The latest Investing Matters Podcast episode featuring financial educator and author Jared Dillian has been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksTlou Energy Regulatory News (TLOU)

Share Price Information for Tlou Energy (TLOU)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.00
Bid: 1.90
Ask: 2.10
Change: 0.00 (0.00%)
Spread: 0.20 (10.526%)
Open: 2.00
High: 2.00
Low: 2.00
Prev. Close: 2.00
TLOU Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Lesedi Project Update

23 Feb 2024 07:00

RNS Number : 1836E
Tlou Energy Ltd
23 February 2024
 

 

23 February 2024

 

Tlou Energy Limited

("Tlou" or "the Company")

 

Project Update: Progress Towards Electricity Generation

 

 

Highlights

 

Ø Lesedi 4P and 6P continue to flare gas as dewatering progresses

Ø Completion of the crucial 66kV transmission line, connecting Tlou's Lesedi project directly to both Botswana's power grid and the broader Southern African Power Pool

Ø Connection to Serowe substation achieved, Lesedi no longer isolated from primary Botswana electricity market

Ø Lesedi substation which will connect Tlou's power generators to the transmission line now approximately 38% complete

 

Lesedi production wells

The Lesedi 4P and 6P production wells are continuing to flow gas as the water level is being gradually lowered to just above the coal. Once the wells stabilise and stop surging (gas and water), gas flow rates will be measured. Tlou is confident that with the in-house knowledge gained from recent drilling efforts, extracting more and more gas out of the coal reservoir will become progressively simpler and more cost effective due to economies of scale.

 

Transmission line

The 66kV electricity transmission line connecting Tlou's Lesedi power generation site to the power grid has been constructed and the line has been connected to the Serowe substation.

 

Any minor finishing works and the addition of switchgear at the Serowe substation will be done prior to the line being energised. The line will be energised as soon as the substation at Lesedi is complete which is expected around the middle of the year subject to funding.

 

The transmission line is a vital element of the Lesedi project. With the completion of the transmission line, the Lesedi project is no longer isolated from Botswana's electricity market and is now connected to the broader Southern African Power Pool.

 

Lesedi Substation

The Lesedi substation, which will connect Tlou's power generators to the transmission line, is approximately 38% complete. Installation of the earth mat is complete with the control room currently being constructed.

 

Generators

Gas fired generators will be installed adjacent to the Lesedi substation on Tlou's 100% owned land. Consultant engineers are evaluating generator options and obtaining quotes from suppliers.

 

Funding

The Company is in discussions with several strategic parties to secure the remaining funds required for project completion. The aim is to secure funding this quarter. The Company remains committed to delivering electricity into the grid at the earliest opportunity, with power sales contracted under the existing 10MW Power Purchase Agreement with Botswana Power Corporation.

 

By Authority of the Board of Directors

Mr. Anthony Gilby

Managing Director

 

****

 

For further information regarding this announcement please contact:

Tlou Energy Limited

+61 7 3040 9084

Tony Gilby, Managing Director

 

Solomon Rowland, General Manager

 

 

 

Grant Thornton (Nominated Adviser)

+44 (0)20 7383 5100

Harrison Clarke, Colin Aaronson, Ciara Donnelly

 

 

 

Zeus Capital (UK Broker)

+44 (0)20 3829 5000

Simon Johnson

Investor Relations

Ashley Seller (Australia)

+61 418 556 875

FlowComms Ltd - Sasha Sethi (UK)

+44 (0) 7891 677 441

 

About Tlou

Tlou is developing energy solutions in Sub-Saharan Africa through gas-fired power and ancillary projects. The Company is listed on the ASX (Australia), AIM (UK) and the BSE (Botswana). The Lesedi Gas-to-Power Project ("Lesedi") is 100% owned and is the Company's most advanced project. Tlou's competitive advantages include the ability to drill cost effectively for gas, operational experience and Lesedi's strategic location in relation to energy customers. All major government approvals have been achieved.

