Cobus Loots, CEO of Pan African Resources, on delivering sector-leading returns for shareholders. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSALV.L Regulatory News (SALV)

  • There is currently no data for SALV

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operational Update

16 Nov 2011 07:00

RNS Number : 1597S
3Legs Resources plc
16 November 2011
 



16 November 2011

 

3Legs Resources plc

 

Operations on Warblino LE-1H2 horizontal well

 

3Legs Resources plc (the "Company"), a company focussed on the exploration and development of unconventional oil and gas resources with a particular focus on shale gas in Europe,announces the following operational update.

 

Key points

 

·; The Warblino LE-1H2 horizontal well flowed at an initial rate of 60 to 90 mscfd of natural gas and over 1,000 bpd of fracture fluid, declining after five days of testing to approximately 18 mscfd of natural gas and 300 bpd of fracture fluid, when the well was shut-in 

·; Testing equipment has been released; further production testing proposed for spring 2012, when weather conditions are more favourable

·; The Company considers that the well could benefit from being shut in for an extended period of several months to recover from the fracture stimulation and to enable the fracture treatment fluid, potentially obstructing the flow of natural gas, to dissipate

·; Extensive coring, wireline logging, production and other data have been gathered and are being analysed in order to advance further the Company's understanding of the target formations, for reservoir assessment and for future drilling and completion designs; these analyses are expected to be completed in the first quarter of 2012

 

Baltic Basin concessions

 

Following its announcement on 26 September 2011 regarding the drilling of the Warblino LE-1 vertical pilot and LE-1H2 horizontal wells, the initial testing phase on the Warblino LE-1H2 well has been temporarily suspended. A seven stage hydraulic fracture stimulation ("frac") programme was successfully executed across the 500 metre horizontal section in the deeper lower Palaeozoic shales. This deeper zone was not included in the Competent Person's Report issued in connection with the Company's initial public offering earlier this year, as it had not been drilled in either of the Company's two (vertical) wells referred to in that report.

 

Analysis of the deeper zone indicates total organic carbon and porosity values which compare favourably to a number of US shale plays. However, the zone also presents challenges for drilling and completion (including frac design), which the Company expects to address in future operations.

 

The frac at Warblino LE-1H2 used a gelled fluid, which enabled significantly higher concentrations of sand to be delivered into the formation than can typically be achieved with a slick water solution as was used on the Lebien LE-2H well. Following the frac, the well started to unload frac fluid at over 1,000 bpd, and to flow natural gas at 60-90 mscfd. Because of the significant volumes of frac fluid, a nitrogen injection lift was initiated early to continue the flow. After five days of testing, approximately 21% of the total injected frac fluid had been recovered, and the well was continuing to produce approximately 18 mscfd of natural gas and 300 bpd of frac fluid.

 

The well was shut in after five days and the testing equipment released. The Company will continue to monitor the well over the winter period, with a view to considering further production testing in spring 2012. The Company believes that the well could benefit from being shut in for an extended period of several months to recover from the fracture stimulation and to enable the fracture fluid, potentially obstructing the flow of natural gas, to dissipate.

 

As indicated in its announcement on 26 September 2011, the Company had originally planned a longer horizontal section on the Warblino LE-1H2 well, but opted to limit the lateral length to 500 metres due to hole stability issues. The Company believes that the reduced length of the horizontal section will have had a proportional impact on the well's performance, but that data gained may enable it to overcome similar down-hole issues and to drill longer horizontal sections in future wells targeting this zone.

 

The Company is continuing its detailed analysis of data gathered from all of its wells in the Baltic Basin, including cores, logs and tests, in order to refine and update its regional geological model and potential drilling and completion designs. The Company has also acquired or agreed to acquire data from other operators in the Baltic Basin through data trades. The Company expects these analyses to be completed in the first quarter of 2012, following which it will determine a near-term exploration plan in conjunction with its venture partner ConocoPhillips.

 

Peter Clutterbuck, Chief Executive of 3Legs Resources, said:

 

"We have now concluded our 2011 drilling and testing programme for the Baltic Basin, which has achieved its objectives of completing two wells with horizontal sections and multistage fracs. We have demonstrated that shale gas can be flowed in both wells and in different horizons, and we have gathered extensive amounts of new data with which to advance further our understanding of the production potential of the reservoir. Although flow rates have been low, we expect to be able to further improve well productivity, as is often the case in other shale plays in the US at this stage of appraisal.

 

Our primary focus now is on developing improvements in hydraulic fracture and completion design which will further enhance well production rates, in addition to considering the acquisition of new 2D and 3D seismic and the drilling of a number of new wells in the near term. This is critical in order to convert this very large gas in place volume into commercial reserves. The benefits of developing a domestic energy supply from a clean fuel such as natural gas are potentially very significant, particularly in the prevailing economic climate."

