Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSouth32 Regulatory News (S32)

Share Price Information for South32 (S32)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 188.90
Bid: 188.50
Ask: 189.00
Change: 4.00 (2.16%)
Spread: 0.50 (0.265%)
Open: 185.20
High: 189.50
Low: 184.60
Prev. Close: 184.90
S32 Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

3rd Quarter Results

27 Apr 2021 07:08

RNS Number : 6939W
South32 Limited
27 April 2021
 

South32 Limited

(Incorporated in Australia under the Corporations Act 2001 (Cth))

(ACN 093 732 597)

ASX, LSE, JSE Share Code: S32 ADR: SOUHY

ISIN: AU000000S320

 

27 April 2021

 

South32 LimitedQuarterly Report March 2021

 

"Strong operating performance across the portfolio during the quarter combined with improving prices for most of our commodities saw our net cash position increase to US$517 million.

"During the period we returned US$90 million to our shareholders via our on-market share buy-back bringing total returns under our capital management program to US$1.5 billion.

"We set year to date production records at Brazil Alumina and Australia Manganese. We increased our production guidance for South Africa Manganese as we continue to respond to market conditions and at Cannington off the back of continued strong underground performance.

"Having successfully completed a major furnace refurbishment at Cerro Matoso, we approved further investment in a new project that will lift future nickel production.

"We continue to reshape our portfolio, moving closer to the divestment of South Africa Energy Coal while progressing studies for our base metals development options.

"Looking ahead, we expect the global economic recovery combined with fiscal stimulus to continue, driving a rebound in metal demand and sustaining higher prices for many of our key commodities."

Graham Kerr, South32 CEO

 

 

Net cash increased by US$242M to US$517M in the quarter as we capitalised on our strong operating performance combined with improving commodity prices, partially offset by the continuation of our capital management program.

Set a year to date production record at Brazil Alumina and remain on-track to achieve nameplate production at Worsley Alumina following the completion of planned maintenance.

Set a year to date production record at Australia Manganese and increased FY21 production guidance at South Africa Manganese by 10% as we continue to respond to market conditions.

Delivered a 17% increase in year to date production at Illawarra Metallurgical Coal with the Appin dual longwall configuration continuing to deliver greater efficiencies.

Increased FY21 production guidance at Cannington by a further 10% with continued strong underground performance supporting the accelerated extraction of a higher-grade mining sequence.

No change to production guidance at all other operations.

Completed the furnace refurbishment at Cerro Matoso and approved execution of the Ore Sorting and Mechanical Ore Concentration (OSMOC) project to lift nickel processing capacity from FY23.

Committed to provide additional financial support to underpin the sustainability of South Africa Energy Coal under the ownership of Seriti, with the divestment and additional support remaining conditional on Eskom Holdings SOC Limited's final approval1.

 

 

Production summary

South32 share

9M YTD20

 9M YTD21

YoY

3Q20

2Q21

3Q21

QoQ

Alumina production (kt)

3,911

3,934

1%

1,276

1,401

1,218

(13%)

Aluminium production (kt)

741

736

(1%)

245

248

240

(3%)

Energy coal production (kt)

18,472

16,097

(13%)

5,851

5,306

4,020

(24%)

Metallurgical coal production (kt)

4,026

4,830

20%

1,167

1,399

1,568

12%

Manganese ore production (kwmt)

4,120

4,329

5%

1,307

1,459

1,409

(3%)

Payable nickel production (kt)

30.9

23.2

(25%)

10.3

6.1

7.1

16%

Payable silver production (koz)

8,597

9,477

10%

2,433

3,130

3,484

11%

Payable lead production (kt)

80.3

90.6

13%

25.0

31.2

33.0

6%

Payable zinc production (kt)

49.8

48.2

(3%)

17.3

18.0

17.8

(1%)

Unless otherwise noted: percentage variance relates to performance during the nine months ended March 2021 compared with the nine months ended March 2020 (YoY) or the March 2021 quarter compared with the December 2020 quarter (QoQ); production and sales volumes are reported on an attributable basis.

 

 

Corporate Update

 

The Group's net cash2 balance increased by US$242M during the quarter to US$517M at 31 March 2021 as we benefitted from strong operating performance combined with improving commodity prices and a partial unwind in working capital. We also received US$40M in cash and US$15M in shares from the sale of a portfolio of non-core precious metals royalties to Elemental Royalties Corp (TSX-V: ELE) which completed in the period.

We received net distributions3 of US$46M (South32 share) during the quarter from our manganese equity accounted investments (EAI) (US$98M in the nine months ended March 2021). Excess cash held in the EAI is expected to be distributed to partners in the June 2021 quarter.