 

Forward-Looking Statements

This announcement may contain certain forward-looking statements. Actual results may differ materially from those projected or implied in any forward-looking statements. Such forward-looking information involves risks and uncertainties that could significantly affect expected results. No representation is made that any of those statements or forecasts will come to pass or that any forecast results will be achieved. You are cautioned not to place any reliance on such statements or forecasts. Those forward-looking and other statements speak only as at the date of this announcement. Save as required by any applicable law or regulation, Tlou Energy Limited undertakes no obligation to update any forward-looking statements.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDBCGDDSGDDGSD
Date   Source Headline
26th Apr 20217:00 amRNSOperational Report - Quarter ending 31 March 2021
14th Apr 20217:01 amRNSTender awards for Transmission Line and Substation
9th Apr 20212:05 pmRNSSecond Price Monitoring Extn
9th Apr 20212:00 pmRNSPrice Monitoring Extension
30th Mar 20217:01 amRNSBoomslang Project – Environmental approval
24th Mar 20217:00 amRNSHolding(s) in Company
17th Mar 202111:06 amRNSSecond Price Monitoring Extn
17th Mar 202111:00 amRNSPrice Monitoring Extension
17th Mar 20217:00 amRNSResult of Placing
16th Mar 20214:35 pmRNSProposed placing to raise £2.6 million
8th Mar 20214:40 pmRNSSecond Price Monitoring Extn
8th Mar 20214:35 pmRNSPrice Monitoring Extension
4th Mar 20214:40 pmRNSSecond Price Monitoring Extn
4th Mar 20214:35 pmRNSPrice Monitoring Extension
1st Mar 20217:00 amRNSFinance progressing with key funding partner
26th Feb 20217:00 amRNSInterim Results
16th Feb 20217:00 amRNSTlou seeking Carbon Neutrality
28th Jan 20217:00 amRNSOperational Report Quarter Ended 31 December 2020
19th Jan 20217:00 amRNSMinistry Update On 100MW Tender
18th Dec 20207:00 amRNSTender timetable, finance, and project update
9th Nov 20204:32 pmRNSDirectors’ shareholdings
2nd Nov 20202:06 pmRNSSecond Price Monitoring Extn
2nd Nov 20202:00 pmRNSPrice Monitoring Extension
29th Oct 20207:00 amRNSOperational Report Quarter Ended 30 September 2020
28th Oct 20204:41 pmRNSSecond Price Monitoring Extn
28th Oct 20204:35 pmRNSPrice Monitoring Extension
28th Oct 20202:00 pmRNSPrice Monitoring Extension
27th Oct 20207:35 amRNSFunding update and Ministerial site visit
27th Oct 20207:00 amRNSResults of AGM and Chairman’s Address
26th Oct 202011:05 amRNSSecond Price Monitoring Extn
26th Oct 202011:00 amRNSPrice Monitoring Extension
23rd Oct 20204:40 pmRNSSecond Price Monitoring Extn
23rd Oct 20204:35 pmRNSPrice Monitoring Extension
23rd Oct 20202:05 pmRNSSecond Price Monitoring Extn
23rd Oct 20202:00 pmRNSPrice Monitoring Extension
23rd Oct 202011:05 amRNSSecond Price Monitoring Extn
23rd Oct 202011:00 amRNSPrice Monitoring Extension
22nd Oct 20204:41 pmRNSSecond Price Monitoring Extn
22nd Oct 20204:35 pmRNSPrice Monitoring Extension
25th Sep 20208:30 amRNSNotice of Annual General Meeting
24th Sep 202010:17 amRNSAppendix 4G and Corporate Governance Statement
21st Sep 20207:00 amRNSFinal Results
16th Sep 20207:00 amRNSTransmission Line Update
14th Sep 20207:00 amRNSResults of General Meeting
3rd Sep 20207:00 amRNSDate of Annual General Meeting
26th Aug 20207:00 amRNSTransmission line and funding update
12th Aug 20207:00 amRNSNotice of General Meeting
7th Aug 20201:33 pmRNSHolding(s) in Company
30th Jul 20207:00 amRNSOperational Report - Quarter Ending 30 June 2020
24th Jul 20207:00 amRNSPlacement of remaining Entitlement Offer shares

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.