If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSunrise Resources PLC Regulatory News (SRES)

Share Price Information for Sunrise Resources PLC (SRES)

Share Price is delayed by 15 minutes
Get Live Data
0.0175    0.00 (0.00%)
Bid:
0.015
Ask:
0.02
Spread: 0.005 (33.333%)
Market Cap: £1.64m
SRES Live PriceLast checked at - London Stock Exchange

Intraday Sunrise Resources PLC Share Chart

Update on Bay State Silver Project

8 Nov 2016 14:00

RNS Number : 6278O
Sunrise Resources Plc
08 November 2016
 

 

 

 

SUNRISE RESOURCES PLC

("Sunrise" or the "Company")

 

8 November 2016

 

Update on Bay State Silver Project

 

Sunrise Resources plc (ticker symbol 'SRES'), the AIM-traded diversified mineral exploration and development company ("the Company"), is pleased to present the following summary of progress to date on its priority Bay State Silver Project and to advise that further drilling is now provisionally scheduled for next spring.

 

Project Summary:

 

· Historical production (1860s-1920s) focused on Chihuahua Vein - significant historical production including direct shipping ores up to 7,200 g/t (210 oz/t) silver.

 

· Surface samples of vein material left behind by old miners average 387 grammes/tonne silver (11.3 oz/t) silver along a 280 metre strike length of the Chihuahua vein system.

 

· Underground sampling returned:

 

Ø bonanza values up to 4kg/tonne silver (4,020g/t or 0.4% or 117oz/t) within replacement style mineralisation at end of adit over 61cm (2ft).

 

Ø over 1kg/tonne silver (1,123g/t or 33oz/t) average for 18 samples along 230m strike length to end of adit.

 

· Surface and underground sampling together suggest a c.500m minimum strike length for drill targeting.

 

· Five holes drilled to date on Chihuahua vein system. Three holes hit high grade silver mineralisation:

 

Ø 1,460 g/t silver (42.6 oz/ton) over 0.2m from 164.13m in Hole 15SRDD002.

Ø

Ø 566 g/t silver (16.5 oz/ton) over 0.5m from 70.71m in Hole 15SRDD001.

Ø

Ø 503 g/t silver (14.7 oz/ton) over 1.4m from 185.32m in Hole 15SRDD003.

 

· Fourth hole demonstrated continuity of Chihuahua vein system at 300m below surface.

 

· Further drilling provisionally scheduled for spring 2017.

 

Commenting today, Executive Chairman Patrick Cheetham said: "The Company has achieved significant progress at Bay State on a limited budget. Through surface and underground sampling on the Chihuahua vein we have demonstrated high silver grades over a strike length of around 500m and have confirmed the occurrence of bonanza grades that supported historical production of direct smelter feed grades in the past. We have drilled just five holes so far on the Chihuahua vein, three have hit high grade silver mineralisation and one has demonstrated continuity of the vein system at a depth of 300m below surface. That's an excellent strike rate and we have been successful in predicting the location of the Chihuahua Vein in all but one hole. This success was underpinned by careful and systematic sampling, and planning which is continuing. Due to the high cost of drilling in winter, it is proposed that follow-up drilling be scheduled for spring. This is likely to include further drill testing along strike south of Mining Canyon and deeper drilling beneath the existing high grade drill intersections obtained north of Mining Canyon. Further details will be provided in due course."

 

For further details of the Bay State Drill Project see the project page at: http://www.sunriseresourcesplc.com/projects/bay-state-silver-project

And various news releases at: http://www.sunriseresourcesplc.com/news-releases

 

 

Further information:

 

Sunrise Resources plc

Patrick Cheetham, Executive Chairman

Tel:

+44 (0)1625 838 884

Northland Capital Partners Limited

Nominated Adviser & Broker

Edward Hutton/David Hignell

John Howes/Rob Rees

 

Tel:

+44 (0)20 3861 6625

 

Beaufort Securities Limited

Joint Broker

Jon Belliss

Tel:

+44 (0)20 7382 8300

 

 

Notes:

 

1. This announcement contains inside information for the purposes of Article 7 of Regulation (EU) 596/2014 of the European Parliament and of the Council.