Our strong financial position supported the purchase of a further 42M shares via our on-market share buy-back at an average price of A$2.78, enabling returns of US$90M in the March 2021 quarter. To 31 March 2021 the capital management program was 90% complete with US$169M remaining to be returned to shareholders ahead of its extension or expiry on 3 September 20214. Subsequent to the end of the quarter, we paid a fully-franked ordinary dividend of US$66M in respect of the December 2020 half year.

Our Operating unit costs are tracking to plan at all operations on the basis of previously disclosed exchange rate and commodity price5 assumptions.

Capital expenditure guidance of US$515M (including EAI) is unchanged, with US$23M of expenditure to be incurred at our Dendrobium Next Domain (DND) life extension project during the June 2021 half year expected to be largely offset by the deferral of sustaining capital expenditure at other Group operations due to COVID-19 restrictions and adverse weather. Expenditure guidance for DND was previously withdrawn following the decision by the Independent Planning Commission (IPC) to refuse our application for its development during the March 2021 quarter. We are currently assessing the impact of the IPC's decision on the operation and undertaking scaled back activity. We expect to provide a further update before the end of the calendar year.

Capital expenditure guidance at South Africa Energy Coal of US$64M was provided for the nine months to 31 March 2021. Guidance is not provided for the June 2021 quarter as we continue to progress our divestment of the operation.

During the quarter, we committed to provide additional financial support to underpin the sustainability of South Africa Energy Coal under the ownership of Seriti. The divestment of South Africa Energy Coal to Seriti and additional support remains conditional on Eskom Holdings SOC Limited's final approval and the approval of National Treasury for amendments to the terms of the Duvha Coal Supply Agreement1.

Our geographical earnings mix will continue to have a significant bearing on our Group effective tax rate (ETR) given differing country tax rates6. Until it is sold, South Africa Energy Coal is expected to have an ETR of 0%, with all tax assets de-recognised and no benefit to be recorded for losses made prior to its planned divestment. Following its divestment we expect the Group's Underlying ETR to more closely reflect the corporate tax rates applicable to the Group. While it is difficult to predict our ETR (excluding EAI), it is expected to remain elevated in FY21 (H1 FY21: 52.8%).

 

 

Development and Exploration Update

 

We directed US$11M in the nine months ended March 2021 to regional exploration programs at Hermosa as drilling activity that had been impacted by COVID-19 restrictions resumed. We continue to progress our pre-feasibility study for the Taylor Deposit with work expected to be completed in the June 2021 quarter, ahead of a market update being provided. A separate scoping study for the Clark Deposit focussed on metallurgy and the manganese battery chemicals market is also underway, with completion expected in H1 FY22.

The Ambler Metals Joint Venture entered into an agreement with the Alaska Industrial Development and Export Authority (AIDEA) for shared pre-development costs for a 340km road to access the Ambler region. Federal permits for construction of the road have been received by AIDEA, with pre-development costs of US$17.5M (South32 share) expected to be incurred over four years to deliver feasibility and permitting activities, ahead of reaching a decision on construction of the project by the end of CY24. Of this total commitment to be funded from the Joint Venture, we expect to spend US$3.3M (South32 share) in the CY21 field season, with AIDEA having also entered into a land access agreement with Alaska Native regional corporation Doyon, Limited (Doyon) covering areas owned and managed by Doyon along the proposed route for the road.

Consistent with our strategy, that includes partnering with companies to fund early stage greenfield exploration opportunities, we invested US$12M in the nine months ended March 2021. Although the risks associated with COVID-19 persist across a majority of our exploration jurisdictions, our partners in the United States and Peru were able to progress drilling, while fieldwork also resumed in Australia, Ireland and elsewhere in South America during the March 2021 quarter.

We directed US$28M towards exploration programs at our existing operations and development options in the nine months ended March 2021 (US$22M capitalised), including US$2M for our EAI (US$1M capitalised), and US$11M at Hermosa as noted above (all capitalised).

