Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. View here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSLE.L Regulatory News (SLE)

  • There is currently no data for SLE

Czaslaw-1 Stimulation and Test

19 Apr 2013 07:29

RNS Number : 7577C
San Leon Energy PLC
19 April 2013
 



19 April 2013

 

San Leon Energy Plc

("San Leon" or the "Company")

 

Czasław-1 Stimulation and Test

 

San Leon Energy is pleased to announce that its planned stimulation and test of the Czasław-1 well on the Company's Nowa Sol Concession in the Permian Basin of Poland will begin on April 22, 2013 with the mobilisation of coiled tubing, nitrogen lift equipment, and surface test equipment from Vechta, Germany. Recent measurements of the well have shown that the well is building pressure. After taking samples of the fluid in the wellbore the Company has recovered natural gas (including C1-C8) and light oil. Schlumberger has been contracted to complete this phase of the project. The Company estimates the following timeline:

 

·; 25 April 2013 - acid wash and clean out of the well

·; 26-30 April 2013 - acid squeeze into the Main Dolomite reservoir; after soaking lift fluids in the well bore using nitrogen, followed by 3 day flow test up to 400 bbls of oil

·; 1 May 2013 - shut-in the well for 5 day build-up with downhole gauges

·; 6 May 2013 - decision on a long term test and oil production, based upon results of the acid stimulation and test

 

The Czasław SL-1 well reached a total depth of 1,558 meters Measured Depth (1,229 meters TVD). The well penetrated 43 meters of the targeted Permian Main Dolomite reservoir. Petrophysical analysis shows moderate fracturing of the Main Dolomite within an estimated 29 meters of naturally fractured reservoir. Live oil shows were present on 90% of the core plug and detailed petrophysical and core analysis indicates moveable light oil in the Main Dolomite reservoir. The entire Main Dolomite interval shows high fluorescence suggesting both moveable and residual oil. Integrated petrophysical and rock-mechanical analyses suggest the well is a good candidate for artificial stimulation to enhance the natural fractures in the reservoir. There were no indications of water encountered during drilling. The well is the first well on the Czasław structure, with room for additional vertical and/or horizontal wells. Several similar structures have been identified in the Company's Nowa Sol 3D seismic survey which covers less than 15% of the Nowa Sol Concession area.

 

Executive Chairman, Oisin Fanning commented:

"The recent recovery of hydrocarbons and build-up of pressure in the Czasław-1 well is very exciting. We have been studying the Main Dolomite extensively over the past months with experts both in Europe and North America. We are now ready to stimulate and test the well and with success immediately move to production. There is a huge amount of oil in place in the Main Dolomite and we are committed to unlocking both the conventional and unconventional potential of the petroleum system."

 

 

For further information contact:

 

San Leon Energy Plc

Tel: +353 1291 6292

Oisin Fanning, Executive Chairman

John Buggenhagen, Exploration Director

Macquarie Capital (Europe) Limited

Tel: +44 (0) 20 3037 2000

John Dwyer

Fox Davies Capital

Tel: +44 (0) 20 3463 5000

Daniel Fox-Davies

Richard Hail

FirstEnergy Capital LLP

Tel: +44 (0) 20 7448 0200

Hugh R. Sanderson

David van Erp

Westhouse Securities (Nominated Advisor)

Tel: +44 (0) 20 7601 6100

Richard Johnson

Antonio Bossi

College Hill Associates

Tel: +44 (0) 20 7457 2020

David Simonson

Rupert Trefgarne

Alexandra Roper

 

www.sanleonenergy.com

 

Qualified person

 

John Buggenhagen, who has reviewed this update, has over 15 years experience in the oil & gas industry. He has a Ph.D. and M.Sc. in Geophysics from the University of Wyoming and a B.Sc. in Geophysics from the University of Arizona. He is currently the Director of Exploration for the San Leon Energy Group and based in San Leon's Warsaw office in Poland.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCEAKLNFAPDEEF
Date   Source Headline
29th Aug 20127:00 amRNSAward of Additional Blocks
28th Aug 20127:00 amRNSCairn Energy to farm-in to Foum Draa Block
23rd Aug 20127:00 amRNSGenel Energy to farm-in to Sidi Moussa Block
17th Aug 20122:00 pmRNSDeutsche Bank Appointed for ADR Program
16th Aug 20127:00 amRNSAppointment of Joint Corporate Broker
13th Aug 20127:01 amRNSMorocco Farm-In Agreements
20th Jul 201210:20 amRNSHolding(s) in Company
18th Jul 20127:00 amRNSDirector Dealing
17th Jul 20127:00 amRNSSuccessful completion of Szymkowo-1 well
16th Jul 20127:00 amRNSSpud of Lelechów-SL1 Well
11th Jul 20127:00 amRNSDirector Dealing
6th Jul 20127:00 amRNSAward of Czersk Concession
5th Jul 20127:00 amRNSTwo well exploration programme & JV Partnership
2nd Jul 201211:16 amRNSDirectors' Dealings
29th Jun 20127:00 amRNSFinal Results
27th Jun 20127:00 amRNSDisposal of Amstel Field Royalty for EUR 9.9m
26th Jun 20127:00 amRNSSiciny-2 Update
21st Jun 20129:11 amRNSBarryroe Update
14th Jun 20127:00 amRNSRawicz Concession Expansion
6th Jun 201210:00 amRNSBarryroe Update
6th Jun 20127:00 amRNSExpansion of Gas Acreage
1st Jun 20128:31 amRNSTotal Voting Rights
30th May 20124:35 pmRNSPrice Monitoring Extension
24th May 20129:28 amRNSBarryroe Update
21st May 20127:00 amRNSPraszka Concession Awarded
10th May 201210:01 amRNSBarryroe Update
30th Mar 201210:37 amRNSTotal Voting Rights
29th Mar 20127:07 amRNSProspective Resources Estimates
23rd Mar 201210:03 amRNSBarryroe Well Testing Update
15th Mar 20129:46 amRNSBarryroe Well
8th Mar 20127:00 amRNSSpudding of Szymkowo-1 Well
21st Feb 201210:16 amRNSAdditional Listing
14th Feb 20127:00 amRNSCompletion of Siciny-2 Well
10th Feb 20127:00 amRNSDrilling Update-Rogity-1
6th Feb 20127:00 amRNSRe Directorate
1st Feb 20127:00 amRNSChange of Name of Nominated Adviser
31st Jan 20122:30 pmRNSTotal Voting Rights
31st Jan 20127:00 amRNSAdvisory Committee
24th Jan 20127:00 amRNSCompletion of 2D Seismic
17th Jan 20127:00 amRNSAlbania Exploration Update
13th Jan 20127:00 amRNSTarfaya Oil Shale Update
23rd Dec 20117:00 amRNSBarryroe Licence
22nd Dec 20117:00 amRNSTransfer of Interest
13th Dec 201110:50 amRNSExercise of Options
13th Dec 201110:30 amRNSHolding(s) in Company
13th Dec 20119:38 amRNSHolding(s) in Company
13th Dec 20119:24 amRNSRogity-1 Well Spuds
9th Dec 201110:14 amRNSExercise of Options
8th Dec 20114:39 pmRNSHolding(s) in Company
30th Nov 20112:45 pmRNSExercise of Options

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.