If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSunrise Resources PLC Regulatory News (SRES)

Share Price Information for Sunrise Resources PLC (SRES)

Share Price is delayed by 15 minutes
Get Live Data
0.0175    0.00 (0.00%)
Bid:
0.015
Ask:
0.02
Spread: 0.005 (33.333%)
Market Cap: £1.64m
SRES Live PriceLast checked at - London Stock Exchange

Intraday Sunrise Resources PLC Share Chart

Update on Bay State Silver Project

8 Nov 2016 14:00

RNS Number : 6278O
Sunrise Resources Plc
08 November 2016
 

 

 

 

SUNRISE RESOURCES PLC

("Sunrise" or the "Company")

 

8 November 2016

 

Update on Bay State Silver Project

 

Sunrise Resources plc (ticker symbol 'SRES'), the AIM-traded diversified mineral exploration and development company ("the Company"), is pleased to present the following summary of progress to date on its priority Bay State Silver Project and to advise that further drilling is now provisionally scheduled for next spring.

 

Project Summary:

 

· Historical production (1860s-1920s) focused on Chihuahua Vein - significant historical production including direct shipping ores up to 7,200 g/t (210 oz/t) silver.

 

· Surface samples of vein material left behind by old miners average 387 grammes/tonne silver (11.3 oz/t) silver along a 280 metre strike length of the Chihuahua vein system.

 

· Underground sampling returned:

 

Ø bonanza values up to 4kg/tonne silver (4,020g/t or 0.4% or 117oz/t) within replacement style mineralisation at end of adit over 61cm (2ft).

 

Ø over 1kg/tonne silver (1,123g/t or 33oz/t) average for 18 samples along 230m strike length to end of adit.

 

· Surface and underground sampling together suggest a c.500m minimum strike length for drill targeting.

 

· Five holes drilled to date on Chihuahua vein system. Three holes hit high grade silver mineralisation:

 

Ø 1,460 g/t silver (42.6 oz/ton) over 0.2m from 164.13m in Hole 15SRDD002.

Ø

Ø 566 g/t silver (16.5 oz/ton) over 0.5m from 70.71m in Hole 15SRDD001.

Ø

Ø 503 g/t silver (14.7 oz/ton) over 1.4m from 185.32m in Hole 15SRDD003.

 

· Fourth hole demonstrated continuity of Chihuahua vein system at 300m below surface.

 

· Further drilling provisionally scheduled for spring 2017.

 

Commenting today, Executive Chairman Patrick Cheetham said: "The Company has achieved significant progress at Bay State on a limited budget. Through surface and underground sampling on the Chihuahua vein we have demonstrated high silver grades over a strike length of around 500m and have confirmed the occurrence of bonanza grades that supported historical production of direct smelter feed grades in the past. We have drilled just five holes so far on the Chihuahua vein, three have hit high grade silver mineralisation and one has demonstrated continuity of the vein system at a depth of 300m below surface. That's an excellent strike rate and we have been successful in predicting the location of the Chihuahua Vein in all but one hole. This success was underpinned by careful and systematic sampling, and planning which is continuing. Due to the high cost of drilling in winter, it is proposed that follow-up drilling be scheduled for spring. This is likely to include further drill testing along strike south of Mining Canyon and deeper drilling beneath the existing high grade drill intersections obtained north of Mining Canyon. Further details will be provided in due course."

 

For further details of the Bay State Drill Project see the project page at: http://www.sunriseresourcesplc.com/projects/bay-state-silver-project

And various news releases at: http://www.sunriseresourcesplc.com/news-releases

 

 

Further information:

 

Sunrise Resources plc

Patrick Cheetham, Executive Chairman

Tel:

+44 (0)1625 838 884

Northland Capital Partners Limited

Nominated Adviser & Broker

Edward Hutton/David Hignell

John Howes/Rob Rees

 

Tel:

+44 (0)20 3861 6625

 

Beaufort Securities Limited

Joint Broker

Jon Belliss

Tel:

+44 (0)20 7382 8300

 

 

Notes:

 

1. This announcement contains inside information for the purposes of Article 7 of Regulation (EU) 596/2014 of the European Parliament and of the Council.

