Quarterly Activities Report - 31 March 2012

30 Apr 2012 07:00

RNS Number : 2324C
Thor Mining PLC
30 April 2012
 



THOR MINING PLC

 

QUARTERLY ACTIVITIES REPORT

PERIOD ENDING 31 MARCH 2012

 

Dated: 30 April 2012

 

The Directors of Thor Mining PLC ("Thor" or the "Company") (AIM, ASX: THR) the Australian gold, tungsten and molybdenum explorer and developer, today lodged the following March 2012 quarterly report with the Australian Securities Exchange (ASX) as required by the listing rules of ASX.

 

QUARTERLY REPORT JANUARY TO MARCH 2012

Highlights

Outlook for June 2012 Quarter

 

TUNGSTEN & MOLYBDENUM

Molyhil NT

Continued positive progress with Definitive Feasibility Study (DFS).
25% increase to resource estimate
Tungsten recovery increased from 67% to 85% confirmed by independent metallurgical testing.

 

 

 

 

Reserve estimate based on increased resources and revised project economics.
Completion of Molyhil DFS
Marketing & financing activities

 

 

GOLD

Spring Hill NT

Commencement of metallurgical testwork
Review of geophysical data

 

 

 

Continued evaluation of potential for profitable production.
Preparation for drilling deep ("Callie model") and additional near surface targets

 

Dundas WA

·; Site preparations ahead of drill-testing geochemical anomalies.

 

 

·; Preparation for follow up air core and RC drilling

 

 

MOLYHIL TUNGSTEN-MOLYBDENUM PROJECT (NT) (100% THOR)

 

Molyhil Definitive Feasibility Study (DFS)

The consultants, who are currently preparing an enhanced ore reserve calculation and detailed mining schedule for Molyhil, advise that completion of those tasks is now expected late in May or early June 2012. On that basis, the issue the Molyhil feasibility study is not expected before June 2012.

Substantial progress has been made to date, including:

A 25% upgrade in the resource estimate to 4.7 million tonnes
A 26% improvement in the metallurgical; recovery of tungsten to 85%
Bankable estimate of Capital costs @ A$69 million

Bankable estimate of operating costs @ $84/tonne

Based on these estimates, and subject to the outcomes of the detailed mining schedule the operating costs of the proposed Molyhil operation (including royalty payments) are approximately US$110/mtu (metric tonne unit = 10Kg of WO)) after deduction of bi-product credits from the sale of molybdenum compared with revenue of US$360/mtu after deduction of APT processing cost discount.

The selling price in Europe of Tungsten APT now sits at US$440/mtu, while the price of Molybdenum Roasted Concentrates has improved slightly to between US$14.00 and US$15.00/lb.

Based on the diamond and reverse circulation (RC) drill programs completed in 2011 a renewed estimate of resources at Molyhil was completed, with results summarised in tables 1 & 2. The resource estimate was reported in detail on January 30th.

 

Table 1. Summary of Molyhil Mineral Resource Estimate (reported on 30 January 2012)

 

Classification

Resource

MoS2

WO3

Fe

Tonnes

Grade %

Tonnes

Grade %

tonnes

Grade %

Measured

-

-

-

-

-

-

Indicated

3,820,000

0.22

8,200

0.29

10,900

18.8

Inferred

890,000

0.25

2,200

0.25

2,200

15.2

Total

4,710,000

0.22

10,400

0.28

13,100

18.1

Mineral Resource reported at 0.1% combined Mo + WO3 Cut-off and above 200mRL only.

Note: minor rounding errors may occur in compiled totals.

 

Table 2: Comparison of 2012 and 2009 Molyhil Resource Estimates

 

2012 Estimate

2009 Estimate

Total resource (tonnes)

4,710,000

3,750,000

25% increase

Contained WO (tonnes)¹

13,100

12,000

10% increase

Contained MoS2 (tonnes)²

10,400

7,125

46% increase

Cut-off grade (%Mo + %WO3)

0.1%

NIL

Vertical Limit of resource

220 metres

265 metres

Resource open at depth

 

Note 1: 1 tonne of WO = 100 mtu's. The revised resource estimate contains 1,310,000 mtu WO.