 

For further information contact:

 

3Legs Resources plc

Tel:

+44 1624 811 611

Peter Clutterbuck, Chief Executive Officer

Alexander Fraser, Chief Financial Officer

Jefferies International Limited

Tel:

+44 207 029 8000

Chris Snoxall

Alex Grant

College Hill

Tel:

+44 207 457 2020

Nick Elwes

Catherine Maitland

 

 

Notes to Editors

 

3Legs Resources was established in early 2007 to focus on the exploration and development of unconventional oil and gas resources, with a particular focus on shale gas in Europe. A first mover in Poland, 3Legs Resources has acquired six licences covering approximately 1,084,000 acres (gross) in the onshore Baltic Basin, a region considered to be one of the most promising shale basins in Europe. The Company's primary targets in the Baltic Basin are the organic-rich black shales of the Lower Palaeozoic section. In addition to these assets, the Company holds onshore exploration licences over acreage near Krakow in southern Poland and in Baden-Württemberg in south-west Germany.

 

The technical information and opinions contained in this announcement have been reviewed by Peter Clutterbuck (MA Honours in Engineering, Cambridge University and former Member of the Board of the Society of Petroleum Engineers in London), Chief Executive Officer of 3Legs Resources plc, who has over 35 years of experience in the oil exploration and production industry. He has consented to the inclusion herein of such technical information and opinions.

 

www.3legsresources.com

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLGMMMMNKLGMZM
Date   Source Headline
27th Jun 20167:00 amRNSFinal Results
22nd Apr 20167:00 amRNSInvestment in Intensity Therapeutics Inc
21st Apr 20167:00 amRNSGrant from the European Commission for new product
29th Mar 20162:15 pmRNSHolding(s) in Company
22nd Mar 20167:00 amRNSFirst Day of Dealings
21st Mar 201612:38 pmRNSResult of General Meeting
21st Mar 20167:00 amRNSIntention to Float - AIM
11th Mar 20169:19 amRNSSchedule 1 update - 3Legs Resources plc
3rd Mar 20167:00 amRNSSchedule 1 - 3Legs Resources plc
3rd Mar 20167:00 amRNSReverse Takeover and Placing
4th Nov 20157:35 amRNSStatement re. Suspension
4th Nov 20157:30 amRNSSuspension - 3Legs Resoures plc
30th Sep 20157:30 amRNSHalf Yearly Report
30th Sep 20157:00 amRNSInvestment in SalvaRx Limited
4th Sep 20154:35 pmRNSPrice Monitoring Extension
31st Jul 201512:46 pmRNSResult of AGM and Grant of Options
29th Jun 20157:01 amRNSReport and Accounts and AGM Notice
29th Jun 20157:00 amRNSFinal Results
16th Jun 20154:14 pmRNSHolding(s) in Company
9th Jun 20153:30 pmRNSUpdate on investment in 3Legs Resources plc
9th Jun 20157:00 amRNSSubscription of GBP500,000 and Directorate Change
14th May 201510:35 amRNSHolding(s) in Company
14th May 20159:50 amRNSUpdate on investment in 3Legs Resources plc
1st May 20153:48 pmRNSTotal Voting Rights
29th Apr 20157:00 amRNSOptions Grant, Equity Issue, Director Resignation
10th Mar 20157:03 amRNSHolding(s) in Company
2nd Mar 20154:53 pmRNSTotal Voting Rights
23rd Feb 201510:50 amRNSTR-1: Notification of Major Interest In Shares
18th Feb 20151:33 pmRNSHolding(s) in Company
17th Feb 20155:59 pmRNSHolding(s) in Company
17th Feb 20155:56 pmRNSHolding(s) in Company
17th Feb 20155:54 pmRNSHolding(s) in Company
16th Feb 20158:05 amRNSAppointment of Joint Broker
13th Feb 201512:23 pmRNSResults of Extraordinary General Meeting
27th Jan 20151:00 pmRNSCirc re. EGM
7th Jan 201512:28 pmRNSRetirement of Directors
17th Dec 20147:00 amRNSChange of Nominated Adviser
25th Nov 201412:05 pmRNSResults of EGM and return of capital
7th Nov 201411:49 amRNSEGM and posting of Circular to Shareholders
3rd Nov 20145:47 pmRNSAdmission of Ordinary Shares to Trading on AIM
3rd Nov 20145:26 pmRNSCorporate update
22nd Oct 20149:00 amRNSAdmission of ordinary shares to trading on AIM
8th Oct 20144:30 pmRNSBoard Appointment
3rd Oct 201410:00 amRNSHolding(s) in Company
30th Sep 20147:00 amRNSInterim Results
17th Sep 20141:00 pmRNSOperations and corporate update
15th Aug 20147:00 amRNSOperations update
13th Aug 201412:01 pmRNSHolding(s) in Company
1st Aug 20147:00 amRNSOperations Update
9th Jul 20142:45 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.