seller

+61 418 556 875

 

About Tlou

Tlou is developing energy solutions in Sub-Saharan Africa through gas-fired power, solar power and hydrogen projects. The Company is listed on the ASX (Australia), AIM (UK) and the BSE (Botswana). The Lesedi Power Project ("Lesedi") is 100% owned and is the Company's most advanced. Tlou's competitive advantages include our ability to drill cost effectively for gas, our operational experience and Lesedi's strategic location in relation to energy customers. All major government approvals have been achieved.

 

Forward-Looking Statements

This announcement may contain certain forward-looking statements. Actual results may differ materially from those projected or implied in any forward-looking statements. Such forward-looking information involves risks and uncertainties that could significantly affect expected results. No representation is made that any of those statements or forecasts will come to pass or that any forecast results will be achieved. You are cautioned not to place any reliance on such statements or forecasts. Those forward-looking and other statements speak only as at the date of this announcement. Save as required by any applicable law or regulation, Tlou Energy Limited undertakes no obligation to update any forward-looking statements.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCBKNBKKBKKKPB
Date   Source Headline
14th Apr 20217:01 amRNSTender awards for Transmission Line and Substation
9th Apr 20212:05 pmRNSSecond Price Monitoring Extn
9th Apr 20212:00 pmRNSPrice Monitoring Extension
30th Mar 20217:01 amRNSBoomslang Project – Environmental approval
24th Mar 20217:00 amRNSHolding(s) in Company
17th Mar 202111:06 amRNSSecond Price Monitoring Extn
17th Mar 202111:00 amRNSPrice Monitoring Extension
17th Mar 20217:00 amRNSResult of Placing
16th Mar 20214:35 pmRNSProposed placing to raise £2.6 million
8th Mar 20214:40 pmRNSSecond Price Monitoring Extn
8th Mar 20214:35 pmRNSPrice Monitoring Extension
4th Mar 20214:40 pmRNSSecond Price Monitoring Extn
4th Mar 20214:35 pmRNSPrice Monitoring Extension
1st Mar 20217:00 amRNSFinance progressing with key funding partner
26th Feb 20217:00 amRNSInterim Results
16th Feb 20217:00 amRNSTlou seeking Carbon Neutrality
28th Jan 20217:00 amRNSOperational Report Quarter Ended 31 December 2020
19th Jan 20217:00 amRNSMinistry Update On 100MW Tender
18th Dec 20207:00 amRNSTender timetable, finance, and project update
9th Nov 20204:32 pmRNSDirectors’ shareholdings
2nd Nov 20202:06 pmRNSSecond Price Monitoring Extn
2nd Nov 20202:00 pmRNSPrice Monitoring Extension
29th Oct 20207:00 amRNSOperational Report Quarter Ended 30 September 2020
28th Oct 20204:41 pmRNSSecond Price Monitoring Extn
28th Oct 20204:35 pmRNSPrice Monitoring Extension
28th Oct 20202:00 pmRNSPrice Monitoring Extension
27th Oct 20207:35 amRNSFunding update and Ministerial site visit
27th Oct 20207:00 amRNSResults of AGM and Chairman’s Address
26th Oct 202011:05 amRNSSecond Price Monitoring Extn
26th Oct 202011:00 amRNSPrice Monitoring Extension
23rd Oct 20204:40 pmRNSSecond Price Monitoring Extn
23rd Oct 20204:35 pmRNSPrice Monitoring Extension
23rd Oct 20202:05 pmRNSSecond Price Monitoring Extn
23rd Oct 20202:00 pmRNSPrice Monitoring Extension
23rd Oct 202011:05 amRNSSecond Price Monitoring Extn
23rd Oct 202011:00 amRNSPrice Monitoring Extension
22nd Oct 20204:41 pmRNSSecond Price Monitoring Extn
22nd Oct 20204:35 pmRNSPrice Monitoring Extension
25th Sep 20208:30 amRNSNotice of Annual General Meeting
24th Sep 202010:17 amRNSAppendix 4G and Corporate Governance Statement
21st Sep 20207:00 amRNSFinal Results
16th Sep 20207:00 amRNSTransmission Line Update
14th Sep 20207:00 amRNSResults of General Meeting
3rd Sep 20207:00 amRNSDate of Annual General Meeting
26th Aug 20207:00 amRNSTransmission line and funding update
12th Aug 20207:00 amRNSNotice of General Meeting
7th Aug 20201:33 pmRNSHolding(s) in Company
30th Jul 20207:00 amRNSOperational Report - Quarter Ending 30 June 2020
24th Jul 20207:00 amRNSPlacement of remaining Entitlement Offer shares
16th Jul 20207:37 amRNSEntitlement Offer Closes

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.