 

2. The information in this release has been compiled and reviewed by Mr. Patrick Cheetham (MIMMM, MAusIMM) who is a qualified person for the purposes of the AIM Note for Mining and Oil & Gas Companies. Mr. Cheetham is a Member of the Institute of Materials, Minerals & Mining and also a member of the Australasian Institute of Mining & Metallurgy.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCUWUURNNAARAA
Date   Source Headline
25th Jul 20237:00 amRNSPioche Resource Drilling Programme in Progress
4th Jul 202312:38 pmRNSIssue of Equity & TVR
29th Jun 20237:00 amRNSReese Ridge Project Update
12th Jun 20237:00 amRNSPioche Project Update
8th Jun 202312:16 pmRNSDIRECTOR DEALING, ISSUE OF EQUITY & TVR
5th Jun 20237:00 amRNSAdditional £200,000 Investment
31st May 202311:46 amRNSHalf-year Report
23rd May 20237:00 amRNSNatural Pozzolan Association Symposium
4th May 20233:34 pmRNSTotal Voting Rights
26th Apr 20237:00 amRNSPioche Project Update
14th Apr 202311:52 amRNSHolding(s) in Company
6th Apr 202312:38 pmRNSIssue of Equity & TVR
24th Mar 20237:00 amRNSISSUE OF WARRANTS
15th Mar 20237:00 amRNSNEW MINING CLAIMS: REESE RIDGE PROJECT
17th Feb 202311:57 amRNSResult of AGM
17th Feb 20237:00 amRNSAGM Chairman’s Statement
17th Jan 20239:19 amRNSDIRECTOR DEALING, ISSUE OF EQUITY & TVR
9th Jan 20237:00 amRNSPioche claims update
22nd Dec 20227:00 amRNSAnnual Report and Notice of AGM
21st Dec 20227:00 amRNSTolsa maintain option to acquire Sepiolite Project
13th Dec 20229:23 amRNSAudited Results for the year to 30 September 2022
7th Dec 20221:54 pmRNSIssue of Convertible Security
30th Nov 20227:00 amRNS£480,000 Investment, Issue of Equity & TVR
22nd Nov 202211:55 amRNSHolding(s) in Company
25th Oct 20227:00 amRNSUpdate - Pioche Sepiolite Project
12th Oct 20227:00 amRNSBulk Sampling - Hazen Pozzolan Project, Nevada
2nd Sep 20227:00 amRNSUpdate - Pioche Sepiolite Project
31st Aug 20224:30 pmRNSTotal Voting Rights
9th Aug 20222:36 pmRNSDIRECTOR DEALING, ISSUE OF EQUITY, WARRANTS & TVR
12th Jul 202212:25 pmRNSPlacing and TVR
28th Jun 20227:00 amRNSSale Option Agreement – Pioche Sepiolite Project
27th Jun 20222:00 pmRNSCS PROJECT – CALTRANS APPROVAL TO AUTHORIZED LIST
24th May 20222:00 pmRNSHALF-YEARLY REPORT 2022
19th May 20227:00 amRNSUPDATE ON MYRTLE GOLD-SILVER PROJECT
11th May 20227:00 amRNSCS PROJECT UPDATE – CALTRANS AUTHORIZED LIST
9th May 20227:52 amRNSKEY ROLE FOR POZZOLAN IN CEMENT DECARBONISATION
4th May 20227:00 amRNSPROJECT UPDATE – CS NATURAL POZZOLAN
30th Mar 202210:57 amRNSDirector/PDMR Shareholding
8th Mar 20229:12 amRNSUPDATE - CS PROJECT
31st Jan 20223:41 pmRNSExercise of Warrants & TVR
31st Jan 202212:09 pmRNSVoting at AGM
27th Jan 20223:06 pmRNSResult of AGM
18th Jan 202210:00 amRNSARRANGEMENTS FOR 2022 AGM
10th Jan 202212:21 pmRNSDIRECTOR DEALING, ISSUE OF EQUITY & TVR
17th Dec 202111:00 amRNSANNUAL REPORT & NOTICE OF 2022 AGM
13th Dec 20217:00 amRNSAudited Results for the year to 30 September 2021
10th Nov 20214:41 pmRNSSecond Price Monitoring Extn
10th Nov 20214:35 pmRNSPrice Monitoring Extension
7th Oct 20217:00 amRNSAGREEMENT WITH KINROSS GOLD– JACKSON’S WASH CLAIMS
23rd Aug 20219:53 amRNSBaker's Gold Project - drilling update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.