 

 

Production Summary

Production guidance(South32 share) 

 

FY20

9M YTD21

FY21e(a)

Comments

Worsley Alumina

Alumina production (kt)

3,886

2,885

3,965

Brazil Alumina

Alumina production (kt)

1,383

1,049

1,370

Hillside Aluminium7

Aluminium production (kt)

718

537

720

Mozal Aluminium7

Aluminium production (kt)

268

199

273

South Africa Energy Coal

Energy coal production (kt)

22,672

15,007

N/A

Guidance not provided as we continue to progress divestment of the operation

Domestic coal production (kt)

12,552

8,581

N/A

Export coal production (kt)

10,120

6,426

N/A

Illawarra Metallurgical Coal

Total coal production (kt)

7,006

5,920

8,000

Metallurgical coal production (kt)

5,549

4,830

6,400

Energy coal production (kt)

1,457

1,090

1,600

Australia Manganese

Manganese ore production (kwmt)

3,470

2,663

3,500

South Africa Manganese

Manganese ore production8 (kwmt)

1,878

1,666

2,200

Guidance increased by 10% (subject to market demand)

Cerro Matoso

Payable nickel production (kt)

40.6

23.2

34.6

Cannington

Payable zinc equivalent production9 (kt)

332.6

264.1

382.6

Guidance increased by a further 10%

Payable silver production (koz)

11,792

9,477

13,700

Payable lead production (kt)

110.4

90.6

130.7

Payable zinc production (kt)

66.7

48.2

69.2

a. The denotation (e) refers to an estimate or forecast year. All guidance is subject to further potential impacts from COVID-19.

 

 

Worsley Alumina(86% share)

South32 share

9M YTD20

9M YTD21

YoY

3Q20

2Q21

3Q21

3Q21vs3Q20

3Q21vs2Q21

Alumina production (kt)

2,869

2,885

1%

936

1,047

875

(7%)

(16%)

Alumina sales (kt) 

2,751

2,918

6%

860

1,077

840

(2%)

(22%)

 

Worsley Alumina saleable alumina production increased by 1% (or 16kt) to 2,885kt in the nine months ended March 2021. Alumina hydrate production increased by 4% (or 116kt) to a record 2,989kt in the same period, with the input circuit operating above nameplate capacity of 4.6Mtpa (100% basis).

FY21 production guidance remains unchanged at 3,965kt with the refinery expected to drawdown established hydrate stocks following the successful completion of planned calciner maintenance in the March 2021 quarter.

 

 

Brazil Alumina(36% share)

South32 share

9M YTD20

9M YTD21

YoY

3Q20

2Q21

3Q21

3Q21vs3Q20

3Q21vs2Q21

Alumina production (kt)

1,042

1,049

1%

340

354

343

1%

(3%)

Alumina sales (kt) 

1,014

1,058

4%

336

334

384

14%

15%

 

Brazil Alumina saleable production increased by 1% (or 7kt) to a record 1,049kt in the nine months ended March 2021 as the refinery continued to benefit from strong plant availability, realising the benefits of the De-bottlenecking Phase One project. 

FY21 production guidance remains unchanged at 1,370kt.

 

 

Hillside Aluminium(100%)

South32 share

9M YTD20

9M YTD21

YoY

3Q20

2Q21

3Q21

3Q21vs3Q20

3Q21vs2Q21

Aluminium production (kt)

540

537

(1%)

178

181

176

(1%)

(3%)

Aluminium sales (kt) 

524

538

3%

174

172

191

10%

11%

 

Hillside Aluminium saleable production decreased by 1% (or 3kt) to 537kt in the nine months ended March 2021 as the smelter continued to test its maximum technical capacity, despite the impact from increased load-shedding. FY21 production guidance7 remains unchanged at 720kt.

The new energy supply agreement for the smelter is currently with the National Energy Regulator of South Africa for review. The new agreement is to cover power supplied for a 10-year period with a tariff that is South African rand based, and a rate of escalation linked to the South Africa Producer Price Index.

 

 

Mozal Aluminium(47.1% share)

South32 share

9M YTD20

9M YTD21

YoY

3Q20

2Q21

3Q21

3Q21vs3Q20

3Q21vs2Q21

Aluminium production (kt)

201

199

(1%)

67

67

64

(4%)

(4%)

Aluminium sales (kt) 

201

194

(3%)

65

66

64

(2%)

(3%)

 

Mozal Aluminium saleable production decreased by 1% (or 2kt) to 199kt in the nine months ended March 2021 with the smelter continuing to perform strongly despite the impact of load-shedding and workforce restrictions related to COVID-19 in the quarter. Notwithstanding the ongoing impact of restrictions, FY21 production is expected to approach guidance7 of 273kt.

 

 

South Africa Energy Coal(100%)

South32 share

9M YTD20

9M YTD21

YoY

3Q20

2Q21

3Q21

3Q21vs3Q20

3Q21vs2Q21

Energy coal production (kt)

17,444

15,007

(14%)

5,659

4,980

3,764

(33%)

(24%)

Domestic sales (kt) 

9,632

8,552

(11%)

2,944

2,920

2,025

(31%)

(31%)

Export sales (kt)

7,535

6,576

(13%)

2,681

2,210

1,879

(30%)

(15%)

 

South Africa Energy Coal saleable production decreased by 14% (or 2.4Mt) to 15.0Mt in the nine months ended March 2021 with reduced demand from Eskom impacting domestic sales. Export sales declined during the March 2021 quarter, impacted by disruptions to third party rail logistics and our decision to reduce activity in uneconomic pits to maximise margins.