Note 2: 1 tonne of MoS= 1,320 lbs Mo. The revised resource estimate contains 13,728,000 lbs Mo.

 

Exploration program

 

While some opportunities remain for extensions at the margins of the deposit as now outlined, this update of the Molyhil resource is now finalised and further drilling of identified areas of potential resource growth will be deferred until the development of the mine and associated infrastructure. Resource growth is now being pursued through exploration of the granted licences; EL22349, EL28948 and EL28949.

 

Initial stages of this work undertaken during the quarter have comprised the compilation and consolidation existing reports and geophysical data resulting in the identification of thirteen exploration targets. Determination of the requirement for additional geophysical data is in progress while the evaluation of the identified targets has commenced.

 

2012 June Quarter activity schedule

Definitive Feasibility Study (DFS)

Results from the DFS are scheduled to be available during the quarter, along with an updated resource estimate and ore reserve and mining plan.

Finance and sales agreements

Initial discussions have been held with a number of parties who have expressed interest in securing off-take agreements for the supply of tungsten and molybdenum concentrates, and also in various alternatives for financing the project. These discussions are ongoing.

 

GOLD EXPLORATION

SPRING HILL PROJECT - NT (THOR acquiring earn-in rights to up to 80% equity)

During the annual wet season interruption to field activities at Spring Hill, results of the 2011 diamond drilling were reviewed in detail in preparation for the continuation of activities.

 

A program of metallurgical testwork was commissioned to assess the potential for profitable production via heap leach extraction. The results from this have yet to be received.

 

Compilation and review of existing geophysical data is nearing completion and will assist with targeting the upcoming drill program. Specifically, this program will be designed to evaluate potential additional resources based on:

Extensions to Hong Kong lode
Partially evaluated lodes identified peripheral to the main lodes
Callie style mineralisation

 

A program of metallurgical testwork was commissioned to assess the potential for profitable production via heap leach extraction. The results from this have yet to be received.

 

DUNDAS PROJECT - WA (60% THOR)

 

Further field work undertaken during the quarter has effectively completed the reconnaissance calcrete geochemistry across the three tenements. Assays received to date have highlighted an extension to the previously drilled Asgard anomaly and identified the new Gimli anomaly, both in the southern extent of E63/872.

 

2012 June Quarter Exploration schedule

Heritage clearance and commencement of the proposed drill program is anticipated during the June quarter.

 

Upon receipt of final calcrete assays, permitting for additional drill testing will be commenced.

 

CORPORATE AND FINANCE

 

During the quarter the Company raised further additional funds through the issue of 57 million ordinary shares, in placements to sophisticated investors in the UK. This issue raised A$840,000 before costs associated with the issue.

In addition a further 13,620,117 UK warrants and CDI options were converted during the quarter raising approximately A$343,000. Of those warrants and options, 9,529,301 were converted at or close to 31 March 2012 resulting in A$236,000 of those proceeds being received after quarter end.

A general meeting of shareholders has been scheduled for 17th May 2012 to ratify recent share issues and to authorise further issues necessary to fund ongoing exploration and evaluation activities.

 

Subsequent to the end of the quarter, Mr David Thomas was appointed to the board of Thor Mining PLC.

 

Competent Persons Statement

 

The information in this report that relates to exploration results is based on information compiled by Richard Bradey, who holds a BSc in applied geology and an MSc in natural resource management and who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Bradey is an employee of Thor Mining PLC. He has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Richard Bradey consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

 

The information in this report that relates to the Molyhil Mineral Resource is based on information compiled by Mr Craig Allison, who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Allison is a full-time employee of Runge Limited. He has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr Allison consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

 

Enquiries:

 

Mick Billing

+61 (8) 7324 1935

 

Thor Mining PLC

Executive Chairman

Allan Burchard

+61 (8) 7324 1935

 

Thor Mining PLC

CFO/Company Secretary

Gerry Beaney/ David Hignell

+44 (0) 207 383 5100

 

Grant Thornton Corporate Finance

 

Nominated Adviser

Nick Emerson/

Renato Rufus

+44 (0) 1483 413500

Simple Investments

Broker

Alex Walters/

Emma Wigan

+44 (0) 7771 713608

+44 (0) 207 839 9260

Cadogan PR

Financial PR

 

