Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. View here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSLE.L Regulatory News (SLE)

  • There is currently no data for SLE

Barryroe Update

10 May 2012 10:01

RNS Number : 0645D
San Leon Energy PLC
10 May 2012
Β 

ο»Ώ

10 May 2012

Β 

San Leon Energy Plc

("San Leon" or the "Company")

Barryroe Update

San Leon, the fast growing oil and gas company with an extensive portfolio of assets across Europe and North Africa, notes this morning's announcement from Providence Resources plc ("Providence") of the technical update by Providence on the Barryroe Seismic Inversion Study. San Leon announced, on 23 December 2011, that the Company has assigned its 30% working interest in Standard Exploration Licence 1/11 to Providence in exchange for a 4.5% NPI on the full field. San Leon Energy will not pay any further appraisal or development costs on the Licence and is not paying any costs towards the 48/24-10 well.

The full announcement by Providence stated the following:

Β 

Β 

BARRYROE SEISMIC INVERSION STUDY CONFIRMS SIGNIFICANT AREAL RESERVOIR POTENTIAL

Β 

Β·; MODELLING CONFIRMS THE BASAL HYDROCARBON BEARING SANDSTONE PACKAGE IS DIRECTLY MAPPABLE FROM SEISMIC DATA

Β 

Β·; SEISMIC DATA REVIEW INDICATES THE RESERVOIR IS WIDELY DEVELOPED IN THE BARRYROE AREA

Β 

Providence Resources P.l.c., ("Providence") the Irish oil and gas exploration and production company, whose shares are quoted in London (AIM) and Dublin (ESM), is pleased to provide a technical update on the Barryroe oil discovery in the North Celtic Sea Basin, offshore Ireland. Providence (80%) operates Barryroe on behalf of its partner Lansdowne Oil and Gas plc. The area lies in c. 100 metre water depth and is c. 50 km off the south coast of Ireland.

Β 

In March 2012, Providence announced the successful flow testing of both oil and gas from the 48/24-10z appraisal well (see RNS of March 15th and March 23rd, respectively). This 48/24-10z well was the 2nd well to be tested in the basal sands and the 6th well to be drilled on the Barryroe oil discovery, in which all wells have successfully logged hydrocarbons. In addition to carrying out comprehensive flow testing, significant data acquisition was also carried out utilising modern wire-line equipment. The objective of the 48/24-10z appraisal well was to capture the most comprehensive amount of data that could be used in conjunction with the data from the 5 previously drilled wells (most of which were drilled in the 1970's, and one was drilled in 1990) as well as the 3D data from the 2011 seismic programme.

Β 

The newly acquired wire-line log data have now been used to evaluate the potential to directly map the hydrocarbon bearing basal reservoir sands, which were successfully tested in the most recent Barryroe 48/24-10z well. Geokinetics, a US based seismic processing company, has carried out an evaluation of the seismic response of the main basal hydrocarbon bearing reservoir interval. This modeling has confirmed that the basal reservoir sandstone package has a defined seismic response which can be detected clearly within the inverted 3D seismic volume. A preliminary review of the inverted 3D seismic volume indicates that the reservoir sequence is widely developed in the Barryroe area. Detailed interpretation of the inverted seismic data has now commenced and will be used to better define the static oil in place estimates for the Barryroe accumulation. The results from this work are expected later this summer.

Β 

Speaking today, John O'Sullivan, Technical Director of Providence said,

Β 

"The results of the most recent seismic modeling and inversion are exceptionally encouraging as they confirm our ability to seismically image the Barryroe basal sandstone package, which tested at such great rates in the recent well. This materially helps in the mapping of the Barryroe licence area. The preliminary work also confirms that the reservoir is widely developed, which is very positive both in terms of incremental resource potential as well as our ability to accurately assess its distribution."