Our export sales realised a discount of approximately 30% to the API4 (6,000Kcal) index10 in the nine months ended March 2021, as we produced a greater share of lower calorific product. Given the impact of lower realised prices, lower volumes, and a stronger South African rand, the operation remained loss-making in the March 2021 quarter.

Production guidance is not provided for the June 2021 quarter as we continue to progress our divestment of the operation, although we do expect production volumes to increase as rail logistics normalise.

 

 

Illawarra Metallurgical Coal(100%)

South32 share

9M YTD20

9M YTD21

YoY

3Q20

2Q21

3Q21

3Q21vs3Q20

3Q21vs2Q21

Total coal production (kt)

5,054

5,920

17%

1,359

1,725

1,824

34%

6%

Total coal sales11(kt)

5,213

5,850

12%

1,594

2,087

1,823

14%

(13%)

Metallurgical coal production (kt)

4,026

4,830

20%

1,167

1,399

1,568

34%

12%

Metallurgical coal sales (kt)

4,198

4,707

12%

1,398

1,697

1,542

10%

(9%)

Energy coal production (kt)

1,028

1,090

6%

192

326

256

33%

(21%)

Energy coal sales (kt)

1,015

1,143

13%

196

390

281

43%

(28%)

 

Illawarra Metallurgical Coal saleable production increased by 17% (or 0.9Mt) to 5.9Mt in the nine months ended March 2021 as the return to a three longwall configuration continued to deliver greater efficiencies through the operation of alternate dual longwalls at the Appin mine and we monetised further low-margin coal wash material. While this product attracts considerable grade and product-type discounts to the API5 (5,500Kcal) index12 for our energy coal sales, the incremental volume benefits our Operating unit costs by eliminating coal waste emplacement.

FY21 production guidance remains unchanged at 8.0Mt with a longwall move scheduled at Appin in the June 2021 quarter.

 

 

Australia Manganese(60% share)

South32 share

9M YTD20

9M YTD21

YoY

3Q20

2Q21

3Q21

3Q21vs3Q20

3Q21vs2Q21

Manganese ore production (kwmt)

2,616

2,663

2%

841

954

829

(1%)

(13%)

Manganese ore sales (kwmt)

2,512

2,730

9%

775

871

865

12%

(1%)

Manganese alloy production (kt)

81

51

(37%)

24

24

-

(100%)

(100%)

Manganese alloy sales (kt)

89

59

(34%)

31

33

-

(100%)

(100%)

 

Australia Manganese saleable ore production increased by 2% (or 47kwmt) to a record 2,663kwmt in the nine months ended March 2021. The primary concentrator continued to achieve strong output despite the impact of the wet season in the March 2021 quarter, while output from the PC02 circuit remained above nameplate capacity, contributing 10% of total production (9M YTD20: 11%).

While we continue to monitor the potential for further impact from the wet season, FY21 production guidance remains unchanged at 3,500kwmt.

We did not produce any manganese alloy in the March 2021 quarter following our divestment of the TEMCO manganese alloy smelter.

 

 

South Africa Manganese(60% share)

South32 share

9M YTD20

9M YTD21

YoY

3Q20

2Q21

3Q21

3Q21vs3Q20

3Q21vs2Q21

Manganese ore production8 (kwmt)

1,504

1,666

11%

466

505

580

24%

15%

Manganese ore sales8 (kwmt)

1,549

1,600

3%

476

586

497

4%

(15%)

Manganese alloy production (kt)

48

-

(100%)

14

-

-

(100%)

0%

Manganese alloy sales (kt)

48

11

(77%)

20

3

-

(100%)

(100%)

 

South Africa Manganese saleable ore production increased by 11% (or 162kwmt) to 1,666kwmt in the nine months ended March 2021, as we increased volumes of higher quality premium material from our Mamatwan mine and lifted our use of opportunistic, higher cost trucking. Ore production in the March 2021 quarter was 15% higher following completion of planned maintenance at the Mamatwan mine in the prior quarter. March 2021 quarter ore sales volumes declined by 15%, with third party rail logistics impacted by wet weather and shipments slipping into the June 2021 quarter following the declaration of force majeure by Transnet.