Updates on the Company's activities are regularly posted on Thor's website www.thormining.com, which includes a facility to register to receive these updates by email.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCPGUWACUPPUBM
Date   Source Headline
24th Jun 20267:00 amRNSAward of Major 2D Seismic Acquisition Contract
9th Jun 20267:00 amRNSRecords up to 3% Natural Hydrogen at HY-Range
5th Jun 20264:00 pmRNSHolding(s) in Company
29th Apr 20267:00 amRNSQ1 2026 Quarterly Activities and Cash Flow Report
17th Mar 20267:00 amRNSCompletion of HY-Range Phase 2 Geochemical Survey
16th Mar 202611:30 amRNSHalf-year Report for the 6 months ending 31 Dec 25
3rd Mar 20267:00 amRNSThor Energy Plc to Appoint Director to ECL Board
20th Feb 20268:00 amRNSAward of Two New Prospective Licence Applications
30th Jan 20267:00 amRNSQuarterly Activities and Cash Flow Report Q4 2025
19th Jan 20267:00 amRNSMolyhil Update - A$2,250,000 Payment Received
18th Dec 20257:00 amRNSHY-Range Seismic, Geochemistry & Portfolio Update
9th Dec 202512:27 pmRNSDirector/PDMR Shareholding
13th Nov 20257:00 amRNS-RThor Energy to Present at H-NAT Paris Conference
11th Nov 20251:20 pmRNSResult of AGM
31st Oct 20257:00 amRNSQuarterly Activities and Cash Flow Report
27th Oct 20257:00 amRNSExternal Investment into EnviroCopper Limited
23rd Oct 20257:00 amRNSBinding Agreement Signed with DISA Technologies
17th Oct 20257:00 amRNSNotice of AGM
29th Sep 20257:00 amRNSResults for the year ended 30 June 2025
16th Sep 20257:00 amRNSTerm Sheet to sell FRAM JV to Tivan for A$8.75m
15th Sep 20257:00 amRNSASX Trading Halt
4th Sep 20257:00 amRNSTerm Sheet to Treat Colorado Project with DISA
13th Aug 20257:00 amRNSCompletion of Sale of 75% interest in US Uranium
30th Jul 20257:00 amRNSQuarterly Activities and Cash Flow Report
29th Jul 20258:57 amRNSIssue of Equity
25th Jul 20257:00 amRNSTerm Sheet to Sell 75% of US Uranium Claims
7th Jul 20257:00 amRNSOutstanding Geochemical Results at HY-Range
16th Jun 20257:00 amRNSGas Storage Exploration Licences - South Australia
29th May 20257:00 amRNS-RHydrogen/Helium Geochemical Survey Completed
29th Apr 20257:00 amRNSQuarterly Activities and Cash Flow Report
28th Apr 20257:00 amRNSHY-Range Exploration and Corporate Update
1st Apr 202512:00 pmRNS-RInvestor Webinar
31st Mar 20257:00 amRNSHY-Range Project Maiden Prospective Resource
14th Mar 20257:00 amRNSHalf-year report
13th Mar 20257:00 amRNSConversion of Petroleum Exploration Licence
25th Feb 20259:33 amRNSHolding(s) in Company
17th Feb 20257:00 amRNSCompletion of Acquisition and TVR
5th Feb 20257:00 amRNSAppointment of Managing Director
28th Jan 20257:00 amRNSQuarterly Activities and Cash Flow Report
27th Jan 20253:00 pmRNSHolding(s) in Company
9th Dec 20247:00 amRNSUranium Drilling
4th Dec 20247:00 amRNSDirectorate Change & Company Secretary Appointment
28th Nov 20243:15 pmRNSResult of AGM and Total Voting Rights
25th Nov 20247:00 amRNSResearch and Development Rebate and Fluorite Sale
1st Nov 20247:00 amRNSNotice of AGM
30th Oct 202411:13 amRNSHolding(s) in Company
30th Oct 20247:30 amRNSQuarterly Activities and Cash Flow Report
30th Oct 20247:00 amRNSAcquisition Announcement
28th Oct 20247:15 amRNSASX Trading Halt
25th Oct 20244:30 pmRNSEquity Fundraise and Non-binding Heads of Terms

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.