Β 

-ENDS-

Β 

Β 

Β 

Β 

For further information contact:

Β 

Β 

San Leon Energy Plc

Tel: + 353 1291 6292

Oisin Fanning, Executive Chairman

Β 

Macquarie Capital (Europe) Limited

Tel: +44 (0) 20 3037 2000

Paul Connolly

John Dwyer

Β 

Westhouse Securities

Richard Johnson

Antonio Bossi

Β 

Β 

Β 

Β 

Tel: +44 (0) 20 7601 6100

College Hill Associates

Tel: +44 (0) 20 7457 2020

Nick Elwes

www.sanleonenergy.com

Β 

Β 

Qualified person

Β 

John Buggenhagen, who has reviewed this update, has over 15 years experience in the oil & gas industry. He has a Ph.D. and M.Sc. in Geophysics from the University of Wyoming and a B.Sc. in Geophysics from the University of Arizona. He is currently the Director of Exploration for the San Leon Energy Group and based in San Leon's Warsaw office in Poland.

Β 

This information is provided by RNS
The company news service from the London Stock Exchange
Β 
END
Β 
Β 
MSCLIFETEAIILIF
Date   Source Headline
29th Nov 20113:21 pmRNSExercise of Options
17th Nov 20117:00 amRNSLewino 1G-2 Drilled
11th Nov 20115:47 pmRNSCompletion of acquisition
11th Nov 20119:52 amRNSCommencement of drilling
10th Nov 20115:10 pmRNSAdmission of new shares re Realm
2nd Nov 20119:10 amRNSRealm Energy shareholder approval
21st Oct 20113:15 pmRNSResults of Belvedere-1 Well
19th Oct 20117:44 amRNSBarryroe Update
18th Oct 20112:30 pmRNSNew Licencing Option
12th Oct 20113:48 pmRNSSpudding of Belvedere-1 Well
12th Oct 201110:11 amRNSRealm Energy Acquisition Update
5th Oct 201112:30 pmRNSHolding(s) in Company
3rd Oct 20115:10 pmRNSDirector/PDMR Shareholding
30th Sep 20117:00 amRNSInterim Results
29th Sep 20117:00 amRNSResults of Chopin-1 Well
26th Sep 20111:04 pmRNSCommencement of drilling
23rd Sep 201112:29 pmRNSResult of AGM
21st Sep 201111:34 amRNSRealm Energy Announcement
5th Sep 20113:17 pmRNSCommencement of drilling
1st Sep 201111:06 amRNSBelvedere -1 exploration well
31st Aug 20119:47 amRNSInvestor Presentation
26th Aug 20118:35 amRNSAcquisition of Realm Energy
12th Aug 20114:35 pmRNSPrice Monitoring Extension
2nd Aug 20117:00 amRNSCompletion of 3D Seismic
29th Jul 20117:00 amRNSDrilling Update
19th Jul 20112:09 pmRNSAdditional Listing
30th Jun 20117:00 amRNSFinal Results
23rd Jun 201110:12 amRNSOperational update
14th Jun 201110:13 amRNSHolding(s) in Company
3rd May 201111:14 amRNSCommencement of Seismic Survey
29th Mar 20117:00 amRNSOperational Update
23rd Mar 20112:28 pmRNSAdditional Listing
22nd Mar 20117:00 amRNSJoint Participation Agreement
18th Mar 20118:35 amRNSCommencement of Seismic Servey
10th Mar 20117:00 amRNSRockall Licence Update
2nd Mar 201110:18 amRNSHolding(s) in Company
8th Feb 20114:18 pmRNSAdditional Listing
4th Feb 20117:00 amRNS3D Seismic Survey Completed
3rd Feb 20117:28 amRNSReplacement: Durresi Licence Approval
3rd Feb 20117:00 amRNSDurresi Licence Approval
26th Jan 20119:50 amRNSAdditional Listing
18th Jan 20117:00 amRNSHolding(s) in Company
14th Jan 20117:00 amRNSApproval received
12th Jan 20114:44 pmRNSHolding(s) in Company
12th Jan 20117:00 amRNSRockall licence update
6th Jan 20112:14 pmRNSBoard Changes
5th Jan 201112:11 pmRNSHolding(s) in Company
31st Dec 20108:12 amRNSCompletion of Placing
30th Dec 201012:40 pmRNSResult of EGM
22nd Dec 20104:49 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.