FY21 production guidance has been increased by 10% to 2,200kwmt as we continue to respond to market conditions by utilising higher cost trucking capacity. We will continue to monitor market demand and the potential for further disruption due to adverse weather.

We did not produce any manganese alloy in the nine months ended March 2021 as our Metalloys smelter remained on care and maintenance.

 

 

Cerro Matoso(99.9% share)

South32 share

9M YTD20

9M YTD21

YoY

3Q20

2Q21

3Q21

3Q21vs3Q20

3Q21vs2Q21

Payable nickel production (kt)

30.9

23.2

(25%)

10.3

6.1

7.1

(31%)

16%

Payable nickel sales (kt)

30.6

23.2

(24%)

10.2

6.1

6.7

(34%)

10%

 

Cerro Matoso payable nickel production decreased by 25% (or 7.7kt) to 23.2kt in the nine months ended March 2021 following completion of a major refurbishment at one of the furnaces in the quarter. FY21 production guidance remains unchanged at 34.6kt, having completed the furnace ramp-up to normalised rates.

Payable nickel sales increased by 10% during the March 2021 quarter as production volumes lifted. While our ferronickel product sells with reference to the LME Nickel index price on a M or M+1 basis it continues to attract product discounts of approximately 10%.

Following approval to develop the low capital, higher-grade Q&P project in the December 2020 quarter, which supported an increase in our FY21 and FY22 production guidance, the Ore Sorting and Mechanical Ore Concentration (OSMOC) project was approved to proceed to execution during the March 2021 quarter. The OSMOC project is expected to deliver increased payable nickel production of up to 10% from FY23 through expanded processing capacity and improvements to the upgrading circuit to lift average ore grades13. The project has an anticipated capital spend of US$24M with US$4M expected in the June 2021 quarter.

Further to the orders issued by the Constitutional Court of Colombia in April 2018, the operation was granted a new environmental licence in the March 2021 quarter. With this licence, and our ongoing provision of health care to the community members, all outstanding orders issued have been satisfied and we have moved to a monitoring phase.

 

 

Cannington(100% share)

South32 share

9M YTD20

9M YTD21

YoY

3Q20

2Q21

3Q21

3Q21vs3Q20

3Q21vs2Q21

Payable zinc equivalent production9 (kt)

243.4

264.1

9%

74.7

90.7

96.8

30%

7%

Payable silver production (koz)

8,597

9,477

10%

2,433

3,130

3,484

43%

11%

Payable silver sales (koz)

8,538

9,276

9%

2,626

3,359

2,950

12%

(12%)

Payable lead production (kt)

80.3

90.6

13%

25.0

31.2

33.0

32%

6%

Payable lead sales (kt)

74.6

89.8

20%

22.8

31.9

28.4

25%

(11%)

Payable zinc production (kt)

49.8

48.2

(3%)

17.3

18.0

17.8

3%

(1%)

Payable zinc sales (kt)

49.7

47.7

(4%)

14.4

20.0

15.9

10%

(21%)

 

Cannington payable zinc equivalent production increased by 9% (or 20.7kt) to 264.1kt in the nine months ended March 2021 following strong underground mine performance which has supported the acceleration of a higher-grade mining sequence. As a result of the continued strong operating performance and expectation of higher grades in the June 2021 quarter we have further increased FY21 zinc equivalent production guidance by 10% to 382.6kt (silver 13,700koz, lead 130.7kt and zinc 69.2kt). FY22 production guidance remains unchanged at this time.

Notwithstanding the strong production performance, sales were negatively impacted in the March 2021 quarter as a result of weather related timing disruptions to rail logistics that are expected to unwind in the June 2021 quarter.

We have initiated a pre-feasibility study to assess the potential to transition the underground mine to a truck haulage operation, from the current truck/shaft configuration. The change in configuration is a low cost capital option that has the potential to bring forward further higher-grade material from FY23 at current operating costs and throughput rates.

 

 

Notes:

1. Refer to the market announcement "Agreement to Divest South Africa Energy Coal" dated 6 November 2019. Purchaser includes Thabong Coal Proprietary Limited, a wholly-owned subsidiary of Seriti, and two trusts for the benefit of employees and communities. Refer to the market announcement "South Africa Energy Coal Divestment Update" dated 1 April 2021. Final material conditions include approval from Eskom Holdings SOC Limited for the transfer of our shareholding and amendments to the terms of the Duvha Coal Supply Agreement, with the latter also subject to National Treasury consent.

2. Net cash number is unaudited and should not be considered as an indication of or alternative to an IFRS measure of profitability, financial performance or liquidity.

3. Net distributions from equity accounted investments includes net debt movements and dividends, which are unaudited and should not be considered as an indication of or alternative to an IFRS measure of profitability, financial performance or liquidity.