 

2. The information in this release has been compiled and reviewed by Mr. Patrick Cheetham (MIMMM, MAusIMM) who is a qualified person for the purposes of the AIM Note for Mining and Oil & Gas Companies. Mr. Cheetham is a Member of the Institute of Materials, Minerals & Mining and also a member of the Australasian Institute of Mining & Metallurgy.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCUWUURNNAARAA
Date   Source Headline
17th Aug 20217:00 amRNSUpdate: CS Pozzolan- Perlite Project
29th Jun 20217:00 amRNSBaker’s Project - Drilling Results
17th Jun 20217:00 amRNSSALE OF NON-CORE PROJECTS
27th May 20212:00 pmRNSBOARD CHANGE & ISSUE OF EQUITY
24th May 202110:18 amRNSHalf-year Report
19th May 20217:00 amRNSCS PROJECT SUCCESSFUL TEST GRIND OF POZZOLAN
14th May 20217:00 amRNSBaker’s Gold Project, Western Australia
29th Apr 20217:00 amRNSBaker’s Gold Project – Scheduled Drill Programme
16th Mar 202110:33 amRNSDirector/PDMR Shareholding
10th Mar 202110:11 amRNSAssay Results at Clayton Silver-Gold Project
4th Mar 20211:06 pmRNSCompany Presentation Webinar
26th Feb 20214:28 pmRNSTotal Voting Rights
26th Feb 20217:00 amRNSWebinar
23rd Feb 20217:00 amRNSProject Updates & Company Presentation
15th Feb 20213:54 pmRNSWarrant Exercise
8th Feb 20217:00 amRNSClayton Silver Project Drill Core Samples
3rd Feb 20211:58 pmRNSExercise of Warrants
28th Jan 20211:30 pmRNSResult of AGM
27th Jan 202112:06 pmRNSWarrant Exercise
18th Jan 20211:06 pmRNSWarrant Exercise
13th Jan 20217:00 amRNSProject Updates
22nd Dec 20207:00 amRNSPOSTING OF ANNUAL ACCOUNTS AND NOTICE OF AGM
17th Dec 20207:00 amRNSCollaborative Concrete Trials - CS Project
11th Dec 20204:33 pmRNSReplacement: Final Results
11th Dec 20202:03 pmRNSFinal Results
18th Nov 20201:54 pmRNSDirector/PDMR Shareholding
16th Nov 20207:00 amRNSProject Updates
9th Nov 20207:00 amRNSProject Update Clayton Silver-Gold Project
30th Oct 20202:41 pmRNSDirector Dealing, Issue of Equity, TVR
27th Oct 20207:00 amRNSProject Updates
16th Sep 20207:00 amRNSCS Project – Grant of Air Quality Operating Permit
2nd Sep 20208:30 amRNSCS Project Update
1st Sep 20202:27 pmRNSTotal Voting Rights
27th Aug 20207:00 amRNSPlacing - Broker Option
24th Aug 20207:00 amRNS£1 million funding, offer to existing shareholders
18th Aug 20207:00 amRNSReclamation Permit and Air Quality Permit
6th Aug 202011:00 amRNSDirector Dealing, Issue of Equity & Warrants, TVR
5th Aug 20207:00 amRNSBroker Update
5th Aug 20207:00 amRNSCS PROJECT: MINE RECLAMATION PERMIT IS GRANTED
29th Jul 20207:00 amRNSCS PROJECT: MINE PERMIT IS GRANTED
24th Jun 20207:00 amRNSCS PROJECT UPDATE
29th May 202010:54 amRNSHalf-year Report
15th May 20207:00 amRNSCS PROJECT – RELEASE OF ENVIRONMENTAL ASSESSMENT
1st May 20204:25 pmRNSTotal Voting Rights
15th Apr 20201:25 pmRNSIssue of Equity and Total Voting Rights
26th Mar 20207:00 amRNSCS PROJECT - UPDATE
19th Mar 20202:19 pmRNSResult of AGM
13th Mar 20207:00 amRNSStatement re: Annual General Meeting
2nd Mar 20204:59 pmRNSTotal Voting Rights
25th Feb 202010:37 amRNSPosting of Report and Notice of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.