4. Since inception, US$1.2B has been allocated to the on-market share buy-back (585M shares at an average price of A$2.86 per share) and US$292M returned in the form of special dividends.

5. FY21 Operating unit cost guidance includes royalties (where appropriate) and the influence of exchange rates, and includes various assumptions for FY21, including: an alumina price of US$270/t; an average blended coal price (including coal wash sales) of US$96/t for Illawarra Metallurgical Coal; a manganese ore price of US$4.55/dmtu for 44% manganese product; a nickel price of US$7.51/lb; a thermal coal price of US$77/t (API4) for South Africa Energy Coal; a silver price of US$25.15/troy oz; a lead price of US$1,952/t (gross of treatment and refining charges); a zinc price of US$2,597/t (gross of treatment and refining charges); an AUD:USD exchange rate of 0.75; a USD:ZAR exchange rate of 15.69; a USD:COP exchange rate of 3,594; and a reference price for caustic soda; all of which reflected forward markets as at January 2021 or our internal expectations.

6. The primary corporate tax rates applicable to the Group for FY21 include: Australia 30%, South Africa 28%, Colombia 31%, Mozambique 0% and Brazil 34%. The Colombian corporate tax rate is 31% in CY21 and will decrease to 30% from 1 January 2022. The Mozambique operations are subject to a royalty on revenues instead of income tax.

7. Production guidance for Hillside Aluminium and Mozal Aluminium does not assume any load-shedding impact on production.

8. Consistent with the presentation of South32's segment information, South Africa Manganese ore production and sales have been reported at 60%. The Group's financial statements will continue to reflect a 54.6% interest in South Africa Manganese ore.

9. Payable zinc equivalent production (kt) was calculated by aggregating revenues from payable silver, lead and zinc, and dividing the total Revenue by the price of zinc. FY20 realised prices for zinc (US$1,416/t), lead (US$1,648/t) and silver (US$16.5/oz) have been used for FY20, 9M YTD21 and FY21e.

10. The sales volume weighted average of the Argus McCloskey API4 Coal index 6,000Kcal NAR (FOB Richards Bay, South Africa) on a basis of a one month lag to published pricing (Month minus one or "M-1") was US$67/t in the nine months ended March 2021.

11. Illawarra Metallurgical Coal sales are adjusted for moisture and will not reconcile directly to Illawarra Metallurgical Coal production.

12. The sales volume weighted average of the Argus McCloskey API5 Coal index 5,500Kcal NAR (FOB Newcastle, Australia) on a basis of a one month lag to published pricing (Month minus one or "M-1") was US$42/t in the nine months ended March 2021.

13. The information in this report that relates to the production target is based on Proved and Probable Ore Reserves (87%), and Measured (12%) and Indicated (1%) Mineral Resources for Cerro Matoso. Mineral Resources and Ore Reserve estimates for Cerro Matoso was declared as part of South32's Annual Resource and Reserve declaration in the Annual Report 2020 (www.south32.net) issued on 4 September 2020 and prepared by E Espitia (MAusIMM) and N Monterroza (MAusIMM) in accordance with the requirements of the JORC Code. South32 confirms that it is not aware of any new information or data that materially affects the information included in the original announcement. All material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. South32 confirms that the form and context in which the Competent Person's findings are presented have not been materially modified from the original market announcement. Payable nickel is calculated using long term consensus metal prices and relative metallurgical recoveries.

The following abbreviations have been used throughout this report: US$ million (US$M); US$ billion (US$B); grams per tonne (g/t); tonnes (t); thousand tonnes (kt); thousand tonnes per annum (ktpa); million tonnes (Mt); million tonnes per annum (Mtpa); ounces (oz); thousand ounces (koz); million ounces (Moz); thousand wet metric tonnes (kwmt); million wet metric tonnes (Mwmt); million wet metric tonnes per annum (Mwmt pa); thousand dry metric tonnes (kdmt).

Figures in Italics indicate that an adjustment has been made since the figures were previously reported. The denotation (e) refers to an estimate or forecast year.

 

 

Operating Performance

South32 share

9M YTD20

9M YTD21

3Q20

4Q20

1Q21

2Q21

3Q21

Worsley Alumina (86% share)

Alumina hydrate production (kt)

2,873

2,989

963

967

1,010

1,002

977

Alumina production (kt)

2,869

2,885

936

1,017

963

1,047

875

Alumina sales (kt)

2,751

2,918

860

1,031

1,001

1,077

840

Brazil Alumina (36% share)

Alumina production (kt)

1,042

1,049

340

341

352

354

343

Alumina sales (kt)

1,014

1,058

336

378

340

334

384

Hillside Aluminium (100%)

Aluminium production (kt)

540

537

178

178

180

181

176

Aluminium sales (kt)

524

538

174

199

175

172

191

Mozal Aluminium (47.1% share)

Aluminium production (kt)

201

199

67

67

68

67

64

Aluminium sales (kt)

201

194

65

78

64

66

64

South Africa Energy Coal (100%)

Energy coal production (kt)

17,444

15,007

5,659

5,228

6,263

4,980

3,764

Domestic sales (kt)

9,632

8,552

2,944

3,006

3,607

2,920

2,025

Export sales (kt)

7,535

6,576

2,681

2,180

2,487

2,210

1,879

Illawarra Metallurgical Coal (100%)

Total coal production (kt)

5,054

5,920

1,359

1,952

2,371

1,725

1,824

Total coal sales11(kt)

5,213

5,850

1,594

2,071

1,940

2,087

1,823

Metallurgical coal production (kt)

4,026

4,830

1,167

1,523

1,863

1,399

1,568

Metallurgical coal sales (kt)

4,198

4,707

1,398

1,644

1,468

1,697

1,542

Energy coal production (kt)

1,028

1,090

192

429

508

326

256

Energy coal sales (kt)

1,015

1,143

196

427

472

390

281

Australia Manganese (60% share)

Manganese ore production (kwmt)

2,616

2,663

841

854

880

954

829

Manganese ore sales (kwmt)

2,512

2,730

775

928

994

871

865

Ore grade sold (%, Mn)

44.8

44.4

44.4

43.9

44.3

44.5

44.4

Manganese alloy production (kt)

81

51

24

29

27

24

-

Manganese alloy sales (kt) 

89

59

31

27

26

33

-

South Africa Manganese (60% share)

Manganese ore production8 (kwmt)

1,504

1,666

466

374

581

505

580

Manganese ore sales8 (kwmt)

1,549

1,600

476

316

517

586

497

Ore grade sold (%, Mn)

39.9

40.1

39.8

40.8

39.7

40.0

40.6

Manganese alloy production (kt)

48

-

14

5

-

-

-

Manganese alloy sales (kt) 

48

11

20

7

8

3

-

Cerro Matoso (99.9% share)

Ore mined (kwmt)

2,041

2,064

641

798

645

825

594

Ore processed (kdmt)

2,082

1,683

693

679

698

457

528

Ore grade processed (%, Ni)

1.66

1.58

1.67

1.59

1.58

1.55

1.60

Payable nickel production (kt) 

30.9

23.2

10.3

9.7

10.0

6.1

7.1

Payable nickel sales (kt)

30.6

23.2

10.2

10.0

10.4

6.1

6.7

Cannington (100%)

Ore mined (kwmt)

2,066

2,123

706

726

700

709

714

Ore processed (kdmt)

2,095

2,026

701

744

630

672

724

Silver ore grade processed (g/t, Ag)

155

175

134

161

169

179

177

Lead ore grade processed (%, Pb)

4.7

5.4

4.5

4.8

5.0

5.2

5.8

Zinc ore grade processed (%, Zn)

3.4

3.4

3.6

3.2

2.9

3.7

3.5

Payable zinc equivalent production9 (kt)

243.4

264.1

74.7

89.2

76.6

90.7

96.8

Payable silver production (koz)

8,597

9,477

2,433

3,195

2,863

3,130

3,484

Payable silver sales (koz)

8,538

9,276

2,626

3,571

2,967

3,359

2,950

Payable lead production (kt)

80.3

90.6

25.0

30.1

26.4

31.2

33.0

Payable lead sales (kt)

74.6

89.8

22.8

33.5

29.5

31.9

28.4

Payable zinc production (kt)

49.8

48.2

17.3

16.9

12.4

18.0

17.8

Payable zinc sales (kt)

49.7

47.7

14.4

19.0

11.8

20.0

15.9

 

 

Forward-looking statements

This release contains forward-looking statements, including statements about trends in commodity prices and currency exchange rates; demand for commodities; production forecasts; plans, strategies and objectives of management; capital costs and scheduling; operating costs; anticipated productive lives of projects, mines and facilities; and provisions and contingent liabilities. These forward-looking statements reflect expectations at the date of this release, however they are not guarantees or predictions of future performance. They involve known and unknown risks, uncertainties and other factors, many of which are beyond our control, and which may cause actual results to differ materially from those expressed in the statements contained in this release. Readers are cautioned not to put undue reliance on forward-looking statements. Except as required by applicable laws or regulations, the South32 Group does not undertake to publicly update or review any forward-looking statements, whether as a result of new information or future events. Past performance cannot be relied on as a guide to future performance. South32 cautions against reliance on any forward-looking statements or guidance, particularly in light of the current economic climate and the significant volatility, uncertainty and disruption arising in connect with COVID-19.

 

 

Further information

 

Investor Relations

Tom GallopT +61 8 9324 9030

M +61 439 353 948

E Tom.Gallop@south32.net

Media Relations

Rebecca Keenan

T +61 8 9324 9364

M +61 402 087 055

E Rebecca.Keenan@south32.net

 

Jenny WhiteT +44 20 7798 1773

M +44 7900 046 758

E Jenny.White@south32.net

 

27 April 2021Approved for release by Nicole Duncan, Company Secretary, South32 LimitedJSE Sponsor: UBS South Africa (Pty) Ltd

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
QRTFIFEESDIDFIL
Date   Source Headline
22nd Apr 20247:00 amRNSQuarterly Report: March 2024
20th Mar 20247:34 amRNSAustralia Manganese Update
18th Mar 20247:50 amRNSAustralia Manganese Update
14th Mar 20247:55 amRNS2024 Interim Dividend Currency Exchange Rates
14th Mar 20247:43 amRNSUpdate to Notification of Dividend
29th Feb 20247:00 amRNSSale of Illawarra Metallurgical Coal
15th Feb 20247:10 amRNS2024 Half Year Financial Results Presentation
15th Feb 20247:03 amRNSFinal Share Buy-Back Notice (Appendix 3F)
15th Feb 20247:00 amRNSFinancial Results: Half Year Ended 31.12.2023
15th Feb 20247:00 amRNSNotification of Dividend (Appendix 3A)
15th Feb 20247:00 amRNSFinal Approval to Develop Hermosa's Taylor Deposit
9th Feb 20248:38 amRNS2024 Calendar of Key Dates
22nd Jan 20247:00 amRNSQuarterly Report December 2023
12th Jan 20248:12 amRNSNotification of Securities
5th Dec 20238:24 amRNSNotification of Securities
5th Dec 20238:14 amRNSNotification of Dealing Form
28th Nov 20239:59 amRNSDirectorate Change
1st Nov 20239:12 amRNSTotal Voting Rights
26th Oct 202310:08 amRNS2023 AGM Voting Results
26th Oct 20237:57 amRNS2023 AGM: Chair and CEO Address
23rd Oct 20237:00 amRNSQuarterly Report - September 2023
18th Oct 20238:37 amRNSDaily Share Buy-Back Notice
17th Oct 20238:21 amRNSDaily Share Buy-Back Notice
16th Oct 20239:02 amRNSDaily Share Buy-Back Notice
13th Oct 20238:38 amRNSDaily Share Buy-Back Notice
11th Oct 20238:56 amRNSDaily Share Buy-Back Notice
10th Oct 20238:29 amRNSNotification of Securities
4th Oct 20238:21 amRNSDaily Share Buy-Back Notice
3rd Oct 20239:14 amRNSDaily Share Buy-Back Notice
2nd Oct 20238:37 amRNSTotal Voting Rights
2nd Oct 20238:30 amRNSDaily Share Buy-Back Notice
29th Sep 20238:38 amRNSDaily Share Buy-Back Notice
27th Sep 20237:29 amRNSDaily Share Buy-Back Notice
21st Sep 20239:14 amRNSUpdate to Notification of Dividend
21st Sep 20239:09 amRNS2023 Final Dividend Currency Exchange Rates
21st Sep 20238:56 amRNSDaily Share Buy-Back Notice
20th Sep 20238:58 amRNSDaily Share Buy-Back Notice
19th Sep 20238:37 amRNSDaily Share Buy-Back Notice
18th Sep 20238:51 amRNSDaily Share Buy-Back Notice
15th Sep 20239:16 amRNSNotice of AGM
15th Sep 20239:09 amRNSDaily Share Buy-Back Notice
13th Sep 202310:08 amRNSDaily Share Buy-Back Notice
8th Sep 20237:17 amRNSDaily Share Buy-Back Notice
8th Sep 20237:01 amRNSPayments to Government Report
8th Sep 20237:00 amRNSAnnual Report
7th Sep 20238:59 amRNSDaily Share Buy-Back Notice
6th Sep 20238:49 amRNSDaily Share Buy-Back Notice
31st Aug 20238:48 amRNSDaily Share Buy-Back Notice
29th Aug 20239:09 amRNSNotification of Securities
29th Aug 20238:55 amRNSNotification of Dealing Form

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.